Purple Swift manufactures birdhouses in lots of 10. Each birdhouse takes 45 minutes to paint. After 10 birdhouses are painted, the company switches paint color which requires a 1-hour changeover. The company works 8 hours per shift, one shift per day, 220 days per year. Currently the company has one paint booth. What is Purple Swift’s paint capacity cushion if it builds 2,000 birdhouses per year?
Trending nowThis is a popular solution!
Chapter 4 Solutions
Operations Management: Processes and Supply Chains, Student Value Edition Plus MyLab Operations Management with Pearson eText -- Access Card Package (12th Edition)
Additional Business Textbook Solutions
Principles Of Operations Management
Operations Management, Binder Ready Version: An Integrated Approach
OPERATIONS MANAGEMENT IN THE SUPPLY CHAIN: DECISIONS & CASES (Mcgraw-hill Series Operations and Decision Sciences)
Operations Management: Sustainability and Supply Chain Management (12th Edition)
Business in Action
Operations and Supply Chain Management 9th edition
- A business company has the following capacity per month based on the following: 30 working days per month; 1 shift operation at 8 hours per shift; 30 minutes break per shift per employee ABC company produces bicycles and has the following Capacities per process. Frame Welding: 60 bikes per hour per machine Painting: 20 bikes per hour per worker Assembly: 50 bikes per hour per worker Inspection: 100 bikes per hour per worker What can be observed from the system if the demand for the month is 5,000 bikes?arrow_forwardThe owner of Firewood To Go is considering buying a hydraulic wood splitter which sells for $50,000. He figures it will cost an additional $100 per cord to purchase and split wood with this machine, while he can sell each cord of split wood for $125. If, for this machine, design capacity is 50 cords per day, effective capacity is 40 cords per day, and actual output is anticipated to be 35 cords per day, what would be its utilization? 100 percent 80 percent 75 percent 70 percent 0 percent The owner of Firewood To Go is considering buying a hydraulic wood splitter which sells for $50,000. He figures it will cost an additional $100 per cord to purchase and split wood with this machine, while he can sell each cord of split wood for $125. If, for this machine, design capacity is 50 cords per day, effective capacity is 40 cords per day, and actual output is expected to be 32 cords per day, what would be its efficiency? 100 percent 80 percent 75 percent 70 percent 0 percentarrow_forwardIn order to produce 1000 units of X in a week? units X is scheduled weekly for Operation B (due to 5% scrap ratio)? units X is scheduled weekly for Operation A (due to 2% scrap ratio) Based on your answer in part a, find the number of machines required to produce 1000units of X per week.? The total time required to perform Operation B = ? minutes per week? The total time required to perform Operation A = ? minutes per weekH= Available Time in a week = minutes /weekThusFA = ?FB = ?Since both of the operations A and B are performed on the same machine? machines are requiredarrow_forward
- A company makes two products X and Y, using a single resource pool. The resource is available for 8 hours a day. The unit loads for X and Y are 15 and 30 minutes per unit, respectively. If the company decides to produce X only, calculate the hourly, and the daily capacity. Repeat the hourly and daily capacity calculation for product Y only, similarly (meaning that if this company was about to only produce Y, how many units per hour and per day it could produce? The company wishes to produce both products, but not at equal portions. 60% X’s and 40% Y’s is desired for production. At the indicated percentages, what is the daily capacity of this company? Hint 1: find the weighted unit load based on the given portions and apply that in the effective capacity formula. Hint 2: It will be a mistake to allocate 60% of the available time to produce X. Rather, apply hint 1 to make sure the resulting production will be 60% from X units and 40% from Y’s.arrow_forwardA furniture factory makes two types of wooden tables,large and small. See the flowchart below.SetupTime,MinutesRun Timeper Piece,MinutesCapacity,Piecesper HourWood cutting 30 5 15Make four legs 60 10 10Make tops 60 12 8Finish the wood 20 8 12Assemble and ship 20 17 14 Small tables are made in batches of 100, and large tables are made in batches of 50. A batch includes a fixed setup time for the entire batch at each process step and a run time for each piece in the batch. Both large and small tables have the same processing times. The capacities of each process step are given, and apply to production of either type of table, as shown in the flowchart.a. What is the capacity of the system, and what is the bottleneck?b. What are the throughput times for batches of large and small tables?c. When producing at a rate of six small tables per hour on average, how many tables will be in the system?arrow_forwardGiven the following information, compute the efficiency and the utilization of the vehiclerepair department:Design capacity = 50 trucks per dayEffective capacity = 40 trucks per dayActual output = 36 trucks per dayarrow_forward
- A company makes two products X and Y, using a single resource pool. The resource is available for 8 hours a day. The unit loads for X and Y are 15 and 30 minutes per unit, respectively. If the company decide to produce X only, calculate the hourly, and the daily capacity. Repeat the hourly and daily capacity calculation for product Y only, similarly (meaning that if this company was about to only produce Y, how many units per hour and per day it could produce?) The company wishes to produce both products, but not at equal portions. 60% X’s and 40% Y’s is desired for production. At the indicated percentages, what is the daily capacity of this company? Hint 1: find the weighted unit load based on the given portions and apply that in the effective capacity formula. Hint 2: It will be a mistake to allocate 60% of the available time to produce X. Rather, apply hint 1 to make sure the resulting production will be 60% from X units and 40% from Y’s.arrow_forwardUp, Up, and Away is a producer of kites and wind socks.Relevant data on a bottleneck operation in the shop for theupcoming fiscal year are given in the following table:Item Kites Wind SocksDemand forecast 30,000 units/year 12,000 units/yearLot size 20 units 70 unitsStandard processing time 0.3 hour/unit 1.0 hour/unitStandard setup time 3.0 hours/lot 4.0 hours/lotThe shop works two shifts per day, 8 hours per shift, 200 daysper year. Currently, the company operates four machines,and desires a 25 percent capacity cushion. How many ma-chines should be purchased to meet the upcoming year’s de-mand without resorting to any short-term capacity solutions?arrow_forwardCarCity is a big retailer for car parts and accessories. The store stocks different types and sizes of car tire. One of the best selling tires is the Tiger Model R125, which is currently purchased from a factory in Indonesia. An analysis of the purchasing operation shows that approximately 3 labor hours are required to process a purchase order, regardless of the quantity purchased. Salaries in the purchasing Department average OMR 12 per hour, including employee benefits. In addition, a detailed analysis of 15 previous purchase orders showed that OMR 132 was spent on telephone, paper, and other consumables directly related to the ordering process . Shipping cost from Indonesia is OMR 230 for a container. A container has a capacity of 800 tires. The lead time for shipments from Indonesia is 15 days. Finally, CarCity’s financial analysts established a holding cost of 20% for this type of tire. The annual demand for the R125 tire is constant at a rate of 8400 units. The store purchases…arrow_forward
- In order to produce 1000 units of X in a week units X is scheduled weekly for Operation B (due to 5% scrap ratio) units X is scheduled weekly for Operation A (due to 2% scrap ratio) Based on your answer in part a, find the number of machines required to produce 1000 units of X per week. The total time required to perform Operation B = minutes per week The total time required to perform Operation A = minutes per week H= Available Time in a week = minutes /week Thus FA = . FB = . Since both of the operations A and B are performed on the same machine machines are requiredarrow_forwardStackhouse Computing produces high-performance desktop computers. Labor cost data show that thecompany spent $1,000,000 for 5,000 computers produced, and each computer requires 2 technicianhours and 5 hours of direct labor. Direct labor is paid $10 per hour by the company. What is the costof 1 technician hour?arrow_forwardBerger Mortgage Co. provides the following data on its loan application processing activities for the month of February: Move time 18 hours Wait time 63 hours Process time 230 hours Storage time 15 hours Inspection time 22 hours Compute the cycle efficiency for February: FOR THIS QUESTION, WOULD STORAGE TIME BE INCLUDED IN THE SUM FOR THROUGHPUT TIME? ALSO COULD YOU EXPLAIN HOW TO GET THE THROUGHPUT TIME. THANKSarrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.