Operations Management
2nd Edition
ISBN: 9781260484687
Author: CACHON, Gerard
Publisher: MCGRAW-HILL HIGHER EDUCATION
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 9, Problem 1PA
Summary Introduction
To determine: The outcome variable from the given options.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Yi is fixing up his road bike to prepare for a triathlon. He looks at his tires and wonders how much he should inflate them. Which of the following variables is an outcomevariable?a. The outside temperatureb. The rolling resistancec. The number of times he presses the pumpd. The size of the tire
In the production of pizza, which of the following four variables is not aninput variable?a. The amount of dough prepared for the pizzab. The temperature of the ovenc. The type of cheese on the pizzad. The time that the customer leaves the pizza in the refrigerator
. Mary and Tom operate a lemonade stand. They are concerned that the lemonade doesnot taste fresh at the end of the day. Which of the following variables is an environmental variable in their operation?a. The temperature of the lemonade when they take it out of their refrigerator in themorningb. The temperature of the air during the dayc. The temperature of the lemonaded. The temperature of the water used to make the lemonade
Chapter 9 Solutions
Operations Management
Ch. 9 - Prob. 1CQCh. 9 - Prob. 2CQCh. 9 - Prob. 3CQCh. 9 - Prob. 4CQCh. 9 - Prob. 5CQCh. 9 - Prob. 6CQCh. 9 - Prob. 7CQCh. 9 - Prob. 8CQCh. 9 - Prob. 9CQCh. 9 - Prob. 10CQ
Ch. 9 - Prob. 11CQCh. 9 - Prob. 12CQCh. 9 - Prob. 13CQCh. 9 - Prob. 14CQCh. 9 - Prob. 15CQCh. 9 - Prob. 16CQCh. 9 - Prob. 17CQCh. 9 - Prob. 18CQCh. 9 - Prob. 1PACh. 9 - Prob. 2PACh. 9 - Prob. 3PACh. 9 - Prob. 4PACh. 9 - Prob. 5PACh. 9 - Prob. 6PACh. 9 - Prob. 7PACh. 9 - Prob. 8PACh. 9 - Prob. 9PACh. 9 - Prob. 10PACh. 9 - Prob. 11PACh. 9 - Prob. 12PACh. 9 - Prob. 2.1CCh. 9 - Prob. 2.2C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- At the beginning of each week, a machine is in one of four conditions: 1 = excellent; 2 = good; 3 = average; 4 = bad. The weekly revenue earned by a machine in state 1, 2, 3, or 4 is 100, 90, 50, or 10, respectively. After observing the condition of the machine at the beginning of the week, the company has the option, for a cost of 200, of instantaneously replacing the machine with an excellent machine. The quality of the machine deteriorates over time, as shown in the file P10 41.xlsx. Four maintenance policies are under consideration: Policy 1: Never replace a machine. Policy 2: Immediately replace a bad machine. Policy 3: Immediately replace a bad or average machine. Policy 4: Immediately replace a bad, average, or good machine. Simulate each of these policies for 50 weeks (using at least 250 iterations each) to determine the policy that maximizes expected weekly profit. Assume that the machine at the beginning of week 1 is excellent.arrow_forwardYou are a food specialist in a company that specializes inrefrigerated delicacies, and one of your brands requires beingmaintained at a temperature of 5°C. You determine averagewater activity (aw) at this temperature to be 0.2. One day, you are informed that the cooling systems onone of the delivery trucks carrying your company’s productsmalfunctioned while en route to its destination and it would notbe fixed until the next delivery. The driver has informed you thatthe temperature in the delivery bay of the truck is averaging55°C. You estimate a heat of sorption (Q) of 19 kJ/mol. Calculate the water activity of the brand at this elevatedtemperature and comment on it’s integrity. Should the deliverystill push through? Or should the products be recalled anddisposedarrow_forward28. A local contractor manufactures the speakers used in telephones. The phone com- pany requires the speakers to ring at a specified noise level (in decibels). An X chart is being designed to monitor this variable. The process of sampling speakers from the line requires hitting the speakers with a fixed-force clapper and measur- ing the decibel level on a meter designed for that purpose. The cost of sampling is $1.25 per speaker. When the process goes out of control, the thickness of the speakers is incorrect. The cost of searching for an assignable cause is estimated to be $50. The cost of operating the process in an out-of-control state is estimated to be $180 per hour. Out of control corresponds to a shift of 2ơ in the decibel level, and the probability that the process shifts out of control in any hour is .03. a. The company uses an X chart based on 3ơ limits and subgroups of size 4. What is its hourly cost? b. What are the optimal values of n and k for this process and the…arrow_forward
- 1. Statistical process control, hypothesis testing, and control charts Consumers value prompt service when they order takeout or delivered pizza, and pizza restaurants compete for customers by making time promises. Papa John's, for instance, offers a 10-minute takeout guarantee. Domino's advertises a 30-minute delivery time. Suppose that the quality control manager at a nationwide pizza chain defines this production variable: An order is processed on time or late. Every night, a random sample of pizza orders is selected, and data are collected on the production variable for each order in the sample. To detect a change in the number of orders that are late, the quality control manager uses Based on the control chart, the quality control manager decides that the variation in output is due to assignable causes. Consequently, the manager concludes that the production process is ; it is Statistical procedures for process control use a hypothesis-testing framework. The null and alternative…arrow_forwardThe following data was recorded while observing the increase in the number of butterflies in two different ponds, Pond A and Pond B. Number of Butterflies Present Over 5 Years Year Pond A Pond B 0 50 65 85 1 2 3 4 5 100 O 110 121 133 146 161 110 143 186 What is the rate of growth, r, for each pond and which pond has the fastest average rate of growth over the five years? TA = 1.1, TB = 1.3, mg = 3.72 butterflies/yr TA=0.9, TB=0.8, mg = 3.72 butterflies/yr TA=0.9, TB=0.8, mg=27.2 butterflies/yr TA = 1.1, TB = 1.3, mg=27.2 butterflies/yrarrow_forwardIn a manufacturing process, 10% of the produced units are defective. If the process produces 1000 units per hour, how many defective units are produced in a day (8 hours of operation)?arrow_forward
- While analyzing their annual sales data (liters of wine sold per year) for the past 30 years, a vineyard found that after taking four successive differences, the resulting data had a mean of 2458 liters and looked like a stationary process (e.g. white noise). If the actual data for the past four years were 2018 - 2134 liters, 2017 - 2403 liters, 2016 - 2076 liters, and 2015 - 2290 liters. What would be a reasonable forecast for sales in 2019? Explain.arrow_forwardA manager wanted to predict how much rework time would result from taking a manufacturing line from producing 8 hours a day to 24 hours a day. The manager carefully analyzed three years of performance from manufacturing lines that operated 8 hours a day to make the prediction. The manager is at risk of making what type of error? a Data overfitting error. b Extrapolation beyond the range error. c Outlier error. d Either a type I or type II error.arrow_forwardThe process capability index (Cp) may mislead if: (I) the process is not stable. (II) the process output is not normally distributed. (III) the process is not centered.arrow_forward
- Bill Kime's bowling ball factory makes bowling balls of adult size and weight only. The standard deviation in the weight of a bowling ball produced at the factory is known to be 0.39 pounds. Each day for 24 days, the average weight, in pounds, of 9 of the bowling balls produced that day has been assessed as follows Day 1 2 3 4 5 6 Average (lb) 9.9 9.9 10.1 10.1 99 99 Day 7 8 9 10 11 12 Average (lb) Day Average (b) 13 14 15 16 17 18 10.1 10.0 10.0 10.1 10.1 10.0 9.9 10.1 10.1 10.0 10.1 10.1 Day 19 20 21 22 23 24 Average (lb) 99 10.0 10.1 9.9 10.0 10.0 a) Establish a control chart for monitoring the average weights of the bowling balls in which the upper and lower control limits are each two standard deviations from the mean What are the values of the control limits? Upper Control Limit (UCL)=b (Round your response to two decimal places)arrow_forwardYou are the Green Belt Industrial Engineer in charge of manufacturing process for batteries that have an average voltage output of 12 volts, with production assumed to be normally distributed. You have decided that if a sample of 21 batteries taken from production has a sample average of 11 and sample standard deviation of 1.23, then the production is declared out of control and the line is stopped What is the confidence that your decision is a proper one to take?arrow_forwardSam's Long Life 75-watt light bulbs are designed to have a life of 1,150 hours with tolerances of +205 hours. The process that makes light bulbs has a mean of 1,040 hours, with a standard deviation of 55 hours. Compute the process capability ratio and the process capability index, and comment on the overall capability of the process. (Round answers to 2 decimal places, e.g. 2.75.) Process capability ratio 1355 Process capability index 945 1.24 .057 shorter lived While Cp = bulbs will be generated. indicates the process саpable, Cpk D indicates thatarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,