MANAGERIAL ACCTG W/MYLAB FDOC
5th Edition
ISBN: 9780136471868
Author: Braun
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 8, Problem 8.43BE
1.
To determine
The operating income of M if it does outsources the manufacturing of the component.
2.
To determine
The maximum price per unit that the M would be willing to pay if it outsources the component.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Classify costs and make a quality-initiative decision (Learning Objective 5) Sinclair Corp. manufactures radiation-shielding glass panels . Suppose Sinclair is consider-ing spending the following amounts on a new TOM program :Strength-testing one item from each batch of panels ......................... . Training employees in TOM ................................................................. . Training suppliers in TOM .................................................................... . Identifying preferred suppliers that commit to on-time delivery ofperfect quality materials ................................................................... .Sinclair expects the new program to save costs through the following:Avoid lost profits from lost sales due to disappointed customers ....... Avoid rework and spoilage ................................................................. .. Avoid inspection of raw materials ........................................................ . Avoid…
Average labor cost for the first 700 units of a product is RO 50 and the average labor cost of first 1400 units is RO 45. Average time per unit is 100 minutes. The learning ratio and the average labour cost for first 2800 units will be:
a.
80% and RO 36.000
b.
90% and RO 40.500
c.
85% and RO 38.250
d.
95% and RO 42.750
Your company has received an order for 20 units of aproduct. Th e labor cost to produce the item is $9.50 per hour. Th esetup cost for the item is $60 and material costs are $25 per unit. Th e item is sold for $92. Th e learning rate is 80 percent. Overheadis assessed at a rate of 55 percent of unit labor cost.(a) Determine the average unit cost for the 20 units if the fi rstunit takes four hours.(b) Determine the minimum number of units that need to bemade before the selling price meets or exceeds the averageunit cost.
Chapter 8 Solutions
MANAGERIAL ACCTG W/MYLAB FDOC
Ch. 8 - Prob. 1QCCh. 8 - (Learning Objective 1) Keys to making short-term...Ch. 8 - (Learning Objective 2) Which is true of...Ch. 8 - (Learning Objective 3) Which of the following...Ch. 8 - Prob. 5QCCh. 8 - Prob. 6QCCh. 8 - (Learning Objective 4) A segment margin is the a....Ch. 8 - (Learning Objective 5) When resources are...Ch. 8 - (Learning Objective 6) Which of the following is...Ch. 8 - Prob. 10QC
Ch. 8 - Determine relevance of information (Learning...Ch. 8 - Prob. 8.2SECh. 8 - Prob. 8.3SECh. 8 - Prob. 8.4SECh. 8 - Prob. 8.5SECh. 8 - Prob. 8.6SECh. 8 - Prob. 8.7SECh. 8 - Prob. 8.8SECh. 8 - Product mix decision: Unlimited demand (Learning...Ch. 8 - Prob. 8.10SECh. 8 - Outsourcing production decision (Learning...Ch. 8 - Relevant information for outsourcing delivery...Ch. 8 - Prob. 8.13SECh. 8 - Prob. 8.14SECh. 8 - Prob. 8.15SECh. 8 - Determine relevant and irrelevant information...Ch. 8 - SUSTAINABILITY ES-17A Sustainability and...Ch. 8 - Prob. 8.18AECh. 8 - Prob. 8.19AECh. 8 - Analyze special order decision (Learning Objective...Ch. 8 - Prob. 8.21AECh. 8 - Prob. 8.22AECh. 8 - Prob. 8.23AECh. 8 - Discontinuing a product line (Learning Objective...Ch. 8 - Prob. 8.25AECh. 8 - Determine product mix for retailertwo stocking...Ch. 8 - Prob. 8.27AECh. 8 - Make-or-buy product component (Learning Objective...Ch. 8 - Prob. 8.29AECh. 8 - Prob. 8.30AECh. 8 - Prob. 8.31AECh. 8 - Prob. 8.32BECh. 8 - Prob. 8.33BECh. 8 - Prob. 8.34BECh. 8 - Prob. 8.35BECh. 8 - Prob. 8.36BECh. 8 - Prob. 8.37BECh. 8 - Prob. 8.38BECh. 8 - Prob. 8.39BECh. 8 - Prob. 8.40BECh. 8 - Identify constraint, then determine product mix...Ch. 8 - Determine product mix for retailertwo stocking...Ch. 8 - Prob. 8.43BECh. 8 - Prob. 8.44BECh. 8 - Prob. 8.45BECh. 8 - Determine maximum outsourcing price (Learning...Ch. 8 - Prob. 8.47BECh. 8 - Prob. 8.48APCh. 8 - Special order decision and considerations...Ch. 8 - Prepare and use contribution margin statements for...Ch. 8 - Product mix decision under constraint (Learning...Ch. 8 - Outsourcing decision given alternative use of...Ch. 8 - Prob. 8.53APCh. 8 - Prob. 8.54BPCh. 8 - Prob. 8.55BPCh. 8 - Prepare and use contribution margin statements for...Ch. 8 - Prob. 8.57BPCh. 8 - Prob. 8.58BPCh. 8 - Prob. 8.59BPCh. 8 - Decide whether to discontinue a department...Ch. 8 - Prob. 8.61ACTCh. 8 - Outsourcing Decision at a Real Company Go to the...Ch. 8 - Prob. 8.63ACTCh. 8 - Prob. 8.64ACT
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Learning curve, cumulative average-time learning model. Northern Defense manufactures radar systems. It has just completed the manufacture of its first newly designed system, RS-32. Manufacturing data for the RS-32 follow: Calculate the total variable costs of producing 2, 4, and 8 units.arrow_forwardC7-73 Calculate breakeven and margin of safety after hotel renovation (Learning Objective 2) Cost-Volume-Profit Analysis 437 This case is a continuation of the Caesars Entertainment Corporation serial case that began in Chapter 1. Refer to the introductory story in chapter 1 (see page 43) for additional background. (The components of the Caesars serial case can be completed in any order.) Caesars Palace® Las Vegas made headlines when it undertook a $75 million renovation. In mid-September 2015, the hotel closed its then-named Roman Tower, which was last updated in 2001, and started a major renovation of the 567 rooms housed in that tower . On January 1, 2016, the newly renamed Julius Tower reopened, replacing the Roman Tower. In addition to renovating the existing rooms and suites in the former Roman Tower, 20 guest rooms were added to the Roman Tower. With the renovation completed, Caesars expects the Julius Tower room rate to average around $149 per night. This increase, a $25 or 20…arrow_forwardBordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On average, the first unit of a new design takes 600 hours. Direct labor is paid 25 per hour. Required: 1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total production of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, cumulative total time in hours, and the time for the last unit. Show results by row for each of units one through eight. (Round answers to two significant digits.)arrow_forward
- Learning CurveBordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On aver-age, the first unit of a new design takes 600 hours. Direct labor is paid $25 per hour. Required:1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total pro-duction of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours,…arrow_forwardProfit Planning and Control This case is a manufacturer and could make specialty bikes, ski or outdoor equipment, computers, food like chocolates, saltwater taffy, cookies, or donuts, etc. Create the balance sheet, income statement, and statement of the cash flow from the following information. Use the following information for the learning experiences Sales volume units = 11,000 Sales price/unit = $100 Variable manufacturing costs/unit = $60 Fixed manufacturing costs = $210,000 Fixed sales & administration costs = $190,000 Business income tax rate = 25% Current assets = $250,000 (Cash $50,000, Accounts Receivables $100,000, Inventory $100,000) Fixed assets = $750,000 Current liabilities = $200,000 (Accounts Payable $100,000, Short Term Debt $100,000) Long Term Debt = $300,000 Owners' Equity = $500,000arrow_forwardTo complete the first setup on a new machine took an employee 100 minutes. Using an 80% incremental unit-time learning model indicates that the second setup on the new machine is expected to take ________. Select one: a. 70 minutes b. 80 minutes c. 120 minutes d. 60 minutesarrow_forward
- FNG Paint (Pty) Ltd produces finger paint and sells them to pre‐schools. The following information relates to a set of finger paint. A set of finger paint is considered to be one unit. Direct labour needed for the first set of paint 4 hoursDirect labour costs per unit R30 per hourDirect material costs per unit R25Total Fixed costs R2 000Learning curve 80% Using the learning curve theory and information provided above, calculate the expected average cost for one set of paint should four and sixteen sets be produced, respectively. Round off to two decimal places.arrow_forwardMANAGEMENT ACCOUNTING & CONTROL STANDARD COSTS AND VARIANCE ANALYSIS LEARNING ACTIVITY 1 Torres Company has established standard costs for the cabinet department, in which one size of MX cabinet is made. The standard costs of producing one of these MX cabinets are shown below: Standard Cost Card – MX Cabinet Direct Material: Lumber 50 board ft at P 4 200 Direct Labor: 8 hours at P 10 80 Overhead Costs: Variable – 8 hrs at P5 40 Fixed – 8 hrs at P3 24 Total Standard Unit Cost 344 During June 2018, 500 of these cabinets were produced. The cost of operations during the month are shown below. There is no work in process at the beginning and end of the month. Direct material purchased: 30,000 bf at P4.10 123,000 Direct materials used: 24,000 board ft Direct labor: 4,200 hrs at P9.50 39,900 Overhead Costs : Variable Costs 22,000 Fixed Costs 11,000…arrow_forwardNUBD Company is planning to introduce a new product with an 80 percent learning rate for production for batches of 1,000 units. The variable labor costs are P30 per unit for the first 1,000-unit batch. Each batch requires 100 hours. There are P10,000 in fixed costs not subject to learning. What is the cumulative total time (labor hours) to produce 16,000 units based on the cumulative average-time learning curve? A. 655.36 hours B. 256 hours C. 160 hours D. 409.6 hoursarrow_forward
- NUBD Company is planning to introduce a new product with an 80 percent learning rate for production for batches of 1,000 units. The variable labor costs are P30 per unit for the first 1,000-unit batch. Each batch requires 100 hours. There are P10,000 in fixed costs not subject to learning. What is the cumulative total time (labor hours) to produce 16,000 units based on the cumulative average-time learning curve? 655.36 hours 256 hours 160 hours 409.6 hoursarrow_forwardThe following information is provided to you: Time taken to produce first 8 shock pads 640 hours Time taken to produce first 16 shock pads 1200 hours Calculate the learning curve The following information is provided to you: Direct labour needed to make first machine. 1000 hoursLearning curve. 80%Direct labour cost. R300 per hourDirect materials cost. R180000 per machine Fixed cost for machines at each cumulative production R800000 Calculate the total direct hours required to manufacture four (4) machines. ( Indicate both average time per unit as well as cumulative time per unit for all theunits) Calculate the total costs to manufacture 4 machinesarrow_forwardThe actual and planned data for Underwater University for the Fall term were as follows: Actual Planned Enrollment 4,500 4,125 Tuition per credit hour $120 $135 Credit hours 60,450 43,200 Registration, records, and marketing costs per enrolled student $275 $275 Instructional costs per credit hour $64 $60 Depreciation on classrooms and equipment $825,600 $825,600 Registration, records, and marketing costs vary by the number of enrolled students, while instructional costs vary by the number of credit hours. Depreciation is a fixed cost. Prepare a variable costing income statement showing the contribution margin and operating income for the Fall term. Underwater University Variable Costing Income Statement For the Fall Term Revenue $ Variable costs: Registration, records, and marketing costs $ Instructional costs Total variable costs $ Contribution margin $ Depreciation on classrooms and equipment Operating income…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Inspection and Quality control in Manufacturing. What is quality inspection?; Author: Educationleaves;https://www.youtube.com/watch?v=Ey4MqC7Kp7g;License: Standard youtube license