ACCESS IN BB-ACC202
null Edition
ISBN: 9780135375587
Author: Pearson
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 3, Problem 3.22AE
1.
To determine
To calculate: Calculate the total cost
2.
To determine
To calculate: Calculate the percentage of recycled content used and also specify if the job meet the requirement of 40% recycled content.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Calculate a job cost using ABC (Learning Objective 2)Oliver Industries, a small, family-run manufacturer, has adopted an ABC system . The fol- lowing manufacturing activities, indirect manufacturing costs, and usage of cost drivers have been estimated for the year :54-7Direct materials ................................................................................ ? Direct labor ...................................................................................... ? Manufacturing overhead ...... .......... .......... ............. ................. .......... ? Total job cost .................................................................................... $?Classifying costs within the cost hierarchy (Learning Objective 2) Classify each of the following costs as either unit-level, batch-level, product-level, orfacility-level.a. Engineering costs for new productb. Order processingc. Depreciation on factoryd. Direct labore. Shipment of an order to a customerf. Product line manager…
Click to watch the Tell Me More Learning Objective 1 video and then answer the questions below.
1. Which of the following manufacturers is most likely to use a process cost system?
Purse manufacturer
Sports drink manufacturer
Automobile manufacturer
Guitar manufacturer
2. Process and job order cost systems are similar in that both systems _______.
record and summarize product costs
classify product costs as direct materials, direct labor, and factory overhead
allocate factory overhead costs to products
All of these choices are correct.
Click to watch the Tell Me More Learning Objective 4 video and then answer the questions below.
1. Which of the following represents the computation of direct materials cost per equivalent unit?
Total direct cost for the period divided by total equivalent units of direct materials.
Total equivalent units of direct materials divided by total direct cost for the period.
Total direct cost for the period divided by total units of direct materials.
Total units of direct materials divided by total direct cost for the period.
2. What is the conversion cost per equivalent unit, when the total conversion cost for the period is $1,225 and the total units of packaged drinking water produced during the same period is 5,000 gallons (70 percent complete).
$0.17 per gallon
$0.35 per gallon
$2.86 per gallon
None of these choices are correct.
Chapter 3 Solutions
ACCESS IN BB-ACC202
Ch. 3 - (Learning Objective 1) For which of the following...Ch. 3 - (Learning Objective 2) Which of the following...Ch. 3 - (Learning Objective 2) Which of the following...Ch. 3 - (Learning Objective 3) The amount of manufacturing...Ch. 3 - (Learning Objective 4) Which of the following is...Ch. 3 - (Learning Objective 5) Which of the following is...Ch. 3 - (Learning Objective 5) Assuming the amount of...Ch. 3 - Prob. 8QCCh. 3 - Prob. 9QCCh. 3 - Prob. 10QC
Ch. 3 - Identify product costs, period costs, and product...Ch. 3 - Decide on product costing system (Learning...Ch. 3 - Determine the flow of costs between inventory...Ch. 3 - Understanding key document terms in a job cost...Ch. 3 - Compute a professional billing rate (Learning...Ch. 3 - Prob. 3.6SECh. 3 - Continuation of S3-6: compute total allocated...Ch. 3 - Continuation of S3-7: determine over- or under...Ch. 3 - Prob. 3.9SECh. 3 - Calculate job cost and billing at appliance repair...Ch. 3 - Calculating overallocated or underallocated...Ch. 3 - Prob. 3.12SECh. 3 - Record manufacturing labor costs (Learning...Ch. 3 - Prob. 3.14SECh. 3 - Prob. 3.15SECh. 3 - Understanding key terms (Learning Objectives 1, 2,...Ch. 3 - Identify type of costing system (Learning...Ch. 3 - Prob. 3.18AECh. 3 - Determine the cost of a job and use it for pricing...Ch. 3 - Compute a predetermined overhead rate and...Ch. 3 - Prob. 3.21AECh. 3 - Prob. 3.22AECh. 3 - Determine the cost of a job (Learning Objectives...Ch. 3 - Compare bid prices under two different allocation...Ch. 3 - Analyze manufacturing overhead (Learning...Ch. 3 - Record manufacturing overhead (Learning Objectives...Ch. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Analyze T-accounts (Learning Objectives 2, 3, 5, ...Ch. 3 - Job cost and bid price at a consulting firm...Ch. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Identify type of costing system (Learning...Ch. 3 - Understand the flow of costs in a job cost shop...Ch. 3 - Prob. 3.33BECh. 3 - Prob. 3.34BECh. 3 - Prob. 3.35BECh. 3 - Sustainability and job costing (Learning...Ch. 3 - Determine the cost of a job (Learning Objectives...Ch. 3 - Compare bid prices under two different allocation...Ch. 3 - Analyze manufacturing overhead (Learning...Ch. 3 - Record manufacturing overhead (Learning Objectives...Ch. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Analyze T-accounts (Learning Objectives 2, 3, 5, ...Ch. 3 - Prob. 3.43BECh. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Analyze Manufacturing Overhead (Learning...Ch. 3 - Use job costing at an advertising agency (Learning...Ch. 3 - Use job costing at a consulting firm (Learning...Ch. 3 - Prepare job cost record (Learning Objectives 2, 3,...Ch. 3 - Determine and record job costs (Learning...Ch. 3 - Determine flow of costs through accounts (Learning...Ch. 3 - Analyze Manufacturing Overhead (Learning...Ch. 3 - Use job costing at an advertising agency (Learning...Ch. 3 - Use job costing at a consulting firm (Learning...Ch. 3 - Prepare job cost record (Learning Objectives 2, 3,...Ch. 3 - Determine and record job costs (Learning...Ch. 3 - Determine flow of costs through accounts (Learning...Ch. 3 - Job costing or process costing for wedding...Ch. 3 - Discussion Questions 1. Why would it be...Ch. 3 - Unwrapped or How Its Made Go to www.YouTube.com...Ch. 3 - Ethics involved with choice of cost driver...Ch. 3 - Prob. 3.61ACTCh. 3 - Issues with cost of job (Learning Objectives 2, 3,...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- P10-53B Determine transfer price at a manufacturer under various scenarios (Learning Objective 4) Assume the Small Components Division of Lang Manufacturing produces a video card used in the assembly of a variety of electronic products. The division's manufacturing costs, and variable selling expenses related to the video card are as follows: Cost per unit Direct materials $ 14.00 Direct labor $ 4.00 Variable manufacturing overhead $ 8.00 Fixed manufacturing overhead (at current production level) $ 9.00 Variable selling expenses $ 10.00 The Computer Division of Lang Manufacturing can use the video card produced by the Small Components Division and is interested in purchasing the video card in-house rather than buying it from an outside supplier. The Small Components Division has sufficient excess capacity with which to make the extra video cards. Because of competition, the market price for this video card is $30 regardless of whether the…arrow_forwardClick to watch the Tell Me More Learning Objective 2 video and then answer the questions below. 1. The first step in preparing a cost of production report is to _____. compute equivalent units of production determine the units to be assigned costs determine the cost per equivalent unit allocate costs to units transferred out and partially completed units 2. The last step in preparing a cost of production report is to _____. compute equivalent units of production determine the units to be assigned costs determine the cost per equivalent unit allocate costs to units transferred out and partially completed unitsarrow_forwardI have the following information: direct materials $250 and total manufacturing cost $700. Overhead applied to jobs at a rate of 200% of direct labor cost. This is for Chapter 2 job costing in managerial accounting. I am supposed to figure out conversion cost, direct labor cost, and manufacturing overhead. I know the formula for conversion cost= direct labor + manufacturing OH Prime cost= direct labor + direct materials How do I figure out direct labor cost with the given information? The learning objective states calcualte predetermined overhead rate, but I do not have estimated manufacturing cost and estimated labor. Can you please help? Thanks, Erica Gordonarrow_forward
- MANAGEMENT ACCOUNTING & CONTROL STANDARD COSTS AND VARIANCE ANALYSIS LEARNING ACTIVITY 1 Torres Company has established standard costs for the cabinet department, in which one size of MX cabinet is made. The standard costs of producing one of these MX cabinets are shown below: Standard Cost Card – MX Cabinet Direct Material: Lumber 50 board ft at P 4 200 Direct Labor: 8 hours at P 10 80 Overhead Costs: Variable – 8 hrs at P5 40 Fixed – 8 hrs at P3 24 Total Standard Unit Cost 344 During June 2018, 500 of these cabinets were produced. The cost of operations during the month are shown below. There is no work in process at the beginning and end of the month. Direct material purchased: 30,000 bf at P4.10 123,000 Direct materials used: 24,000 board ft Direct labor: 4,200 hrs at P9.50 39,900 Overhead Costs : Variable Costs 22,000 Fixed Costs 11,000…arrow_forwardTriad Children's Center(TCC), a non-profit organization, uses relevant cost analysis to determine whether new services are desirable. TCC is looking at adding a new education program for grade school children who are having difficulty with the reading and math skills. The following relevant cost are expected if the program is accepted:arrow_forwardUse ABC to allocate manufacturing overhead (Learning Objective 2)Several years after reengineering its production process, King Corporation hired a new controller, Christine Erickson . She developed an ABC system very similar to the one used by King's chief rival. Part of the reason Erickson developed the ABC system was because King's profits had been declining, even though the company had shifted its product mix toward the product that had appeared most profitable under the old system . Before adopting the new ABC system, the company had used a plantwide overhead rate, based on direct labor hours developed years ago .For the upcoming year, King's budgeted ABC manufacturing overhead allocation rates are as follows :ActivityMaterials handling .......................... Machine setup ................................ Insertion of parts ............................ Finishing .........................................Allocation BaseNumber of partsNumber of setupsNumber of partsFinishing…arrow_forward
- Cost Identification Following is a list of cost terms described in the chapter as well as a list of brief descriptive settings for each item. Cost terms: a. Opportunity cost b. Period cost c. Product cost d. Direct labor cost e. Selling cost f. Conversion cost g. Prime cost h. Direct materials cost i. Manufacturing overhead cost j. Administrative cost Settings: 1. Marcus Armstrong, manager of Timmins Optical, estimated that the cost of plastic, wages of the technician producing the lenses, and overhead totaled 30 per pair of single-vision lenses. 2. Linda was having a hard time deciding whether to return to school. She was concerned about the salary she would have to give up for the next 4 years. 3. Randy Harris is the finished goods warehouse manager for a medium-sized manufacturing firm. He is paid a salary of 90,000 per year. As he studied the financial statements prepared by the local certified public accounting firm, he wondered how his salary was treated. 4. Jamie Young is in charge of the legal department at company headquarters. Her salary is 95,000 per year. She reports to the chief executive officer. 5. All factory costs that are not classified as direct materials or direct labor. 6. The new product required machining, assembly, and painting. The design engineer asked the accounting department to estimate the labor cost of each of the three operations. The engineer supplied the estimated labor hours for each operation. 7. After obtaining the estimate of direct labor cost, the design engineer estimated the cost of the materials that would be used for the new product. 8. The design engineer totaled the costs of materials and direct labor for the new product. 9. The design engineer also estimated the cost of converting the raw materials into their final form. 10. The auditor for a soft drink bottling plant pointed out that the depreciation on the delivery trucks had been incorrectly assigned to product cost (through overhead). Accordingly, the depreciation charge was reallocated on the income statement. Required: Match the cost terms with the settings. More than one cost classification may be associated with each setting; however, select the setting that seems to fit the item best. When you are done, each cost term will be used just once.arrow_forwardProfit Planning and Control This case is a manufacturer and could make specialty bikes, ski or outdoor equipment, computers, food like chocolates, saltwater taffy, cookies, or donuts, etc. Create the balance sheet, income statement, and statement of the cash flow from the following information. Use the following information for the learning experiences Sales volume units = 11,000 Sales price/unit = $100 Variable manufacturing costs/unit = $60 Fixed manufacturing costs = $210,000 Fixed sales & administration costs = $190,000 Business income tax rate = 25% Current assets = $250,000 (Cash $50,000, Accounts Receivables $100,000, Inventory $100,000) Fixed assets = $750,000 Current liabilities = $200,000 (Accounts Payable $100,000, Short Term Debt $100,000) Long Term Debt = $300,000 Owners' Equity = $500,000arrow_forwardE4-23A Use ABC to allocate manufacturing overhead (Learning Objective 2) Several years after reengineering its production process, Biltmore Corporation hired a new controller, Rachael Johnson. She developed an ABC system very similar to the one used by Biltmore’s chief rival, Westriver. Part of the reason Johnson developed the ABC system was because Biltmore’s profits had been declining even though the company had shifted its product mix toward the product that had appeared most profitable under the old system. Before adopting the new ABC system, Biltmore had used a plantwide overhead rate based on direct labor hours that was developed years ago. For the upcoming year, Biltmore’s budgeted ABC manufacturing overhead allocation rates are as follows: Activity Allocation Base Activity Cost Allocation Rate Materials handling # of parts $3.84 per part Machine setup # of setups $330.00 per setup Insertion of parts # of parts $30.00 per part Finishing Finishing DL hrs $54.00 per hour The…arrow_forward
- please assist and show all workings Personal Protective Gears & More (PPGM) design and manufacture masks for students. Afterproduction, the masks are placed into individual cases, before being transferred into Finished Goods. Theaccounting records of the business reflect the following data at June 30, 2021, for the manufacturing ofmasks for Mount Marlie High School. Inventory 1/7/2020 30/6/2021Raw Materials $230,000 $260,000Factory Supplies $35,000 $24,000Work in Progress $348,300 $203,300Finished Goods $632,900 $485,000 other information Sales Revenue $5,731,000Factory Supplies Purchased 64,000Direct Factory Labor 792,000Raw Materials Purchased 560,000Plant janitorial service…arrow_forwardYou wish to take an Excel course. You may enroll at one within your school or you may take a community class at the local library. You've gathered the following information to aid in your decision-making process: Costs/Benefits College Course Community Course Cost $4,300 $1,190 Distance to course 0.20 miles (walking distance) 18 miles (driving distance) Timing of course Weekday Weekend Number of meetings 16 8 Qualitative considerations Convenience, quality of instruction Flexibility, brief duration Pretend transportation (gas, mileage, and parking) cost $220 per class session at the library. If you consider solely the cost - including transportation - of each alternative, which would you choose? Multiple Choice College course Community course Both alternatives Neither alternativearrow_forwardLearning curve, cumulative average-time learning model. Northern Defense manufactures radar systems. It has just completed the manufacture of its first newly designed system, RS-32. Manufacturing data for the RS-32 follow: Calculate the total variable costs of producing 2, 4, and 8 units.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage Learning
Managerial Accounting: The Cornerstone of Busines...
Accounting
ISBN:9781337115773
Author:Maryanne M. Mowen, Don R. Hansen, Dan L. Heitger
Publisher:Cengage Learning
Inspection and Quality control in Manufacturing. What is quality inspection?; Author: Educationleaves;https://www.youtube.com/watch?v=Ey4MqC7Kp7g;License: Standard youtube license