Operations Management
2nd Edition
ISBN: 9781260484687
Author: CACHON, Gerard
Publisher: MCGRAW-HILL HIGHER EDUCATION
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 17, Problem 8CQ
Summary Introduction
To determine: The statement which express the motivation behind the expressing “buffer or suffer”?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Process time is part of cycle time. The process time of a business process refers to:
a. alWways is the largest part of cycle time.
b. timMe a customer spends waiting in a queue (e.g., time customer spends waiting in a drive-thru line)
c. is ofFten considered to be value-added time to the customer.
d. timMe from beginning to completion of the business process.
Mrs. Freddy Mitchell, in her lecture, stated that a transaction processing system (TPS) is software that ensures the completion of business transactions and keeps track of those business transactions. An online transaction processing system (OTPS) is an equivalent system that online merchants use for e-commerce. The TPS ensures that each transaction is successful by storing, sending, and receiving information via a database. She added that because the process is lengthy, it is broken down into cycles, which are broken further into systems and subsystems.
Zara- Lee, a participant in Mrs. Freddy Mitchell’s Lecture series, got confused as Mrs. Freddy Mitchell began to elaborate on the many different systems, and Zara- Lee mentioned to YOU that she is experiencing information overload.
YOU then responded that Mrs. Freddy Mitchell’s explanation was clear and concise, and YOU would explain the revenue cycle, its components, and the sub-systems that constitute that cycle after class.…
Which of the following best reflects pooling capacity to reduce restroom queue lengths?a. Add more toilets to increase capacity.b. Install a flexible partition that can alter the size of the women’s and the men’srestrooms.c. Convert the separate men’s and women’s rooms into a single unisex restroom (thatboth men and women can use).d. Remove mirrors in the restroom to decrease the time users spend in the restroom.e. Add automatic flush capability to each toilet to decrease processing times.
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- An engineering i rm retains a technical specialist to assist four design engineers workingon a project. The help that the specialist gives engineers ranges widely in time consumption.The specialist has some answers available in memory, others require computation,and still others require signii cant search time. On the average, each request for assistancetakes the specialist one hour.The engineers require help from the specialist on the average of once each day. Becauseeach assistance takes about an hour, each engineer can work for seven hours, on the average,without assistance. One further point: Engineers needing help do not interrupt if thespecialist is already involved with another problem.Treat this as a i nite queuing problem and answer the following questions:a. How many engineers, on average, are waiting for the technical specialist for help?b. What is the average time that an engineer has to wait for the specialist?c. What is the probability that an engineer will have to wait…arrow_forwardA lab provides ultrasound service to patients. The service process consists of two steps: 1. Registration. Performed by a receptionist (Salary rate = $25/hr; Process time = 6 minutes/patient) 2. Ultrasound scan. Performed by a technician (Salary rate = $30/hr; Process time = 20 minutes/patient) Note that the ultrasound images need to be read by radiologists, but we assume that they have an ample capacity and thus will not model the role in the service process. Currently, the lab has 2 receptionists and 3 technicians. The manager anticipates demand to grow to 14 patients/hr in the near future. Thus, he plans to hire more receptionists and/or technicians to increase the service capacity to at least 14 patients/hr. What would be the extra payroll cost (in dollars per hr)?arrow_forwardIf the arrival rate doubles and the number of servers doubles, what is the changein the system’s utilization, assuming there are no other changes (e.g., the processing timeand the coefficients of variation remain the same)?A. Utilization increases.B. Utilization remains the same.C. Utilization decreases.D. It is not possible to determine how those changes will influence utilization.arrow_forward
- The columns in an Access table are also called O Rows O Records O Fields O Columnsarrow_forwardWhich of the following is a qualitative factor in a simulation of a grocery store checkout process? A. the interarrival time of customers to the queue B.the number of full-service checkout lanes that are open C. the number of express lanes that are open D. the presence of self-checkout lanesarrow_forwardIn a furniture manufacturing facility, there is a drilling shop with semi-automated machines. For an operator, it takes 20 seconds for a worker to move from one machine to the other. To load a drilling job to the machines a worker spends 3 minutes. Once loaded machines finish the drilling job in 4 minutes. The worker spends 40 seconds to conduct a quality check for the finished parts. If two machines are allocated to a worker which of the following will be true? Machines will have idle time Neither machines nor the worker will have idle time The worker and the machines both will have idle time Worker will have idle timearrow_forward
- . A computer server experiences large fluctuations in the amount of data requests itreceives throughout the day. Because of this variation, Little’s Law does not apply. Trueor false?arrow_forwardA company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used five workers, who produced an average of 80 carts per hour. Workers receive $10 per hour, and machine cost was $40 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $10 per hour while output increased by four carts per hour. Compute labor productivity under each system. Use carts per worker per hour as the measure of labor productivity. Compute the multifactor productivity under each system. Use carts per dollar cost (labor plus equipment) as the measure.arrow_forwardIn an M/MA queueing system, the arrival rate is 3 customers per hour and the service rate is 5 customers per hour. If the service process is automated (resulting in no variation in service times but the same service rate), what will be the resulting performance measurements? (Round your answers to 3 decimal places.) a. What is the utilization? Utilization b. What is the expected number of customers in the system (L)? Number of customers c. What is the expected waiting time (in hours) for the system (W)? Waiting time(in hours)arrow_forward
- A company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used five workers, who produced an average of 80 carts per hour. Workers receive $10 per hour, and machine cost was $40 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $10 per hour, while output increased by four carts per hour.A) Compute labor productivity under each system. Use carts per worker per hour as themeasure of labor productivity.B) Compute the multifactor productivity under each system. Use carts per dollar cost (laborplus equipment) as the measure.C) Comment on the changes in productivity according to the two measures, and on which one you believe is the more pertinent for this situation.arrow_forwarda)Resolution of issue pertaining to storage of steel plates. b)What objectives are to be planned to address the delays in up-gradation of facilities? c)Suggest a strategy to accomplish the objectives planned (in part b). d)How to manage orders those are queued for which it is confirmed that they will be delayed and penalty is inevitable?arrow_forwardBefore completing production, a product must passthrough three stages of production. On the average, a newproduct begins at stage 1 every 6 minutes. The average timeit takes to process the product at each stage is as follows:stage 1, 3 minutes; stage 2, 2 minutes; stage 3, 1 minute.After finishing at stage 3, the product is inspected (assumethis takes no time). Ten percent of the final products arefound to have a defective part and must return to stage 1 andgo through the entire system again. After completing stage3, 20% of the final products are found to be defective. Theymust return to stage 2 and pass through 2 and 3 again. Onthe average, how many jobs are in the system? Assume thatall interarrival times and service times are exponential andthat each stage consists of a single server.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,