a)

Summary Introduction

To determine: The capacity of the machine (Housings per hour).

b)

Summary Introduction

To determine: The utilization of the machine.

c)

Summary Introduction

To determine: The average inventory of housings.

d)

Summary Introduction

To determine: The number of D7000 housing to be produced in each batch.

Blurred answer
Students have asked these similar questions
A final assembly plant for a certain automobile model is to have a capacity of 240,000 units annually. The plant will operate 50 weeks/yr, two shifts/day, 5 days/week, and 8.0 hours/shift. It will be divided into three departments: (1) Body shop, (2) paint shop, (3) trim-chassis-final department. The body shop welds the car bodies using robots, and the paint shop coats the bodies. Both of these departments are highly automated. Trim-chassis-final has no automation. There are 15.5 hours of direct labor content on each car in this department, where cars are moved by a continuous conveyor. Determine: (a) Hourly production rate of the plant, (b) number of workers and workstations required in trim-chassis-final if no automated stations are used, the average manning level is 2.5, balancing efficiency = 93%, proportion uptime = 95%, and a repositioning time of 0.15 min is allowed for each worker.
You work for a small shipping company and warehouse. The owners have decided to update the software used for tracking, shipping, receiving, and inventory. Fifteen computers need to be updated. Hours of operation are 7 a.m. to 7 p.m. Monday through Saturday. Each computer must be updated manually by one of two trained employees, both of whom must be borrowed from other managers. The update procedure consumes 4 hours of the updater's time and generates an additional 1.5 hours of computer downtime. The work must be performed at a central loading station, away from the current location of the computer. How does the project portfolio management approach lead to enhanced strategic management for an organization and give an example how you woulduse this in a work place?
Furniture Face Lift refinishes old wood furniture. Their process for refinishing chairs has 9 workers and 4 stations. Each chair starts at the Stripping station, then goes to Priming, then to Painting and finally to Inspection. Where there are multiple workers within a station, each worker works independently on his/her own chair. Assume inventory buffers are allowed between each station. Station Staffing Processing time (hours per chair per worker) Stripping 3 2.5 Priming 2 1.5 Painting 3 1.75 Inspection 1 0.8   A truck loaded with 10 chairs arrives. How many hours will it take them to complete these 10 chairs?(The accuracy should be of two digits after the decimal places.)
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,