Chapter 43, Problem 1P
To determine
The takt time.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Consider a line consisting of only one machine. This machine takes on average 4 minutes (te=4 min) to complete a job and Ca2=Ce2=1. The arrival rate of the parts to this machine is 1/8 part/minutes. Assume that there is enough space for only 5 parts between the machines (Hint: the buffer size, b, is 5.) Compute the expected CT of this production line.
CT=_________
A CNC milling machine has a purchase price of £120,000 and it is considered from an accounting standpoint to be depreciated to zero value over a period of 5 years. If the machine is to be used for 2 shifts with each shift working for 37 hours/ week and 45 weeks/ year. What is the machine cost/ hr which must be charged in order to amortise/repay the costs over the 5 year period?
To make the calculation simpler, you can assume that over the 5 year period you will be required to pay back 8% interest on the sum borrowed.
Express your answer in § / hour rounded up to the nearest penny
Please provide steps on how to derive the output of each container.
Chapter 43 Solutions
Degarmo's Materials And Processes In Manufacturing
Ch. 43 - How is conventional automotive assembly different...Ch. 43 - Explain the differences between push vs. pull in a...Ch. 43 - If the available assembly time remains the same,...Ch. 43 - Prob. 4RQCh. 43 - Prob. 5RQCh. 43 - Depending on market demand, assembly lines have to...Ch. 43 - Why is it difficult for most automotive...Ch. 43 - What is the impact of not capturing precedence...Ch. 43 - Explain ergonomic constraints in the context of...Ch. 43 - Prob. 10RQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- The production manager of a manufacturing firm has tracked the average repair and maintenance cost of a machine for 10 years. Cost averages were steady at Rs. 20,000 for the first five years, but have increased consistently by Rs. 5,000 for each of the last 5 years. Draw the cash flow diagram and calculate the equivalent present worth and annual worth of the costs, if interest rate is 6% per annum.arrow_forward1. A certain batch of parts is routed through six machines in a batch production plant. The setup and operation times for each machine are given in the table below. Batch size is 200 and the average nonoperation time per machine is15 hr. Determine (a) manufacturing lead time and (b) hourly production rate for operation 4.Machine 1 2 3 4 5 6Setup time (hr) 5 3 6 4 5 3Operation time (min) 3.0 3.3 8.2 3.9 4.5 2.3 a. 6(4.3+200(3.9/60)+15) = 193.8 hours 24.2 days if 8 hour shiftb. 4(60)+200(3.9)/200 =5.1 hourly production for operation 4 2. Suppose the part in the previous problem is made in very large quantities on a production line in which an automated work handling system is used to transfer parts between machines. Transfer time between stations is 30 sec. total time required to setup the entire line is 102 hr. Assume that the operation times at the individual machines remain the same as in the previous problem, Determine (a) manufacturing lead time for a part coming off the line,…arrow_forwardA toy manufacturing uses 51030 rubber wheels per year for its popular dump truck series. The firm makes its own wheels, which it can can produce at a rate of 800 per day. The toy trucks are assembled uniformly ( at a constant rate ) over the entire year. Carrying cost is $ 1.50 per wheel per year. setup cost for the production run of the wheel is $ 47. The firm operatyes 243 days per year. Determine each of the following: 1-Optimal run size 2-Use your final answer from part 1 to determine minimum total annual cost for carrying and setup 3-Cycle time for the optimal run size 4-Run timearrow_forward
- Develop the activity sequence model and determine the normal time for the following work activity:arrow_forwardA flow-line mass production operation consists of six manual workstations. Work units are moved synchronously and automatically between stations, with a transfer time of 10 secs. The manual processing operations performed at the six stations take 45 sec, 50 sec, 40 sec, 42 sec, 30 sec, and 55 sec, respectively. Determine (a) cycle time for the line, (b) time to process one work until through the six workstations, (c) average production rate, and (d) time to produce 20,000 units.arrow_forwardSolve fast step by steparrow_forward
- Estimate the effort, time, production and the number of personnel necessary for the development of a Communications system that has a size of 30,000 LDC. In this project there are factors that influence the development and ensure the proper functioning of the system. These are: Complexity of development, staff qualification and advanced knowledge of the language in which it will be developed. Each factor in the order described has a weighted value of 1.15, 0.7 and 0.91 respectively. It is important to mention that the monthly payment per person working in the development is $2,200.arrow_forwardplease show the following solutions, cancellation of units and processes in between.arrow_forwardIn a casting machining company, it takes an operator 30 seconds to load ,15 seconds to unload each machining center. There are several same centers, all working on the same type of part, and the duration of the automatic operation is 1 minute. The travel time between machines is 15 seconds. Given that the cost per hour of the operator $8 and the cost per hour of the machine is $10, using the man-machine diagram, determine the value of the highest production rate for the systemarrow_forward
- A toy factory is planning to make an additional item, which would be processed in 4 departments. The company is proposing to produce 600,000 units per year, working 250 days per year. The estimates of times made by an industrial engineer are in the table: Departments Times 1 2 3 4 Average processing time (second/part) 8 13 10 50 Average maintenance, time/day (minutes) 20 30 20 15 Average daily setup, time (minutes) 20 15 30 20 Average bookkeeping, time/day (minutes) 10 8 12 5 Machine adjustment, time/day (minutes) 15 10 15 15 Defective items, (% of production) 5 6 4 4 The parts are produced within the departments in a sequential manner (from department 1 to 2 to 3 to 4). Determine the efficiency of each departmental operation if only one shift is operated between 7:30 am-4:30 pm, with a 40 minute lunchbreak and two 10 minute coffee breaks.arrow_forwardNewton fluid having a density of Viscosity and a viscosity of μ flows in a cylindrical tube having a diameter of D and a length of L by a pressure difference of >0. Assuming that the cylinder is horizontal with steady state, full development flow, based on momentum and mechanical energy balance equations,(1) Indicate the friction for the pressure difference.(2) Indicate the friction against the shear stress on the inner wall of the tube.(3) Write an expression defining the coefficient of friction and indicate the pressure difference.arrow_forwardIf an X-bar chart graph falls below the LCL or rises above the UCL, a machining process is said to be _________.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Precision Machining Technology (MindTap Course Li...Mechanical EngineeringISBN:9781285444543Author:Peter J. Hoffman, Eric S. Hopewell, Brian JanesPublisher:Cengage Learning
Precision Machining Technology (MindTap Course Li...
Mechanical Engineering
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Cengage Learning
Column buckling; Author: Amber Book;https://www.youtube.com/watch?v=AvvaCi_Nn94;License: Standard Youtube License