EP PRIN.OF OPERATIONS MGMT.-MYOMLAB
10th Edition
ISBN: 9780134183848
Author: HEIZER
Publisher: PEARSON CO
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7.S, Problem 14P
a)
Summary Introduction
To determine: The bottleneck time of the process.
Introduction:
Bottleneck time:
The bottleneck time is the time of activity in a process which takes the largest amount of time under the given constraints to complete its activity. It will reduce the overall efficiency of the system.
b)
Summary Introduction
To determine: The hourly capacity of the process.
Introduction:
Bottleneck time:
The bottleneck time is the time of activity in a process which takes the largest amount of time under the given constraints to complete its activity. It will reduce the overall efficiency of the system.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Klassen Toy Company, Inc., assembles two parts (parts 1 and 2): Part 1 is first processed at workstation A for 10 minutes per
unit and then processed at workstation B for 15 minutes per unit. Part 2 is simultaneously processed at workstation C for 20
minutes per unit. Work stations B and C feed the parts to an assembler at workstation D, where the two parts are assembled.
The time at workstation D is 10 minutes.
The hourly capacity of the process? (enter your response as a whole number).
3 units
2 units
4 units
6 units
60 units
Natura has to fill 7 orders for its clients. He requires placing the required product in work boxes and subsequently closing them properly so that the product reaches the customer correctly. The process consists of filling the box and later closing it. As the content of each box and the size of these is different, the filling and closing times of each order is different. These times are shown in the table below.
Orders
Place in box (minutes)
Closing Box
(minutes)
1
9
6
2
8
5
3
7
7
4
6
3
5
1
2
6
2
6
7
4
7
a) Find the sequence to complete the orders in the shortest time possible. b) Using a Gantt chart, find the total time in which all orders will be completed using the sequence from part a.
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which
are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel).
2.1 units/hr
Sawing
5 units/hr
Sanding
Drilling
5 units/hr
Welding
2.5 units/hr
a) Sawing is the bottleneck.
b) The bottleneck time is 28.57 minutes per unit (round your response to two decimal places).
c) The throughput time of the overall system is 89.58 minutes (round your response to two decimal places).
Assembly Q
0.8 units/hr
Assembly
0.8 units/hr
Assembly
0.8 units/hr
Chapter 7 Solutions
EP PRIN.OF OPERATIONS MGMT.-MYOMLAB
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - Prob. 4DQCh. 7.S - Prob. 5DQCh. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Prob. 11DQCh. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the post month, the plant in Problem S7.1,...Ch. 7.S - Prob. 3PCh. 7.S - Prob. 4PCh. 7.S - Prob. 5PCh. 7.S - The effective capacity and efficiency for the next...Ch. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Prob. 8PCh. 7.S - Prob. 9PCh. 7.S - Prob. 10PCh. 7.S - The three-station work cell illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Prob. 14PCh. 7.S - 10 minutes per unit. Part 2 is simultaneously...Ch. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Using the data in Problem S7.17: a) What is the...Ch. 7.S - Prob. 19PCh. 7.S - Prob. 20PCh. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - Prob. 26PCh. 7.S - Prob. 27PCh. 7.S - Prob. 32PCh. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Prob. 35PCh. 7.S - Prob. 36PCh. 7.S - Prob. 37PCh. 7.S - Prob. 38PCh. 7.S - Prob. 39PCh. 7.S - Prob. 1VCCh. 7.S - a capacity expansion plan and a new 11-story...Ch. 7.S - a capacity expansion plan and a new 11-story...Ch. 7 - Ethical Dilemma For the sake of efficiency and...Ch. 7 - Prob. 1DQCh. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - Prob. 4DQCh. 7 - Prob. 5DQCh. 7 - Prob. 6DQCh. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Prob. 9DQCh. 7 - Prob. 10DQCh. 7 - Prob. 11DQCh. 7 - Prob. 12DQCh. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Prob. 16DQCh. 7 - Prob. 17DQCh. 7 - Prob. 18DQCh. 7 - Prob. 19DQCh. 7 - Prob. 1PCh. 7 - Usingthedatain Problem 7.1, determinethemost...Ch. 7 - Prob. 3PCh. 7 - Refer to Problem 7.1. If a contract for the second...Ch. 7 - Stan Fawcetts company is considering producing a...Ch. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Prob. 10PCh. 7 - Nagle Electric. Inc., of Lincoln, Nebraska, must...Ch. 7 - Stapleton Manufacturing intends to increase...Ch. 7 - Prepare a flowchart for one of the following: a)...Ch. 7 - Prepare a process chart for one of the activities...Ch. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 1CSCh. 7 - Prob. 2CSCh. 7 - Prob. 3CSCh. 7 - Process Strategy at Wheeled Coach Wheeled Coach,...Ch. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Alaska Airlines: 20-Minute Baggage...Ch. 7 - Prob. 2.2VCCh. 7 - Prob. 2.3VCCh. 7 - Prob. 2.4VCCh. 7 - Prob. 2.5VCCh. 7 - Prob. 3.1VCCh. 7 - Prob. 3.2VCCh. 7 - Prob. 3.3VCCh. 7 - Prob. 3.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Esplanade Marine Parts Inc. wants to produce parts in batches of 60 parts. Each part must be processed sequentially from workstation A to B. Processing Workstation Batch Size (Q) Time per Part 40 seconds A B 60 60 15 seconds a. How many seconds are required to produce the batch under the assumptions of batch processing? Round your answer to the nearest whole number. seconds b. How many seconds are required to produce the batch under the assumptions of single-piece flow processing? Round your answer to the nearest whole number. seconds C. Compare the two solutions in terms of time saved. Round your answer to the nearest whole number. Using the assumptions of -Select- processing saves seconds.arrow_forwardThe following flow chart shows the entire manufacturing process at KD Manufacturing, which consists of six independent operations processes (i.e. sawing, sanding, drilling, reshaping, welding, and assembly). The entire process flow starts with the input of three different parts, Part I, Part II and Part III, each entering a different input line. Three parts meet later for the welding, whichever welding station is available (two identical welding stations work independently). After welding is completed, the product is sent to one of the three assembly stations (which are in parallel). The chart also shows the processing time per unit (in minutes) for each operation. Each of sawing, sanding, drilling and reshaping stations is handled by a different worker. Two workers handle welding, each at one welding station. Another three workers handle the assembly process independently, one at each assembly station. To improve the capacity of the entire manufacturing process, the manager decides to…arrow_forwardCanine Kernels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see the following figure). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product’s price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. CKC can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to working on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operates one 8-hour shift per day or 40 hours/week. The senior management at Canine…arrow_forward
- Canine Kernels Company (CKC) manufactures two differenttypes of dog chew toys (A and B, sold in 1,000-count boxes)that are manufactured and assembled on three differentworkstations (W, X, and Y) using a small-batch process (seeFigure 5.12). Batch setup times are negligible. The flowchartdenotes the path each product follows through the manu-facturing process, and each product’s price, demand perweek, and processing times per unit are indicated as well.Purchased parts and raw materials consumed during pro-duction are represented by inverted triangles. CKC can makeand sell up to the limit of its demand per week; no penaltiesare incurred for not being able to meet all the demand. Eachworkstation is staffed by a worker who is dedicated to workon that workstation alone, and is paid $6 per hour. Totallabor costs per week are fixed. Variable overhead costs are$3,500/week. The plant operates one 8-hour shift per day, or40 hours/week. Which of the three workstations, W, X, or Y,has the highest…arrow_forwardThe Tesla Model S, one of the most sought-after luxury cars, is produced in Tesla’s Freemont factory in California. The production process can be broken up into the following subprocesses. Stamping: In the stamping process, coils of aluminum are unwound, cut into level pieces of sheet metal, and then inserted into stamping presses that shape the metal according to the geometry of the Model S. The presses can shape a sheet of metal in roughly 6 seconds. Subassembly: The various pieces of metal are put together using a combination of joining techniques,including welding and adhesion. This creates the body of the vehicle.Paint: The body of the vehicle is then moved to the paint shop. After painting is completed, the body moves through a 350° oven to cure the paint, followed by a sanding operation that ensures a clean surface. General assembly: After painting, the vehicle body is moved to the final assembly area. Here, assembly workers and assembly robots insert the various subassemblies,…arrow_forwardOf the following process types, ________ has the lowest output variety, and the highest output volume. A) Assembly line B) Batch C) Job shop D) Projectarrow_forward
- A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 1.8 units/hr Sawing 5 units/hr Sanding Drilling 6 units/hr a) Sawing is the bottleneck. b) The bottleneck time is minutes per unit (round your response to two decimal places). Welding 2.2 units/hr Assembly 0.7 units/hr →→Assembly 0.7 units/hr Assembly 0.7 units/hr Qarrow_forwardAn enterprising student has set up an internship clearinghouse for business students. Each student who uses the service fills out a form and lists up to 10 companies that he or she would like to have contacted. The clearinghouse has a choice of two methods to use for processing the forms. The traditional method requires about 20 minutes to reviewthe form and arrange the information in the proper order for processing. Once this setup is done, it takes only two minutes per company requested to complete the processing. The other alternative uses an optical scan/retrieve system, which takes only a minute to prepare but requires five minutes per company for completing the processing. If it costsabout the same amount per minute for processing with either of the two methods, when should each be used? (Answer in Appendix D)arrow_forwardThe Tesla Model S, one of the most sought-after luxury cars, is produced in Tesla’s Freemont factoryin California. The production process can be broken up into the following subprocesses.Stamping: In the stamping process, coils of aluminum are unwound, cut into level pieces of sheetmetal, and then inserted into stamping presses that shape the metal according to the geometry of theModel S. The presses can shape a sheet of metal in roughly 6 seconds.Subassembly: The various pieces of metal are put together using a combination of joining techniques,including welding and adhesion. This creates the body of the vehicle.Paint: The body of the vehicle is then moved to the paint shop. After painting is completed, the bodymoves through a 350° oven to cure the paint, followed by a sanding operation that ensures a cleansurface.General assembly: After painting, the vehicle body is moved to the final assembly area. Here,assembly workers and assembly robots insert the various subassemblies, such as…arrow_forward
- Why is it required to include an exception in the process scheduling?arrow_forwardI already find a. I need help with b Bill's Barbershop has two barbers available to cut customer's hair. Both barbers provide roughly the same experience and skill, but one is just a little bit slower than the other. The process flow below shows that all customers go through steps B1 and B2 and then can be served at either of the two barbers at step B3. The process ends for all customers at step B4. The numbers in parentheses indicate the minutes it takes that activity to process a customer. b. What single activity is the bottleneck for the entire process? B what?arrow_forwardWhat is the impact of waiting time on a production process? Why is waiting time reduced? Will it be really eliminated?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY