Production and Operations Analysis, Seventh Edition
7th Edition
ISBN: 9781478623069
Author: Steven Nahmias, Tava Lennon Olsen
Publisher: Waveland Press, Inc.
expand_more
expand_more
format_list_bulleted
Concept explainers
Want to see more full solutions like this?
Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Consider the following two production processes making an electronic component for a navigation system. Both processes consist of 20 stations and operate at a cycletime of 1 minute/unit. Their most error-prone operation is step 9:• Process 1 has a final inspection at the end of the process and has about 300 units of inventory between step 9 and the inspection.• Process 2 has each worker check the work of the previous steps and about 50 units ofinventory between step 9 and the end of the process, roughly equally distributed across theremainder of the process.What would be the information turnaround time for a defect made at station 9?
Before completing production, a product must passthrough three stages of production. On the average, a newproduct begins at stage 1 every 6 minutes. The average timeit takes to process the product at each stage is as follows:stage 1, 3 minutes; stage 2, 2 minutes; stage 3, 1 minute.After finishing at stage 3, the product is inspected (assumethis takes no time). Ten percent of the final products arefound to have a defective part and must return to stage 1 andgo through the entire system again. After completing stage3, 20% of the final products are found to be defective. Theymust return to stage 2 and pass through 2 and 3 again. Onthe average, how many jobs are in the system? Assume thatall interarrival times and service times are exponential andthat each stage consists of a single server.
Consider the following batch-flow process consisting of three process stepsperformed by three machines.
Process steps
step 1
step 2
step 3
processing time
0.25min./unit
0.20 min./unit
0.15 min./unit
setup time
30 min
20 min
45 min
Work is processed in batches at each step. Before a batch is processed at a step, the machine atthat step must be set up. (During a setup, the machine is unable to process any product.) Assumethat there is a dedicated setup operator for each machine (i.e., there is always someone availableto perform a setup at each machine.)a. What is the capacity of step 1 if the batch size is 35 parts?b. For what batch sizes is step 1 (2, 3) the bottleneck?
Chapter 7 Solutions
Production and Operations Analysis, Seventh Edition
Ch. 7.1 - Prob. 1PCh. 7.1 - Prob. 2PCh. 7.1 - Prob. 3PCh. 7.1 - Prob. 4PCh. 7.1 - Prob. 5PCh. 7.1 - Prob. 6PCh. 7.1 - Prob. 7PCh. 7.2 - Prob. 8PCh. 7.2 - Prob. 9PCh. 7.2 - Prob. 10P
Ch. 7.3 - Prob. 11PCh. 7.3 - Prob. 12PCh. 7.3 - Prob. 13PCh. 7.3 - Prob. 14PCh. 7.3 - Prob. 15PCh. 7.3 - Prob. 16PCh. 7.3 - Prob. 18PCh. 7.4 - Prob. 19PCh. 7.4 - Prob. 21PCh. 7.4 - Prob. 22PCh. 7.4 - Prob. 23PCh. 7.5 - Prob. 24PCh. 7.5 - Prob. 25PCh. 7.5 - Prob. 26PCh. 7.5 - Prob. 27PCh. 7.8 - Prob. 28PCh. 7.8 - Prob. 29PCh. 7.8 - Prob. 30PCh. 7.8 - Prob. 32PCh. 7.8 - Prob. 34PCh. 7.8 - Prob. 35PCh. 7.8 - Prob. 36PCh. 7 - Prob. 38APCh. 7 - Prob. 39APCh. 7 - Prob. 40APCh. 7 - Prob. 41APCh. 7 - Prob. 42APCh. 7 - Prob. 43APCh. 7 - Prob. 44APCh. 7 - Prob. 45APCh. 7 - Prob. 46AP
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A catalog order-filling process can be described as follows:12 Telephone orders are taken over a 12-hour period each day. Orders are collected from each person at the end of the day and checked for errors by the supervisor of the phone department, usually the following morning. The supervisor does not send each one-day batch of orders to the data processing department until after 1:00 p.m. In the next step—data processing—orders are invoiced in the one-day batches. Then they are printed and matched back to the original orders. At this point, if the order is from a new customer, it is sent to the person who did the customer verification and setup of new customer accounts. This process must be completed before the order can be invoiced. The next step—order verification and proofreading—occurs after invoicing is completed. The orders, with invoices attached, are given to a person who verifies that all required information is present and correct to permit typesetting. If the verifier has…arrow_forwardH4. A manufacturing process consists of three processes. Step 1 requires 4 minutes per unit, step 2 requires 6 minutes per unit, and step 3 requires 7 minutes per unit. 20% of units that complete the third step require rework, which means those units must start the process over at step 2 (processing times are the same for units being reworked) and rework is always successful. Demand at the shop is 0.4 units per minute. What is the capacity of the shop (in units per minute)?arrow_forwardThere is a manufacturing company that has a dedicated production line to make one specific product. The line has three stations working in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3. The output from station 3 is the finished product. Station 1 can process 500 units per week, station 2 can process 300 units per week, and station 3 can process 400 units per week. illustrates this problem. Question Answer ↓ What is the maximum output number per week?arrow_forward
- A local bakery is renowned for its elaborately cecorated sheet cakes. Consider the following process information: One baker is ivailable to prepare the cake batter (measuring and mixing ingredients and then adding it to baking pans). On average, this takes 10 minutes to prepare two cakes, ie. to make enough batter for 2 cakes and to add the batter to 2 cake pans. Move time to add and remove them from the oven is neglig bile, it takes 32 minutes to bake cakes - the bakery has two ovens, each able to hold 2 cakes. The one pastry chef on staff puts on an amazing show that draws a crowd all day-each cake is decorated in 6 minutes. The bakery operates 8 hours per day. Answer each of the following questions: a. What is the cycle time (in minutes per cake) of each stage - preparing, baking, and decorating? b. What is the dally process capacity? Explain. c. If orders arrive at a rate of 3 cakes every 20 minutes, can the bakery meet the caily demand Explain, Note: Be clear about how you…arrow_forwardJudy’s Cake Shop makes fresh cakes to customer orders. After receiving the order by Judy’s assistant, which takes 2 minutes, Judy then takes 8 minutes tomix the ingredients for the cake and loads a cake pan for baking. Then the cake is put into the oven for 30 minutes. The oven can hold three cakes at one time. When the cake is taken out of the oven, it is cooled for 1 hour. The assistant then takes 2 minutes to pack the cake for pickup and bills the customer, which takes 3 minutes.a. What is the capacity of the process, and what is the bottleneck?b. What is the throughput time for a typical cake?c. If on average five orders are taken per hour, how many cakes are there in the process (on average)?arrow_forward. Consider a four-step serial process with the number of workers at each step and processing times given in the following table.Assuming that the process starts out empty and is worker-paced, how long will it take (in minutes) to serve 20 customers?arrow_forward
- You observe a bank and notice that a customer leaves the bank about every five minutes.These five minutes between customers are:a. the capacity of the process.b. the processing time of the last resource.c. the cycle time.d. the lead timearrow_forwardThe manager of the Personnel Department at City Enterprises has been reading about time-driven ABC and wants to apply it to her department. She has identified four basic activities her employees spend most of the their time on: Interviewing, Hiring, Assessment, and Separation Processing. The department employs 5 staff who perform these activities. The manager provides the following estimates for the amount of time it takes to complete each of these activities: Interviewing: 45 minutes. Hiring: 60 minutes. Assessment: 75 minutes. Separation Processing: 90 minutes. Employees in Personnel work 35-hour weeks with four weeks for vacation. Of the 35 hours, five are reserved for administrative tasks, training, and so on. The costs of the Personnel Department, including any allocated costs from other staff functions, are $972,000. During the year, Personnel conducted 1,200 interviews, made 375 hires, made 3,000 assessments, and had 250 separations. The manager of the Personnel…arrow_forwardCubway, the sandwich shop, is run by Jim, Tim and Kim. When a customer arrives, Jim spends 5 minutes taking order from the customer. After this, Tim prepares bread and Kim prepares filling for the order. These activities are performed in parallel, and take 6 and 12 minutes respectively. Jim then assembles the bread and filling, which takes 4 minutes of his time. Finally, Tim spends 1 minutes in delivering the order and taking payment. What is maximum number of sandwiches Cubway can make per hour? (In other words, what is the capacity of the process in sandwiches per hour?)arrow_forward
- A serial process has 5 steps – A (4), B(5), C(2), D(6), and E(3) – that have to be performed in this order. The numbers in parentheses are the times (in minutes) needed to process a unit. For each unit produced by this process, the process has a total idle time of: Group of answer choices 1 min 10 mins 6 mins 3 minsarrow_forwardA manufacturing company produces 10,000 products per year (50 weeks per year is the available time). The average processing time of each product is 3 weeks. How many products are being processed (on an average) at any given point? What is the average pace of the line (time between two consecutive outputs)?arrow_forward. Consider the following four-step assembly operation with quality problems. Allresources are staffed by one employee.• The first resource has a processing time of 5 minutes per unit.• The second resource has a processing time of 6 minutes per unit.• The third resource has a processing time of 3 minutes per unit. With a 30 percent probability, the flow unit coming out of the third resource has to be reworked. In that case,the operations at the first, second, and third resources are repeated. You can assumethat (a) rework always succeeds (i.e., a unit going through the rework loop will alwayswork after the third resource) and (b) the processing times for units in rework are thesame as for regular units.• The fourth resource has a processing time of 4 minutes per unit.a. Where in the process is the bottleneck?b. What is the capacity of the process?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY