Question
Chapter 5, Problem 9CQ
Summary Introduction
To identify: If the given statement is true or false regarding the workload table.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A lab provides ultrasound service to patients. The service process consists of two
steps:
1. Registration. Performed by a receptionist (Salary rate = $25/hr; Process time
= 6 minutes/patient)
2. Ultrasound scan. Performed by a technician (Salary rate = $30/hr; Process
time = 20 minutes/patient)
Note that the ultrasound images need to be read by radiologists, but we assume that
they have an ample capacity and thus will not model the role in the service process.
Currently, the lab has 2 receptionists and 3 technicians. The manager anticipates
demand to grow to 14 patients/hr in the near future. Thus, he plans to hire more
receptionists and/or technicians to increase the service capacity to at least 14
patients/hr. What would be the extra payroll cost (in dollars per hr)?
Process time is part of cycle time. The process time of a business process refers to:
a. alWways is the largest part of cycle time.
b. timMe a customer spends waiting in a queue (e.g., time customer spends waiting in a drive-thru line)
c. is ofFten considered to be value-added time to the customer.
d. timMe from beginning to completion of the business process.
A graphics reproduction i rm has four units of equipment that are automatic but occasionallybecome inoperative because of the need for supplies, maintenance, or repair. Eachunit requires service roughly twice each hour, or, more precisely, each unit of equipmentruns an average of 30 minutes before needing service. Service times vary widely, rangingfrom a simple service (such as pressing a restart switch or repositioning paper) to moreinvolved equipment disassembly. The average service time, however, is i ve minutes.Equipment downtime results in a loss of $20 per hour. The one equipment attendant ispaid $6 per hour.Using i nite queuing analysis, answer the following questions:a. What is the average number of units in line?b. What is the average number of units still in operation?c. What is the average number of units being serviced?d. The i rm is considering adding another attendant at the same $6 rate. Should the i rmdo it?
Chapter 5 Solutions
OPERATIONS MANAGEMENT LL W/CONNECT CODE
Ch. 5 - Prob. 1CQCh. 5 - Prob. 2CQCh. 5 - Prob. 3CQCh. 5 - Prob. 4CQCh. 5 - Prob. 5CQCh. 5 - Prob. 6CQCh. 5 - Prob. 7CQCh. 5 - Prob. 8CQCh. 5 - Prob. 9CQCh. 5 - Prob. 10CQ
Ch. 5 - Prob. 11CQCh. 5 - Prob. 12CQCh. 5 - Prob. 13CQCh. 5 - Prob. 14CQCh. 5 - Prob. 15CQCh. 5 - Prob. 16CQCh. 5 - Prob. 1PACh. 5 - Prob. 2PACh. 5 - Prob. 3PACh. 5 - Prob. 4PACh. 5 - Prob. 5PACh. 5 - Prob. 6PACh. 5 - Prob. 7PACh. 5 - Prob. 8PACh. 5 - Prob. 9PACh. 5 - The help desk at Triple Stacked handles calls from...Ch. 5 - Prob. 11PACh. 5 - A pharmaceutical company creates a compound with a...Ch. 5 - Prob. 13PACh. 5 - Prob. 14PACh. 5 - Prob. 15PACh. 5 - Prob. 16PA
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- An engineering i rm retains a technical specialist to assist four design engineers workingon a project. The help that the specialist gives engineers ranges widely in time consumption.The specialist has some answers available in memory, others require computation,and still others require signii cant search time. On the average, each request for assistancetakes the specialist one hour.The engineers require help from the specialist on the average of once each day. Becauseeach assistance takes about an hour, each engineer can work for seven hours, on the average,without assistance. One further point: Engineers needing help do not interrupt if thespecialist is already involved with another problem.Treat this as a i nite queuing problem and answer the following questions:a. How many engineers, on average, are waiting for the technical specialist for help?b. What is the average time that an engineer has to wait for the specialist?c. What is the probability that an engineer will have to wait…arrow_forwardA Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to produce a board, the PCB machine requires a 16-minute setup. Once in production, the PCB machine requires only 0.19 minute per board. a. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the capacity of the PCB machine (in boards per min)? b. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the utilization of the PCB machine? c. Say the PCB machine produces 400 boards s between setups and demand is 2 boards per minute. Given the operating process, what is the avergae inventory of boards anf the PCB machine? d. Demand for boards occurs at the rate of 2 boards per minute. What is the smallest batch size such that the PCB machine does not constrain the flow rate through the process?arrow_forwardPeople are served in a process with two resources. A worker in the first resource serves 28 people per hour and a worker in the second resource serves 14 people per hour. The first resource has 3 workers and the second resource has 5 workers. Demand occurs at the rate 14 people per minute (Instruction Round your answer to one decimal place) What is the implied utilization (%) of the second resource?___________arrow_forward
- 23Qarrow_forwardYou observe a bank and notice that a customer leaves the bank about every five minutes.These five minutes between customers are:a. the capacity of the process.b. the processing time of the last resource.c. the cycle time.d. the lead timearrow_forwardWhich of the following statements is TRUE? Group of answer choices The bottleneck resource is the one that determines the capacity of a process, and thus its utilization is always 100%. Because there is excess capacity compared to the bottleneck resource, non-bottleneck resource is always under-utilized, and its utilization is less than 100%. The bottleneck resource constrains the flow of the process, and thus the flow rate is always the same as the bottleneck capacity. When process is capacity constrained, utilization tells us by how much demand exceeds capacity. It is always necessary to add more capacity to the bottleneck stage to increase the Flow rate of the process.arrow_forward
- The bottleneck resource in a process has the least idle time. True or false?a. Trueb. Falsearrow_forwardIf a flow unit type j does not consume any time at a resource i, the corresponding cell inthe workload matrix, WL(i, j), is zero. True or false?a. Trueb. Falsearrow_forwardA department works one 8-hour shift, 250 days a year, and has these figures for usage of amachine that is currently being considered:ProductAnnualDemandStandard ProcessingTime per Unit (hr)Processing TimeNeeded (hr)1 400 5.0 2,0002 300 8.0 2,4003 700 2.0 1,4005,800Units of capacity needed = Processing time needed ___________________________ Processing time capacity per unit (5–3)Working one 8-hour shift 250 days a year provides an annual capacity of 8 × 250 =2,000 hours per year. Consequently, three of these machines would be needed to handle therequired volume:5,800 hours __________________ 2,000arrow_forward
- A company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labour content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used five workers, who produced an average of 100 carts per hour. Workers receive $10 per hour, and machine cost was $40 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $10 per hour while output increased by 20 carts per hour. a. The labor productivity under the old system is Blank 1. Fill in the blank, read surrounding text. and the new system is Blank 2. Fill in the blank, read surrounding text. carts per worker per hour. b. Compute the total factor productivity under each of the systems. Old system Blank 3. Fill in the blank, read surrounding text.arrow_forwardA fast food restaurant receives a large volume of drive-through orders. A Lean Six Sigma team wants to understand the resources required to maintain a maximum target cycle time of 4 minutes. When demand fluctuates, personnel can be reassigned temporarily to increase the rate of processing. If the normal processing rate is 40 seconds per order, what should the maximum customers in process (queue) be before reassigning resources?arrow_forwardDo: 12-21 Truck drivers working for Juhn and Sons (see Problems 12-19 and 12-20) are paid a salary of $20 per hour on average. Fruit loaders receive about $12 per hour. Truck drivers waiting in the queue or at the loading gate are drawing a salary but are productively idle and unable to generate revenue during that time. What would be the hourly cost savings to the firm associated with employing two loaders instead of one? Not this: 12-19 Juhn and Sons Wholesale Fruit Distributors employs one worker whose job is to load fruit on outgoing company trucks. Trucks arrive at the loading gate at an average of 24 per day, or 3 per hour, according to a Poisson distribution. The worker loads them at a rate of 4 per hour, following approximately the exponential distribution in service times. Not this: 2-20 Juhn believes that adding a second fruit loader will substantially improve the firm’s efficiency. He estimates that a two-person crew, still acting like a single-server system, at the loading…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,