Chapter 21, Problem 12P
To determine
The current PCR for the pavement section and the new IRI that will trigger the rehabilitation.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
An agency uses the following formula to determine pavement condition rating,
PCR = 99.3 5.51 (5.0-ROUGH) 1.59 LNALL 0.221 AVGOUT 0.0306 LONG
where we have the following.
ROUGH = roughness measured by present serviceability rating (PSR), scale of 0 to 5
LNALL = natural logarithm of alligator cracking, ft per mile
AVGOUT = outer wheel path rutting (all locations averaged), 0.01 inch
LONG = longitudinal cracking, ft per mile
TRAN = transverse cracking, number of cracks per mile
And, present serviceability rating is determined as the following.
PSR = 5e-0.0051118 IRI-0.0016027
A pavement section has the following distress data.
IRI = 106 in./mi
Alligator cracking
110 ft/mi
Average rutting =
0.20 in.
Longitudinal cracks = 130 ft/mi
Transverse cracks = 12/mi
Determine the current PCR for this section.
PCR =
0.531 TRAN,
Now, assume a new roughness measurement is expected soon. When PCR falls below 60, the section will be scheduled for rehabilitation. Determine the new IRI value (in in./mi)…
As a materials engineer working for a
highway department, what standard PG
asphalt binder grade would you specify for
each of the conditions show in the table.
Seven-Day
Мaximum
Minimum Pavement
Recommended PG Grade
Pavement
Temperature, °C
Temperature, "C
Case
50%
98%
Mean, °C
Std. Dev., "C
Mean, "C
Std. Dev., °C
Reliability
Reliability
39
1
-32
3.5
54
1.5
-17
2
69
2.5
1.
What standard PG asphalt binder grade should be selected under the following conditions:a. The seven-day maximum pavement temperature has a mean of 62°C and a minimum pavement temperature of -15°C. (table9.2)
b. According to part a, what is your recommendation for 20 million ESALs and 50 km/h speed? (table ESALs)
c. For 50 million ESALs and 80 km/h speed. (table ESALs)
Chapter 21 Solutions
MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Define precisely the difference between pavement serviceability and performance. Using a sketch to indicate the concept of remaining service life of a pavement segment.arrow_forwardQ, Discuss the following terms briefly: a, Emulsion breaking and Cutback curing, b, Water bound and aggregate base, c, Flexible pavement and Rigid pavements,arrow_forwardDiscuss various tests used for the quality of aggregate used in flexible pavements.arrow_forward
- Repeat Problem 19-7 using two different depths of untreated aggregate bases of 6 in. and 12 in. Highway contractors in your area can furnish rates for providing and properly laying an asphalt concrete surface and untreated granular base. Assume a structural coefficient of 0.12 for the base course. If these rates are available, determine the cost for constructing the different pavement designs if the highway section is 5 miles long and the lane width is 12 ft. Which design will you select for construction?arrow_forwardQ#3. Discuss root causes and remedial measures of the following distresses occurring in flexible pavements: Slippage failure, Potholes, Rutting and its types, Bitumen bleeding Answer in word formatarrow_forwardProblem 32: What is the stiffness factor of a pavement if the modulus of elasticity is 180 MPa and whose subgrade modulus is 40 MPa?arrow_forward
- A rigid pavement is being designed with the same parameters as used in Problem 4.5. The modulus of subgrade reaction is 300 lb/in? and the slab thickness is determined to be 8.5 inches. The load transfer coefficient is 3.0, the drainage coefficient is 1.0, and the modulus of elasticity is 4 million 1b/in?. What is the design modulus of rupture? (Assume that any parameters not given in this problem are the same as those given in Problem 4.5.) 4.5 for reference: A flexible pavement was designed for the following daily traffic with a 12-year design life: 1300 single axles at 8000 Ib each, 900 tandem axles at 15,000 1b each, 20 single axles at 40,000 Ib each, and200 tandem axles at 40,000 lb each. The highway was designed with 4 inches of HMA wearing surface,arrow_forwardFor the following temperature conditions, calculate the proper PG grade for both 50% and 98% reliabilities (show your calculation).Seven-day maximum pavement temperature of 48°C with a standarddeviation of 2.5°C. Minimum pavement temperature of -21°C with a standard deviation of 3°C.arrow_forwardQ9. The preventive rehabilitation technique is that which involves: a) surface applications of either structural or nonstructural improvements intended to keep the quality of the pavement above a predetermined level b) all means that enables the designer to consider each maintenance alternative in terms of a final product and then select the most appropriate one in terms of results desired and cost. c) the permanent or temporary repair of deficiencies on an as-needed basis d) a and b e) b and c Q10. When compacting a soil at wet to optimum, then; a) the soil fabric is oriented and it has lower permeability b) the soil fabric is dispersed and it has lower permeability c) the soil fabric is dispersed and it has a higher strength d) the soil fabric is dispersed and it has a lower strengtharrow_forward
- Define the importance of air void content in bituminous pavements?arrow_forwardDescribe these five (5) types of pavement deformations (A-E) and then discuss the causes and propose the proper solutions of each type.arrow_forwardBriefly explain the process of constructing a pavement using roller-compacted concrete (RCC). What are the advantages and disadvantages of this method of construction?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning