Chapter 14, Problem 26P
Summary Introduction
To develop: A net requirements plan for the Rustic Coffee table.
Introduction:
Net requirements plan:
The net requirements plan is the plan, which is established on the gross requirements plan formed by deducting the stock on and the
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Your company assembles five different models of a motor scooter that is sold in specialty stores in the United States. The company uses the same engine for all five models. You have been given the assignment of choosing a supplier for these engines for the coming year. Due to the size of your warehouse and other administrative restrictions, you must order the engines in lot sizes of 1,200 units. Because of the unique characteristics of the engine, special tooling is needed during the manufacturing process for which you agree to reimburse the supplier. Your assistant has obtained quotes from two reliable engine suppliers, and you need to decide which to use, the following data have been collected.
Requirements (annual forecast) 14,400 units
Weight per engine 25 pounds
Order processing cost $ 145 per order
Inventory carry cost 20% of the avg. Value of inventory per year…
Your company assembles five different models of a motor scooter that is sold in specialty stores in the United States. The company uses the same engine for all five models. You have been given the assignment of choosing a supplier for these engines for the coming year. Due to the size of your warehouse and other administrative restrictions, you must order the engines in lot sizes of 1,000 each. Because of the unique characteristics of the engine, special tooling is needed during the manufacturing process for which you agree to reimburse the supplier. Your assistant has obtained quotes from two reliable engine suppliers and you need to decide which to use. The following data have been collected:
Requirements (annual forecast)
12,000
units
Weight per engine
22
pounds
Order processing cost
$125
per order
Inventory carry cost
20
percent of the average value of inventory per year
Note: Assume that half of the lot size is in inventory, on average (1,000 ÷ 2 = 500 units).
Two…
Demand for a power steering gear assembly is given by
Period
1
2
3
4
5
6
7
8
9
10
Gear
14
12
12
13
5
90
20
20
20
20
Currently there are 50 parts on hand. The lot-sizing rule is, again, fixed order period using two periods. Lead time is three periods.
Determine the planned order release schedule for the gear.
Suppose each gear assembly requires two pinions. Currently there are 100 pinions on hand, the lot-sizing rule is lot-for-lot, and the lead time is one period. Determine the gross requirement and then the planned order release schedule for pinions.
Chapter 14 Solutions
Operations Management, Student Value Edition & Student Cd For Operations Management
Ch. 14 - What is the difference between a gross...Ch. 14 - Prob. 2DQCh. 14 - What are the similarities between MRP and DRP?Ch. 14 - How does MRP II differ from MRP?Ch. 14 - Which is the best lot-sizing policy for...Ch. 14 - What impact does ignoring carrying cost in the...Ch. 14 - MRP is more than an inventory system; what...Ch. 14 - What are the options for the production planner...Ch. 14 - Master schedules are expressed in three different...Ch. 14 - What functions of the firm affect an MRP system?...
Ch. 14 - Prob. 11DQCh. 14 - Identify five specific requirements of an...Ch. 14 - What are the typical benefits of ERP?Ch. 14 - What are the distinctions between MRP, DRP, and...Ch. 14 - As an approach to inventory management, how does...Ch. 14 - What are the disadvantages of ERP?Ch. 14 - Use the Web or other sources to: a. Find stories...Ch. 14 - Prob. 18DQCh. 14 - Use the Web or other sources to identify what an...Ch. 14 - You have developed the following simple product...Ch. 14 - You are expected to have the gift bags in Problem...Ch. 14 - The demand for subassembly S is 100 units in week...Ch. 14 - Using the information in Problem 14.3, construct a...Ch. 14 - Using the information in Problem 14.3, construct a...Ch. 14 - Refer again to Problems 14.3 and 14.4. In addition...Ch. 14 - Refer again to Problems 14.3 and 14.5. In addition...Ch. 14 - As the production planner for Scott Sampson...Ch. 14 - Prob. 9PCh. 14 - a. Given the product structure and master...Ch. 14 - Prob. 11PCh. 14 - Based on the data in Figure 14.13, complete a net...Ch. 14 - Prob. 13PCh. 14 - A part structure, lead time (weeks), and on-hand...Ch. 14 - You are product planner for product A (in Problem...Ch. 14 - Prob. 16PCh. 14 - Data Table for Problems 14.17 through 14.20 14.17...Ch. 14 - Develop an EOQ solution and calculate total...Ch. 14 - Develop a POQ solution and calculate total...Ch. 14 - Using your answers for the lot sizes computed in...Ch. 14 - Prob. 21PCh. 14 - Grace Greenberg, production planner for Science...Ch. 14 - Karl Knapps, Inc., has received the following...Ch. 14 - Coleman Rich, Ltd., has received the following...Ch. 14 - Prob. 25PCh. 14 - Prob. 26PCh. 14 - Using the data for the coffee table in Problem...Ch. 14 - When 18,500 Orlando Magic Fans Come to Dinner...Ch. 14 - When 18,500 Orlando Magic Fans Come to Dinner...Ch. 14 - When 18,500 Orlando Magic Fans Come to Dinner...Ch. 14 - MRP at Wheeled Coach Video Case Wheeled Coach, the...Ch. 14 - MRP at Wheeled Coach Video Case Wheeled Coach, the...Ch. 14 - MRP at Wheeled Coach Video Case Wheeled Coach, the...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Courtney Kamauf schedules production of a popular Rustic Coffee Table at Kamauf Enterprises, Inc. The tablerequires a top, four legs, 18 gallon of stain, 116 gallon of glue, 2 shortbraces between the legs and 2 long braces between the legs, anda brass cap that goes on the bottom of each leg. She has 100 gallons of glue in inventory, but none of the other components. Allitems except the brass caps, stain, and glue are ordered on a lotfor-lot basis. The caps are purchased in quantities of 1,000, stainand glue by the gallon. Lead time is 1 day for each item. Schedulethe order releases necessary to produce 640 coffee tables on days5 and 6, and 128 on days 7 and 8.arrow_forwardUse the Wagner–Whitin and Silver–Meal methods to find production schedules for the following dynamic lot-size problem: K $30, h $1, d1 40, d2 60, d3 10, d4 70, d5 20.arrow_forwardCan the optimal stocking level in the single-period model ever be less than expected demand?Explain briefly.arrow_forward
- Please help me solve this table. Rockit Electronics manufactures a line of digital blue ray players. The player is made from one subassembly of B and one subassembly of C. B is made of three units of D and two of E. C is made of two units of F and two of E.The blue ray has a lead time of one week. B, C, and E have lead times of two weeks, and D and F have lead times of three weeks.As the production manager, you need to figure out the MRP planning schedule. 1. What is the bill of materials (product structure tree)?2. If 1,000 units of blue ray players are required in week 10, what is the MRP schedule? Specifically, when items are to be ordered and received. Assume we have no units of inventory on hand.arrow_forwardRefer to the data in Problem 6, If backorders are allowed, Costs Productiondetermine the total cost of a plan if overtime is limited to Regular Time $ 40.00 per unit Regular 60040 units per month and subcontracting is limited to Overtime $ 60.00 per unit Overtime 4020 units per month. Backordering costs are $30 per unit. Subcontracting $ 80.00 per unit Subcontracting 20Holding $ 10.00 per unit per monthBack Order $ 30.00 per unitMonth Forecast1 5702 6003 6304 6505 6706 690Totalsarrow_forwardTrue or false. Economic order quantity analysis mathematically determines the optimal allocation of resources to activates.arrow_forward
- A firm has the following gross requirements for Item F. If ordering costs are $60 per order and carrying costs are $0.50 per period. If Mult. 60 lot sizing is used, the planned order releases is Group of answer choices 60 in period 2 and 80 in period 3 120 in period 2 and 60 in period 3 80 in period 1 and 0 in period 3 0 in period 1 and 40 in period 3arrow_forwardTuff-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and component combinations. Identical bicycles are produced in lots of 90. The projected demand, lot size, and time standards are shown in the following table: LOADING... Item Touring Mountain Demand forecast 4,000 units/year 12,000 units/year Lot size 110 units 90 units Standard processing time 0.30 hour/unit 0.75 hour/unit Standard setup time 2 hours/lot 3 hours/lot The shop currently works 8 hours a day, 5 days a week, 50 weeks a year. It operates five workstations, each producing one bicycle in the time shown in the table. The shop maintains a 15 percent capacity cushion. How many workstations will be required next year to meet expected demand without using overtime and without decreasing…arrow_forwardThe El Dorado Star is the only newspaper in El Dorado, New Mexico. Certainly, the Star competes with The Wall Street Journal, USA Today, and the New York Times for national news reporting, but the Star offers readers stories of local interest, such as local news, weather, high-school sporting events, and so on. The El Dorado Star faces the revenue and cost schedules shown in the spreadsheet that follows: A template for the spreadsheet is provided in the Course Materials. You may download my template or create your own. Since we are using dollars and cents, be sure to go out two decimal places on your calculations. Add columns to show, respectively, marginal cost (MC), marginal revenue (MR), and total profit. 1. Dell Computer Corp., the world's largest personal-computer maker, is keenly aware of everything its rival PC manufacturers decide to do. Explain why Dell usually reacts more quickly and more substantially to pricing, product design, and advertising decisions made by…arrow_forward
- A single inventory item is ordered from an outside supplier. The anticipateddemand for this item over the next 12 months is 6, 12, 4, 8, 15, 25, 20, 5, 10, 20, 5,12. Current inventory of this item is 4, and ending inventory should be 8. Assume aholding cost of $1 per period and a setup cost of $40. Determine the order policyfor this item based onc. Part period balancingarrow_forwardProblem 6 Part A:Available to promise in period 4 = 50Problem 6 Part B:PAB in period 7 = 35 In part A, the only thing that you need to do is to calculate the ATP in periods 1,4,5, and 7. In part B, remember that you are rolling through time. The part B solution spreadsheet starts with time period 2 and period 1 is now history. For the part B, you must capture all of the events that occurred during week 1. For example, I gave you that the beginning PAB is 45. If you had 20 in stock (from part A), you produced 50 as planned in period 1, and the actual demand for period 1 was 25, then the beginning PAB (your stock quantity) is 20+50-25=45. The forecast and MPS quantities will not change from part A to part B. After you accept each of the orders (simply add the new order quantities to the existing customer order quantities in the correct time bucket), you will then recalculate the PAB, and then recalculate the ATP.arrow_forwardIrvine Consolidated Closets (ICC) builds and sells shelving for homes and offices. For a certain shelving unit, SS1, ICC has gross requirements of 500, 800, and 650 units in weeks 4, 5, and 6, respectively. The lead-time on the SS1 shelving unit is two weeks. ICC currently has 600 of the SS1 on hand and this product is ordered in lot sizes of 300, that is, the order in multiples of 300. Determine the MRP schedule for the SS1 unit over a time frame of weeks 1 through 6. When and for how many units should ICC place their orders for the SS1? A key component of the SS1 is the TT2. Each SS1 contains four TT2s. Currently TT2’s are ordered in lots of size 1000 and there are 800 on hand. TT2s have a one-week lead time. Determine the MRP schedule for the TT2 unit over a time frame of weeks 1 through 6. When and for how many units should ICC place their orders for the TT2? Suppose annual demand for the SS1 shelving unit is 32,500. ICC’s holding cost is $0.50 per week for each SS1…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY