Question
Chapter 5, Problem 9PA
a)
Summary Introduction
To determine: The implied utilization of each resource.
b)
Summary Introduction
To determine: The actual and maximum flow rate of each type of clients through this process.
Expert Solution & Answer
![Check Mark](/static/check-mark.png)
Want to see the full answer?
Check out a sample textbook solution![Blurred answer](/static/blurred-answer.jpg)
Students have asked these similar questions
A company assembles a product that consists of three pieces called AA,
BB, and CC. The AA and BB parts are manufactured by the company
itself, while the CC parts are purchased from another manufacturer.
The process times, in hours, required for each piece in each of the
processes are given in the following table:
Process 1 Process 2 Process 3 Process 4 Process 5
AA
1
0.5
0.5
BB
1.5
0.5
0.5
0.5
The company has 20 machines that can carry out process 1, 5 process
2, 10 process 3, 5 process 4 and 5 process 5. Each machine works a
maximum of five days each week at a rate of fifty weeks a year , in
working days of 8 hours a day. Formulate and solve to determine the
maximum number of assembled sets that you can produce.
DreamInflate is a balloon manufacturing company. Balloon manufacturing consists of seven
work stations, each performing a single step as indicated in the table below. There are five
workers manned for the seven work stations as shown. Assume the workers are paid $15 per
Worker
Task Sequence
Processing Time (secs/balloon)
Task
Dye production
Electrocharging
Dipping (Cold and Hot)
Mortar Dipping
Balloon inflation and delaltexing
Vulcanization
Inspection/Testing
1
30
w1
20
3
35
W2
25
W3
30
W4
6.
45
W5
7
40
hour. Each balloon pack is sold for $6 and has a variable cost of $1. The company has fixed
costs of $200 per hour. There is more demand than the overall production system can provide.
Based on the information provided, answer the following questions:
• What is the cost of direct labor for balloons?
• How much profit does DreamInflate make every hour? (note that the cost of direct labor
is also a variable cost).
What would the profit of DreamInflate be if the variable costs were 10…
[The following information applies to the questions displayed below.]
The following are the car repair shop data:
TETE
Ticket No.
Work
Ticket No.
Work
Ticket No.
Work
1
Lube & oil
11
Battery
21
Battery
Tires
2
Lube & oil
12
Tires
22
3
Brakes
13
Brakes
23
Brakes
4
Lube & oil
14
Transmission
24
Transmission
Lube & oil
15
Brakes
25
Brakes
Tires
16
Battery
26
Lube & oil
7
Tires
17
Brakes
27
Lube & oil
8.
Brakes
18
Tires
28
Lube & oil
9.
Brakes
19
Tires
29
Tires
10
Lube & oil
20
Lube & oil
30
Lube & oil
Chapter 5 Solutions
Operations Management
Ch. 5 - Prob. 1CQCh. 5 - Prob. 2CQCh. 5 - Prob. 3CQCh. 5 - Prob. 4CQCh. 5 - Prob. 5CQCh. 5 - Prob. 6CQCh. 5 - Prob. 7CQCh. 5 - Prob. 8CQCh. 5 - Prob. 9CQCh. 5 - Prob. 10CQ
Ch. 5 - Prob. 11CQCh. 5 - Prob. 12CQCh. 5 - Prob. 13CQCh. 5 - Prob. 14CQCh. 5 - Prob. 15CQCh. 5 - Prob. 16CQCh. 5 - Prob. 1PACh. 5 - Prob. 2PACh. 5 - Prob. 3PACh. 5 - Prob. 4PACh. 5 - Prob. 5PACh. 5 - Prob. 6PACh. 5 - Prob. 7PACh. 5 - Prob. 8PACh. 5 - Prob. 9PACh. 5 - The help desk at Triple Stacked handles calls from...Ch. 5 - Prob. 11PACh. 5 - A pharmaceutical company creates a compound with a...Ch. 5 - Prob. 13PACh. 5 - Prob. 14PACh. 5 - Prob. 15PACh. 5 - Prob. 16PA
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Four employees at a fast-food restaurant each perform one of the four activities in serving a customer: greet customer, take order, process order, and deliver order. The processing time for each activity is given as follows: Greet customer Take order Process order Deliver order A) 50% Assume demand is unlimited. What is the average labor utilization? B) 68% C) 40% Activity D) 162% Processing time per customer 2 seconds 30 seconds 60 seconds 5 secondsarrow_forwardTotal customer-response time (CRT) can be defined as which of the following? (Hint: Refer to textExhibit 14.14 and the accompanying discussion.)a. The difference between when a customer’s order is set up and when the order is finishedb. The elapsed time between when a customer places an order for a product and when that order isdelivered to the customerc. Manufacturing lead (cycle) time for the orderd. The time between when an order is received by manufacturing and when that order is completedarrow_forwardThe Union Manufacturing Company is producing two types of products: A and B. The demand forecasts, batch size, and time standards follow: Demand forecast (units/yr) Product A Product B 1,000 4,000 Batch size (units/batch) Processing time (hr/unit) 20 10 3.2 4.5 Setup time (hr/batch) 10 20 Both products are produced on the same machine, called Mark I. 11) Using Table 4.1, what is the total number of hours required of Mark I equipment for the next year? A) fewer than 29,000 hours B) between 29,000 and 30,000 hours C) between 30,000 and 31,000 hours D) more than 31,000 hoursarrow_forward
- local market research fim has just won a contract for several thousand small projects involving data gathering and statistical analysis. In the past, the firm has assigned each project to a single member of its highly trained professional staff. This person would both gather and analyze the data Using this approach, an experienced person can complete an average of 10 such projects in an eight-hour day. The firm's management is thinking of assigning two people to each project in order to allow them to specialize and become more efficient The process would require the data gatherer to fill out a matrix on the computer, check it and transmit it to the statistical analysis program for the analyst to complete. Data can be gathered on one project while the analysis is being completed on another, but the analysis must be complete before the statistical analysis program can accept the new data. After some practice, the new process can be completed with a standard time of 20 minutes…arrow_forwardConsider a process consisting of five resources that are operated 8 hours per day. Theprocess works on three different products, A, B, and C: Demand for the three different products is as follows: product A, 40 units per day;product B, 50 units per day; and product C, 60 units per day.a. What is the bottleneck?b. What is the flow rate for each flow unit, assuming that demand must be served in the mixdescribed above (i.e., for every four units of A, there are five units of B and six units of C)?arrow_forwardConsider the following batch-flow process consisting of three process stepsperformed by three machines. Process steps step 1 step 2 step 3 processing time 0.25min./unit 0.20 min./unit 0.15 min./unit setup time 30 min 20 min 45 min Work is processed in batches at each step. Before a batch is processed at a step, the machine atthat step must be set up. (During a setup, the machine is unable to process any product.) Assumethat there is a dedicated setup operator for each machine (i.e., there is always someone availableto perform a setup at each machine.)a. What is the capacity of step 1 if the batch size is 35 parts?b. For what batch sizes is step 1 (2, 3) the bottleneck?arrow_forward
- Consider a law firm with 15 lawyers and 3 paralegals. The firm is struggling to keep up with the high demand for its services, particularly during the busy litigation seasons. It has been observed that the lawyers spend a significant amount of their time on administrative tasks that could potentially be handled by paralegals. After a careful study of the work distribution within the firm, it was determined that 35% of the activities carried out by the lawyers are administrative in nature. Given that each lawyer works 50 hours a week, please determine: (a) How many additional paralegals should the firm hire to handle the administrative tasks currently performed by the lawyers? (b) If the lawyers' time spent on administrative tasks is redirected to billable legal work, by what percentage could the firm potentially increase its billable hours?arrow_forwardThree employees at a fast-food restaurant each perform one of the three activities in serving a customer: take the order, process the order, and deliver the order. The processing time for each activity is given as follows: Activity Processing Time Take the order 30 seconds Process the order 2 minutes Deliver the order 1 minute Assume that the demand is 20 customers/hour. What is the average labor utilization? a 38.9% b 85.7% c 66.7% d 100%arrow_forwardThe manager of the Personnel Department at City Enterprises has been reading about time-driven ABC and wants to apply it to her department. She has identified four basic activities her employees spend most of the their time on: Interviewing, Hiring, Assessment, and Separation Processing. The department employs 5 staff who perform these activities. The manager provides the following estimates for the amount of time it takes to complete each of these activities: Interviewing: 45 minutes. Hiring: 60 minutes. Assessment: 75 minutes. Separation Processing: 90 minutes. Employees in Personnel work 35-hour weeks with four weeks for vacation. Of the 35 hours, five are reserved for administrative tasks, training, and so on. The costs of the Personnel Department, including any allocated costs from other staff functions, are $972,000. During the year, Personnel conducted 1,200 interviews, made 375 hires, made 3,000 assessments, and had 250 separations. The manager of the Personnel…arrow_forward
- ABC Manufacturing is evaluating the desirability of implementing process improvements and is seeking your help in determining whether it should proceed with the proposed improvements. One area of focus is how the improvements will affect processing time (manufacturing cycle time efficiency). Estimated activities and associated times for these activities under both the current process and after process improvements are as follows: Process Activity Current Process After Process Improvements Wait time 4 hours 1 hour Inspection 40 minutes 5 minutes Moving 80 minutes 20 minutes Processing (manufacturing) 2 hours 75 minutes Required: 1. Determine the manufacturing (production) lead time (in minutes) for each of the two decision alternatives. 2. Determine the manufacturing cycle efficiency (MCE) for each decision alternative.arrow_forwardPA 3-9 (Algo) Consider a four-step serial process with... Consider a four-step serial process with the number of workers at each step and processing times given in the following table. Time per Customer (in Minutes) 5 14 6 3 Process Step 1 Number of Workers 1 Assuming that the process starts out empty and is worker-paced, how long will it take (in minutes) to serve 30 customers? Note: Round to nearest minute. Time taken minutesarrow_forwardPanini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken, and pastrami. Demand (sandwiches per hour) are Grilled Vegetables = 25, Grilled Chicken = 15, and Pastrami = 10. There are up to five steps in the process of making sandwiches, listed below with processing times. Step Grilled Vegetables Grilled Chicken Pastrami Cut bread 0.75 minutes 0.75 minutes 0.75 minutes Grill 1.4 minutes 1.4 minutes Slice meat 3 minutes Toast 2 minutes 2 minutes 2 minutes Wrap 0.5 minutes 0.5 minutes 0.5 minutes Only 50 percent of customers want their sandwich toasted, no mattor which sandwich is ordered. Suppose Panini employs 1 worker at each step. Instructions: Round all answers to 1 decimal place. (a) What is the implied utilization of each of the five steps in this process? 62.5 % 93.3 % 50.이% 83.3 % 41.7 % Cut Grill Slice Toast Wrap (b) What is the actual and maximum flow rates of the three sandwich types? per hour Veg Chicken per hourarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
![Text book image](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,