Practical Management Science, Loose-leaf Version
Practical Management Science, Loose-leaf Version
5th Edition
ISBN: 9781305631540
Author: WINSTON, Wayne L.; Albright, S. Christian
Publisher: Cengage Learning
bartleby

Concept explainers

Question
Book Icon
Chapter 5, Problem 54P

a)

Summary Introduction

To determine: The way to minimize the shipping costs.

Introduction: In linear programming, unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints then it is said to be unfeasible solution.

b)

Summary Introduction

To modify: The spreadsheet model in Part (a), as no shipping is allowed.

Introduction: In linear programming, unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints then it is said to be unfeasible solution.

c)

Summary Introduction

To modify: The spreadsheet model in Part (a), if shipments between Country H and Country T are allowed.

Introduction: In linear programming, unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints then it is said to be unfeasible solution.

Blurred answer
Students have asked these similar questions
A person starting in Columbus must visit Great Falls, Odessa, and Brownsville, and then return home to Columbus in one car trip. The road mileage between the cities is shown.   Columbus Great Falls Odessa Brownsville Columbus --- 102 79 56 Great Falls 102 --- 47 69 Odessa 79 47 --- 72 Brownsville 56 69 72 --- a)Draw a weighted graph that represents this problem in the space below. Use the first letter of the city when labeling each b) Find the weight (distance) of the Hamiltonian circuit formed using the nearest neighbor algorithm. Give the vertices in the circuit in the order they are visited in the circuit as well as the total weight (distance) of the circuit.
TMA manufactures 37-in. high definition LCD televisions in two separate locations, Locations I and II. The output at Location I is at most 6000 televisions/month, whereas the output at Location II is at most 5000 televisions/month. TMA is the main supplier of televisions to the Pulsar Corporation, its holding company, which has priority in having all its requirements met. In a certain month, Pulsar placed orders for 3000 and 4000 televisions to be shipped to two of its factories located in City A and City B, respectively. The shipping costs (in dollars) per television from the two TMA plants to the two Pulsar factories are as follows.       To Pulsar Factories     From TMA City A City B   Location I $5 $3   Location II $6 $9 TMA will ship x televisions from Location I to city A and y televisions from Location I to city B. Find a shipping schedule that meets the requirements of both companies while keeping costs to a minimum. (x, y)  =…
Companies A, B, and C supply components to three plants (F, G, and H) via two crossdocking facilities (D and E). It costs $4 to ship from D regardless of final destination and $3 to ship to E regardless of supplier. Shipping to D from A, B, and C costs $3, $4, and $5, respectively, and shipping from E to F, G, and H costs $10, $9, and $8, respectively. Suppliers A, B, and C can provide 200, 300 and 500 units respectively and plants F, G, and H need 350, 450, and 200 units respectively.  Crossdock facilities D and E can handle 600 and 700 units, respectively. Logistics Manager, Aretha Franklin, had previously used "Chain of Fools" as her supply chain consulting company, but now turns to you for some solid advice. What is the objective function? Group of answer choices Max Z = $3AD + $3AE + $4BD + $3BE + $5CD + $3CE + $4DF + $4DG + $4DH + $10EF + $9EG + $8EH Min Z = $3AD + $3AE + $4BD + $3BE + $5CD + $3CE + $4DF + $4DG + $4DH + $10EF + $9EG + $8EH Min Z = $3AD + $3BE + $5CD + $3CE…

Chapter 5 Solutions

Practical Management Science, Loose-leaf Version

Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,