a)

Summary Introduction

To decide: What actions to be taken immediately, in case 1,000 finished lamps are required in week 5 and 1,500 finished lamps are required in week 6, given the “parts explosion”, the inventory on hand of finished lamps and parts and lead times as shown below.

b)

Summary Introduction

To calculate the total assembly time required, given that it takes 15 minutes to assemble the parts into the frame and 5 minutes to assemble the shade and frame into a finished lamp.

c)

Summary Introduction

To find out the changes in the material plan, if the lead time of assembly of lamps is extended from one week to two weeks.

Blurred answer
Students have asked these similar questions
A partially completed inventory record for the motor sub-assembly is shown in Figure 11.39. a. Complete the last three rows of the record by using the L4L rule. b. Complete the last three rows of the record by using the POQ rule with P = 2. c. Complete the last three rows of the record by using the POQ rule with P = 2. d. If it costs the company $1 to hold a unit in inventory from one week to the next, and the cost to release an order is $50, which of the lot sizing rules used above will provide the lowest inventory holding + order release cost?
As the production planner for Xiangling Hu​ Products, Inc., you have been given a bill of material for a bracket that is made up of a​ base, 2 ​springs, and 4 clamps. The base is assembled from 1 clamp and 2housings. Each clamp has 1 handle and 1 casting. Each housing has 2 bearings and 1 shaft. There is no inventory on hand. Your boss at Xiangling Hu​ Products, Inc., has just provided you with the schedule and lead times for the bracket. The unit is to be prepared in week 12.The lead times for the components are bracket​ (1 week), base​ (1 week), spring​ (1 week), clamp​ (1 week), housing ​(3​weeks), handle ​(2weeks​), casting ​(4​weeks), bearing​ (1 week), and shaft​ (1 week). Part 3 b) In what week do you need to start the​ castings?   The castings need to be started in week enter your response here ​(enter your response as a whole number​).
A partially completed inventory record for the motor sub-assembly is shown in Figure 11.39.a. Complete the last three rows of the record by using theL4L rule.b. Complete the last three rows of the record by using thePOQ rule with P = 2. c. Complete the last three rows of the record by using thePOQ rule with P = 2.d. If it costs the company $1 to hold a unit in inventory fromone week to the next, and the cost to release an order is$50, which of the lot sizing rules used above will providethe lowest inventory holding + order release cost?
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY