Operations Management
13th Edition
ISBN: 9781259667473
Author: William J Stevenson
Publisher: McGraw-Hill Education
expand_more
expand_more
format_list_bulleted
Textbook Question
thumb_up100%
Chapter 10, Problem 18P
A production process consists of a three-step operation. The scrap rate is 10 percent for the first step and 6 percent for the ether two steps
a. If the dewed duly output IS 450 units, how many units must be started to allow for loss due to scrap?
b. If the scrap rate for each step could be cut in half how many units would this save in terms of the scrap allowance?
C. If the scrap represents a cost of $10 per unit how much is it costing the company per day for the original scrap rate?
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A production process consists of a three-step operation. The scrap rate is 10 percent for the firststep and 6 percent for the other two steps.a. If the desired daily output is 450 units, how many units must be started to allow for loss due toscrap?b. If the scrap rate for each step could be cut in half, how many units would this save in terms ofthe scrap allowance?c. If the scrap represents a cost of $10 per unit, how much is it costing the company per day forthe original scrap rate?
A production process consists of a three-step operation. The scrap rate is 10 percent for the firststep and 6 percent for the other two steps.a. If the desired daily output is 450 units, how many units must be started to allow for loss due toscrap?
A production process consists of a three-step operation. The scrap rate is 14 percent for the first step and 8 percent for the other two steps.
a. If the desired daily output is 492 units, how many units must be started to allow for loss due to scrap? (Do not round intermediate calculations. Round up your final answer to the next whole number.)
b. If the scrap rate for each step could be cut in half at every operation, how many units would this save in terms of the scrap allowance? (Do not round intermediate calculations. Round up your final answer to the next whole number.)
c. If the scrap represents a cost of $10 per unit, how much is it costing the company per day for the original scrap rate (i.e. the Part a scrap rate)? (Round your final answer to the nearest whole number.)
Chapter 10 Solutions
Operations Management
Ch. 10.2 - A potato chip is a delicate thing Fragile A pound...Ch. 10.2 - A potato chip is a delicate thing Fragile A pound...Ch. 10.5 - It's estimated that more than 7 000 hospital...Ch. 10.5 - It's estimated that more than 7 000 hospital...Ch. 10 - Prob. 1DRQCh. 10 - Prob. 2DRQCh. 10 - Prob. 3DRQCh. 10 - Prob. 4DRQCh. 10 - Prob. 5DRQCh. 10 - Prob. 6DRQ
Ch. 10 - Prob. 7DRQCh. 10 - Prob. 8DRQCh. 10 - Prob. 9DRQCh. 10 - Prob. 10DRQCh. 10 - Prob. 11DRQCh. 10 - Prob. 12DRQCh. 10 - Prob. 13DRQCh. 10 - Prob. 14DRQCh. 10 - Prob. 15DRQCh. 10 - Prob. 16DRQCh. 10 - Prob. 1TSCh. 10 - Prob. 2TSCh. 10 - Prob. 3TSCh. 10 - Prob. 1CTECh. 10 - Prob. 2CTECh. 10 - Prob. 3CTECh. 10 - Prob. 4CTECh. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - A production process consists of a three-step...Ch. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Prob. 23PCh. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 1.1CQCh. 10 - Prob. 2.1CQCh. 10 - Prob. 2.2CQCh. 10 - Prob. 2.3CQCh. 10 - Prob. 2.4CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Consider the following two-step process. Step 1 takes 10 minutes per unit and hasan 80 percent yield. Step 2 takes 15 minutes per unit and has a 60 percent yield. Where inthe process is the bottleneck? How many good units can the process produce?arrow_forward. Baskin-Robbins (BR) has a line that produces half-gallon ice cream packs. All the stations inthis line are single-machine and the line is nearly balanced. Suppose that BR hired you as theproduction manager to evaluate the performance of the line. You have estimated that thebottleneck rate to be 2,337 packs per 19-hour day and the raw process time to be 30 minutes.The actual production rate of this line is 1,900 packs per day with the average cycle time of 2.9hours.(a) Estimate the average WIP for this line:WIP: ______________(b) Compare the performance of this line to the minimum expected performance:THMEP : ______________ CT MEP: ______________arrow_forwardA manufacturing plant has the process displayed below. The drilling operation occurs separately from and simultaneously with the sawing and sanding operations. The product only needs to go through one of the three one of the three assembly operations (the assembly operations are ‘parallel’). a) What is the bottleneck operation? b) What is the throughput time for the overall system? c) If the firm operates 10 hours a day, 21 days a month, what is the monthly and yearly capacity of the manufacturing process? d) Supposed that a second drilling machine is added, and it takes the same time as the original drilling machine. What is the new bottleneck time of the system? e) What is the new throughput time if the second drilling machine is added?arrow_forward
- A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). A) is the bottleneck. b) The bottleneck time isminutes per unit (round your response to two decimal places). c) The throughput time of the overall system is enter your response here minutes (round your response to two decimal places). D) If the firm operates 8 hours per day, 20 days per month, the monthly capacity of the manufacturing process isunits (enter your response as a whole number).arrow_forwardI already find a. I need help with b Bill's Barbershop has two barbers available to cut customer's hair. Both barbers provide roughly the same experience and skill, but one is just a little bit slower than the other. The process flow below shows that all customers go through steps B1 and B2 and then can be served at either of the two barbers at step B3. The process ends for all customers at step B4. The numbers in parentheses indicate the minutes it takes that activity to process a customer. b. What single activity is the bottleneck for the entire process? B what?arrow_forwardExplain what are the risks of automating a production process and what are the risks for a service process?arrow_forward
- The following processes - Tameka, Tamia, and Christian - have the following cost structure: Show all work in Excel with formulas Process Fixed Cost per Year Variable Cost per Unit Tameka $120,000 $3.00 Tamia 90,000 4.00 Christian 80,000 4.50 a. What is the most economical process for a volume of 8,000 units? b. How many units per year must be sold with each process to have annual profits of $50,000 if the selling price is $6.95 per unit? c. What is the break-even volume for each process?arrow_forwardMikey W. Smitty is confident that demand for his “WesternRap” CD will substantially exceed the break-even point computed in Problem 6-3. So, Mikey is contemplating hav-ing his CD cut at a classier (and pricier) studio. The cost to record the CD would rise to $9000. However, since thisnew studio works with very high volume, production costswould fall to $2 per CD.a. What is the breakeven point for this new process?b. Compare this process to the process proposed in theprevious problem. For what volume of demand shouldMikey choose the classier studio?arrow_forwardThe break-even point is:a) adding processes to meet the point of changing productdemands.b) improving processes to increase throughput.c) the point in dollars or units at which cost equals revenue.d) adding or removing capacity to meet demand.e) the total cost of a process alternative.arrow_forward
- Bill builds benches in a small shop and he plans to operate five 8-hour days perweek. Each bench has two ends and a top. It takes 5 minutes to cut and sand eachend and 2 minutes to make each top. Assembly requires 8 minutes per bench, andpainting requires 5 minutes per bench. Bill has one employee who makes the topsand ends. Bill will do the final assembly and painting. He also plans 1 hour per dayfor setup and teardown for each department.a. How many benches should he plan to build per week?b. How many hours per week are required for each person?c. Suggest ways to increase the number of benches produced per weekarrow_forwardBryan is Professor Russell’s graduate assistant. He wouldlike to leave for Spring Break tomorrow, but first he has tograde the midterm exams from four classes. These classesare new for Bryan, so he estimates his grading efficiency tobe 80%. Professor Russell has estimated the time requiredto create the key and the time to grade each paper as shownbelow. Bryan anticipates that he’ll need five hours of sleep,an hour to pack, an hour to get to the airport, an hour topost the grades, and three twenty minute breaks during theday for meals. Can Bryan finish his work and make it tothe airport on time in a 24 hour day?arrow_forwardA) Which step in this process is the bottleneck? =30 min for tan leather B) How many briefcases are processed at the bottleneck workstation per hour?=60/30=2 briefcases per hr C) What is the throughput time of the overall process?=30+15+10+10+10 Throughput = 75 minutes given the above information please answer qestions 1-3 below. If the manufacturing facility operates 8 hours per day, 250 days a year, what is the annual capacity of this manufacturing process. Assume the company decides to hire additional workers in order to duplicate the bottleneck step identified in part a so that there are 3 of these workstations instead of 1. Redraw the diagram showing the flow of the revised process. Answer parts a through d again based on the new process created in part e?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Process selection and facility layout; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=wjxS79880MM;License: Standard YouTube License, CC-BY