EBK PRODUCTION AND OPERATIONS ANALYSIS
7th Edition
ISBN: 9781478628385
Author: Olsen
Publisher: WAVELAND PRESS (ECONTENT)
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 12, Problem 59AP
Summary Introduction
Interpretation: Graphical representation of AOQ for manufacturer A and B
Concept Introduction: Average Outgoing Quality curve (AOQ) is the curve that represents the quality of both the incoming as well as the outgoing material, assuming the hundred percent inspections of rejected lots and also the inspected defective materials are either removed, revised or exchanged.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Calculate the process capability (show your method). Is it acceptable? Comment on this result.
I obtained a ridge regression model by k-fold cross-validation using cv_glmnet in R. I need to calculate adjusted R^2 and VIFs for it but I don't know how
2) The specification for a Lindemann’s stainless steel chimney liner requires a thickness of 7.1 mm ± 0.1 mm. The firm’s quality analyst determines that the liner process operates at a mean thickness of 7.13 mm with the standard deviation of the process being 0.02 mm.
a) Calculate the upper and the lower limits for the stainless steel chimney liner.
b) Calculate the Cpand Cpkfor this process.
Hint:
Cp = (Upper Specification Limit – Lower Specification Limit)/6sigma
Cpk = minimum of [(Upper Specification Limit – Xbar)/3sigma], [(Xbar – Lower Specification Limit)/3sigma]
Chapter 12 Solutions
EBK PRODUCTION AND OPERATIONS ANALYSIS
Ch. 12.1 - Prob. 2PCh. 12.1 - Prob. 3PCh. 12.1 - Prob. 4PCh. 12.1 - Prob. 5PCh. 12.1 - Prob. 6PCh. 12.2 - Prob. 7PCh. 12.2 - Prob. 8PCh. 12.2 - Prob. 9PCh. 12.2 - Prob. 10PCh. 12.2 - Prob. 11P
Ch. 12.2 - Prob. 12PCh. 12.2 - Prob. 13PCh. 12.3 - Prob. 14PCh. 12.3 - Prob. 15PCh. 12.3 - Prob. 16PCh. 12.3 - Prob. 17PCh. 12.4 - Prob. 18PCh. 12.4 - Prob. 19PCh. 12.4 - Prob. 20PCh. 12.4 - Prob. 21PCh. 12.5 - Prob. 22PCh. 12.6 - Prob. 23PCh. 12.6 - Prob. 24PCh. 12.6 - Prob. 25PCh. 12.6 - Prob. 26PCh. 12.6 - Prob. 27PCh. 12.6 - Prob. 28PCh. 12.9 - Prob. 29PCh. 12.9 - Prob. 30PCh. 12.9 - Prob. 31PCh. 12.9 - Prob. 32PCh. 12.9 - Prob. 33PCh. 12.10 - Prob. 34PCh. 12.10 - Prob. 35PCh. 12.10 - Prob. 37PCh. 12.10 - Prob. 38PCh. 12.10 - Prob. 39PCh. 12.10 - Prob. 40PCh. 12.11 - Prob. 41PCh. 12.11 - Prob. 42PCh. 12.11 - Prob. 43PCh. 12.11 - Prob. 44PCh. 12.12 - Prob. 46PCh. 12.12 - Prob. 47PCh. 12.12 - Prob. 48PCh. 12 - Prob. 49APCh. 12 - Prob. 50APCh. 12 - Prob. 51APCh. 12 - Prob. 52APCh. 12 - Prob. 53APCh. 12 - Prob. 54APCh. 12 - Prob. 55APCh. 12 - Prob. 57APCh. 12 - Prob. 58APCh. 12 - Prob. 59APCh. 12 - Prob. 60APCh. 12 - Prob. 61APCh. 12 - Prob. 62APCh. 12 - Prob. 63APCh. 12 - Prob. 64APCh. 12 - Prob. 65APCh. 12 - Prob. 66APCh. 12 - Prob. 67APCh. 12 - Prob. 68APCh. 12 - Prob. 69APCh. 12 - Prob. 70AP
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- 1.Conduct a qualitative risk assessment for climate change, soil erosion, market volatility, and supply chain using a Venn-diagram to indicate the likelihood%, category, frequency, severity, and RHC score for corn. 2.Plot the risks from the Venn diagram on a Risk Heat Map/Chart.arrow_forwardIn a sausage factory, quality managers are studying the compliance of the sausages with the requirements. Any sausage having pin holes, air pockets, deformation or breakage in its casings is counted as defective and total number of such defective sausages alone is noted in each shift. The following data represents the number of defective sausages in samples of 200 sausages taken from 10 shifts. Sample Defectives Percent Defective 1 40 20% 2 28 14% 3 15 8% 4 23 (a) 5 20 10% 6 21 11% 7 19 10% 8 15 8% 9 16 8% 10 17 9% Calculate the value for (a) in the table above. Calculate p-bar based on the samples above. What is the UCL and LCL for a p chart based on the data provided and a desired control level of 99.74%? Use your control limits from part b along with the data provided to draw a p-chart. Is the process in control? Why or why not? If not in control, suggest some potential reasons.arrow_forwardmq3arrow_forward
- Explain the use of full and fractional factorial experimental designs. Provide a scenario of when it would be appropriate for each.arrow_forwardUsing Dodge-Romig plans for AOQL of 3% ,determine the AOQ if the process average defective is 0.50% and the lot size is 600 and the pr0portion of defective is 4%arrow_forwardplease explain the terms variety, variability, volume and visibility in terms of the the 4 Vs?arrow_forward
- please help answer part a and b for question 1. Please answer question 2 as well.arrow_forwardCalculate and report the tracking signal for the models with alpha values of 0.25 and 0.75, with h 100. Provide codes in Rarrow_forwardThank you so much for the answer can you please make use of a BPMN Model diagram for us to understand the explained answer furtherarrow_forward
- A machine cuts circular filters from large rolls of material. The diameters of the filters are normally distributed with a mean of 2.00 cm and a standard deviation of 0.02 cm. Specifications call for the filters to have diameters between 1.95 cm and 2.03 cm. What percent of production does not meet specificationsarrow_forwardEttlie Engineering has a new catalyst injection system for your countertop production line. Your process engineering departmenthas conducted experiments and determined that the mean is 8.01 grams with a standard deviation of .03. Your specificationsare: m = 8.0 and s = .04, which means an upper specification limit of 8.12 [ = 8.0 + 3(.04)] and a lower specification limit of7.88 [= 8.0 - 3(.04)].What is the Cpk performance of the injection system?arrow_forward1.Use a Venn-diagram to perform a qualitative risk assessment, indicating the likelihood%, category, frequency, severity, and RHC score for climate, pest infestations, soil erosion, market volatility and supply chain management risk of corn. 2.Plot the risks from the Venn diagram on a Risk Heat Map/Chartarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.