MyLab Accounting with Pearson eText -- Access Card -- for Horngren's Accounting
11th Edition
ISBN: 9780133877571
Author: Tracie L. Miller-Nobles, Brenda L. Mattison, Ella Mae Matsumura
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 23, Problem 4QC
MajorNet Systems is a start-up company that makes connectors for high-speed Internet connections The company has budgeted variable costs of $145 for each connector and fixed costs of $7,500 per month. MajorNefs static budget predicted production and sales of 100 connectors in August, but the company actually produced and sold only 84 connectors at a total cost of $21,000.
4. MajorNet Systems’s managers could set direct labor standards based on
Learning Objective 2
- time-and-motion studies.
- continuous improvement.
- benchmarking.
- All of the above.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Sharon Glessing, controller for Janson Company, has noticed that the company faces a 80 percent learning rate for its specialty design line. In planning the cost of the latest design, Sharon assumed that the first set of units would take 1,100 direct labor hours. She decided to use this information in budgeting for the cost of the total project, which would involve the manufacture of 16 sets. Direct labor is paid $40 per hour.
1. Complete the table below showing results by row for total production of: one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) (Round Cumulative Total Time answers to the nearest whole number.)
2. What is the total labor cost if Janson Company makes eight sets? Sixteen sets? (Use the rounded answers in the subsequent computations).
3. Using the logarithmic function, complete the table below showing results by row for each of unit sets one through eight. (Round hour answers to two significant digits.)…
NUBD Company is planning to introduce a new product with an 80 percent learning rate for production for batches of 1,000 units. The variable labor costs are P30 per unit for the first 1,000-unit batch. Each batch requires 100 hours. There are P10,000 in fixed costs not subject to learning. What is the cumulative total time (labor hours) to produce 16,000 units based on the cumulative average-time learning curve?
A. 655.36 hours
B. 256 hours
C. 160 hours
D. 409.6 hours
LearnCo manufactures and sells one product, an abacus for classroom use, with two models, the Basic model and the Deluxe model. The company began operations on January 1, 20Y1, and is planning for 20Y2, its second year of operations, by preparing budgets from its master budget.
The company is trying to decide how many units to manufacture, how much it might spend on direct materials and direct labor, and what their factory overhead expenses might be. In addition, the company is interested in budgeting for selling and administrative costs, and in creating a budgeted income statement showing a prediction of net income for 20Y2.
You have been asked to assist the controller of LearnCo in preparing the 20Y2 budgets.
The sales budget often uses the prior year’s sales as a starting point, and then sales quantities are revised for various factors such as planned advertising and promotion, projected pricing changes, and expected industry and general economic conditions. LearnCo has…
Chapter 23 Solutions
MyLab Accounting with Pearson eText -- Access Card -- for Horngren's Accounting
Ch. 23 - Prob. 1QCCh. 23 - MajorNet Systems is a start-up company that makes...Ch. 23 - MajorNet Systems is a start-up company that makes...Ch. 23 - MajorNet Systems is a start-up company that makes...Ch. 23 - MajorNet Systems has budgeted three hours of...Ch. 23 - MajorNet Systems has budgeted three hours of...Ch. 23 - FrontGrade Systems allocates manufacturing...Ch. 23 - FrontGrade Systems allocates manufacturing...Ch. 23 - FrontGrade Systems allocates manufacturing...Ch. 23 - The person probably most responsible for the...
Ch. 23 - HajorNet System’s static budget predicted...Ch. 23 - What is a variance?Ch. 23 - Explain the difference between a favorable and an...Ch. 23 - What is a static budget performance report?Ch. 23 - How do flexible budgets differ from static...Ch. 23 - How is a flexible budget used?Ch. 23 - What are the two components of the static budget...Ch. 23 - What is a flexible budget performance report?Ch. 23 - What is a standard cost system?Ch. 23 - Explain the difference between a cost standard and...Ch. 23 - Give the general formulas for determining cost and...Ch. 23 - How does the static budget affect cost and...Ch. 23 - List the direct materials variances, and briefly...Ch. 23 - List the direct labor variances, and briefly...Ch. 23 - List the variable overhead variances, and briefly...Ch. 23 - List the fixed overhead variances, and briefly...Ch. 23 - How is the fixed overhead volume variance...Ch. 23 - What is management by exception?Ch. 23 - List the eight product variances and the manager...Ch. 23 - Briefly describe how journal entries differ in a...Ch. 23 - What is a standard cost income statement?Ch. 23 - Matching terms Learning Objective 1 Match each...Ch. 23 - Prob. S23.2SECh. 23 - Prob. S23.3SECh. 23 - Matching terms Learning Objective 2 Match each...Ch. 23 - Identifying the benefits of standard costs...Ch. 23 - Prob. S23.6SECh. 23 - Prob. S23.7SECh. 23 - Interpreting material and labor variances Learning...Ch. 23 - Prob. S23.9SECh. 23 - Prob. S23.10SECh. 23 - Prob. S23.11SECh. 23 - Prob. S23.12SECh. 23 - Prob. S23.13SECh. 23 - Prob. S23.14SECh. 23 - Prob. E23.15ECh. 23 - Prob. E23.16ECh. 23 - Prob. E23.17ECh. 23 - Prob. E23.18ECh. 23 - Prob. E23.19ECh. 23 - Prob. E23.20ECh. 23 - Prob. E23.21ECh. 23 - Prob. E23.22ECh. 23 - Preparing journal entries Hayesvillc Company uses...Ch. 23 - Prob. E23.24ECh. 23 - Prob. P23.25APGACh. 23 - Preparing a flexible budget computing standard...Ch. 23 - Prob. P23.27APGACh. 23 - P23-28A Computing and journalizing standard cost...Ch. 23 - Prob. P23.29APGACh. 23 - Prob. P23.30BPGBCh. 23 - Preparing a flexible budget computing standard...Ch. 23 - P23-32B Computing standard cost variances and...Ch. 23 - P23-33B Computing and journalizing standard cost...Ch. 23 - Preparing a standard cost income statement...Ch. 23 - Prob. P23.35CPCh. 23 - Decision Case 23-1 Suppose you manage the local...Ch. 23 - Fraud Case 23-1 Drew Castello, general manager of...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Bordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On average, the first unit of a new design takes 600 hours. Direct labor is paid 25 per hour. Required: 1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total production of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, cumulative total time in hours, and the time for the last unit. Show results by row for each of units one through eight. (Round answers to two significant digits.)arrow_forwardNUBD Company is planning to introduce a new product with an 80 percent learning rate for production for batches of 1,000 units. The variable labor costs are P30 per unit for the first 1,000-unit batch. Each batch requires 100 hours. There are P10,000 in fixed costs not subject to learning. What is the cumulative total time (labor hours) to produce 16,000 units based on the cumulative average-time learning curve? 655.36 hours 256 hours 160 hours 409.6 hoursarrow_forwardDwyran Ltd also produce, the Menai, which has been in production for a number of years, and to date 497 units of the Menai have been produced. The budget for the next quarter is showing the production of 65 units of the Menai. If the 1st ever unit took 200 hours and an 80% learning curve applies: Calculate the total labours hours needed for the production of 65 units of the Menai Calculate the average labour time per unit Note: the learning co-efficient of 80% is -0.322arrow_forward
- Average labor cost for the first 700 units of a product is RO 50 and the average labor cost of first 1400 units is RO 45. Average time per unit is 100 minutes. The learning ratio and the average labour cost for first 2800 units will be: a. 80% and RO 36.000 b. 90% and RO 40.500 c. 85% and RO 38.250 d. 95% and RO 42.750arrow_forwardLearnCo LearnCo manufactures and sells one product, an abacus for classroom use, with two models, the Basic model and the Deluxe model. The company began operations on January 1, 20Y1, and is planning for 20Y2, its second year of operations, by preparing budgets from its master budget. The company is trying to decide how many units to manufacture, how much it might spend on direct materials and direct labor, and what their factory overhead expenses might be. In addition, the company is interested in budgeting for selling and administrative costs, and in creating a budgeted income statement showing a prediction of net income for 20Y2. You have been asked to assist the controller of LearnCo in preparing the 20Y2 budgets. Sales Budget The sales budget often uses the prior year’s sales as a starting point, and then sales quantities are revised for various factors such as planned advertising and promotion, projected pricing changes, and expected industry and general economic conditions.…arrow_forwardHarriman Industries manufactures engines for the aerospace industry. It has completed manufacturing the first unit of the new ZX-9 engine design. Management believes that the 1,000 labor hours required to complete this unit are reasonable and is prepared to go forward with the manufacture of additional units. An 80 percent cumulative average-time learning curve model for direct labor hours is assumed to be valid. Data on costs are as follows: Required: 1. Set up a table with columns for cumulative number of units, cumulative average time per unit in hours, and the cumulative total time in hours. Complete the table for 1, 2, 4, 8, 16, and 32 units. (Round hours to one significant digit.) 2. What are the total variable costs of producing 1, 2, 4, 8, 16, and 32 units? What is the variable cost per unit for 1, 2, 4, 8, 16, and 32 units?arrow_forward
- Your company has received an order for 20 units of aproduct. Th e labor cost to produce the item is $9.50 per hour. Th esetup cost for the item is $60 and material costs are $25 per unit. Th e item is sold for $92. Th e learning rate is 80 percent. Overheadis assessed at a rate of 55 percent of unit labor cost.(a) Determine the average unit cost for the 20 units if the fi rstunit takes four hours.(b) Determine the minimum number of units that need to bemade before the selling price meets or exceeds the averageunit cost.arrow_forwardFNG Paint (Pty) Ltd produces finger paint and sells them to pre‐schools. The following information relates to a set of finger paint. A set of finger paint is considered to be one unit. Direct labour needed for the first set of paint 4 hoursDirect labour costs per unit R30 per hourDirect material costs per unit R25Total Fixed costs R2 000Learning curve 80% Using the learning curve theory and information provided above, calculate the expected average cost for one set of paint should four and sixteen sets be produced, respectively. Round off to two decimal places.arrow_forwardRoberds Tech is a for-profit vocational school. The school bases its budgets on two measures of activity (i.e., cost drivers), namely student and course. The school uses the following data in its budgeting: Fixed element per month Variable element per student Variable element per course Revenue $ 0 $ 298 $ 0 Faculty wages $ 0 $ 0 $ 3,100 Course supplies $ 0 $ 52 $ 40 Administrative expenses $ 26,500 $ 27 $ 52 In March, the school budgeted for 1,910 students and 88 courses. The school's income statement showing the actual results for the month appears below: Roberds Tech Income Statement For the Month Ended March 31 Actual students 1,810 Actual courses 91 Revenue $ 411,340 Expenses: Faculty wages 214,950 Course supplies 62,590 Administrative expenses 84,562 Total expense 362,102 Net operating income $ 49,238 Required: Prepare a flexible budget performance report showing both the school's activity variances and revenue and spending…arrow_forward
- ShawnTech is a for-profit vocational school. The school bases its budgets on two measures of activity (i.e., cost drivers), namely student and course. The school uses the following data in its budgeting: Fixed element per month variable element per student variable element per course revenue $0 $354 $0 faculty wages $0 $0 $2,300 course supplies $0 $48 $40 administrative expenses $41,700 $13 $21 In October, the school budgeted for 1,400 students and 127 courses. The actual activity for the month was 1,500 students and 129 courses. Prepare a report showing the school's activity variances for October. Label each variance as favorable (F) or unfavorable (U).arrow_forwardA professional division at a business school provides several development programs that have been tailored to the specific training needs of both the public and private sectors. The program director is planning to offer a one-full-day course in risk management to be sold at $2,250 plus orientation fee (5%) per participant. The division incurs a cost of $45,000 for promotion, classroom space, staff and instructor’s salary, as well as a cost of $240 per participant for refreshments, lunch, course material, a gift package, and a framed certificate of completion. How many participants need to register in the course for it to be worthwhile to offer it? Round to two decimal places. Group of answer choices 21.20 26.86 36.72arrow_forwardMajorNet Systems is a start-up company that makes connectors for high-speed Internet connections. The company has budgeted variable costs of $145 for each connector and fixed costs of $7,500 per month. MajorNet’s static budget predicted production and sales of 100 connectors in August, but the company actually produced and sold only 84 connectors at a total cost of $21,000. MajorNet Systems’s managers could set direct labor standards based on a. time-and-motion studies. b. continuous improvement. c. benchmarking. d. All of the above.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
What is Cost Allocation? Definition & Process; Author: FloQast;https://www.youtube.com/watch?v=hLhvvHvZ3JM;License: Standard Youtube License