Operations Management
17th Edition
ISBN: 9781259142208
Author: CACHON, Gérard, Terwiesch, Christian
Publisher: Mcgraw-hill Education,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 16, Problem 2PA
Summary Introduction
To determine: How long the client should wait to satisfied the demand.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A manufacturing facility stores spare parts for maintenance in a storage facility. Throughout theworking day, manufacturing personnel go to the storage facility to pick up supplies needed for theirjobs. The storage facility employees receive a request for supplies, on average, every five minutes fromthe manufacturing personnel. The average request requires 3.2 minutes to fill a request. Manufacturingpersonnel are paid $29.50 per hour and storage facility employees are paid $18.75 per hour. The storagefacility operates 8 hours per day. Base your costs on an 8-hour workday, the given arrival and servicerates, and the fact that when the manufacturing personnel are at the storage site picking up parts – theyare unable to complete their normal job in manufacturing.a) What is the system cost per day (to the nearest $) if there is only 1 storage facility employeeworking?b) What is the system cost per day (to the nearest $) if there are 2 storage facility employeesworking?c) What is the system…
A make-to-order system is well described as a basic Erlang system with a single machine. The manager of the system wants to ensure that the expected turnaround time of any order (from its placement until its shipment to the customer), in days, is T. If orders arrive at a rate λ per day, derive an expression that prescribes the machine’s capacity (µ) as a function of T and λ . (Capacity is defined as the number of orders the machine can handle per day.) What happens to the required capacity when T is decreased to 0?
Laredo Leather Company’s production manager, Jack Murray, has been under pressure from the company president to reduce the cost of conversion. In spite of several attempts to reduce conversion costs, they have remained more or less constant. Now Murray is faced with an upcoming meeting with the company president, at which he will have to explain why he has failed to reduce conversion costs. Murray has approached his friend, Jeff Daley, who is the corporate controller, with the following request: “Jeff, I’m under pressure to reduce costs in the production process. There is no way to reduce material cost, so I’ve got to get the conversion costs down. If I can show just a little progress in next week’s meeting with the president, then I can buy a little time to try some other cost-cutting measures I’ve been considering. I want you to do me a favor. If we raise the estimate of the percentage of completion of October’s inventory to 60 percent, that will increase the number of equivalent…
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- CPU-on-Demand (CPUD) offers real-time high-performance computing services. CPUD owns 1 supercomputer that can be accessed through the Internet. Their customers send jobs that arrive, on average, every 4 hours. The standard deviation of the interarrival times is 4 hours. Executing each job takes, on average, 3 hours on the supercomputer and the standard deviation of the processing time is 3.6 hours. On average, how long will it take to complete a job (from the time it is submitted by the customer until the time it is completed)?arrow_forward. For the MyMy1 queueing model, why do the following results hold? (Hint: Remember that 1ym is the meanservice time. Then think how long a typical arrival must wait in the system or in the queue.) a. W 5 (L 1 1)ym b. WQ 5 Lymarrow_forwardPlease do not give solution in image formate thanku. The manager of the Safeway store (close to Santa Clara University) is considering improving the customer service level by reducing customers’ average waiting time for checkout. Based on the past year’s data, he knows that customers try to check out every 2 minutes, on average, and the standard deviation of the interarrival time is also 2 minutes. It takes on average 3 minutes to finish the checkout process. The standard deviation of the processing times is 3 minutes. The manager’s goal is to make sure the customers’ average waiting time is less than 0.5 minute. How many checkout cashiers should the manager use?arrow_forward
- A small shoe manufacturer makes two styles of shoes: oxfords and loafers. Two machines are used in the process: a cutting machine and a sewing machine. Each type of shoe requires 15 min per pair on the cutting machine. Oxfords require 10 min of sewing per pair, and loafers require 20 min of sewing per pair. Because the manufacturer can hire only one operator for each machine, each process is available for just 8 hours a day. Set up a system of linear inequalities that describes the number of pairs of each style of shoes that the manufacturer can produce within required working hours.arrow_forwardCalls arrive at Lynn Ann Fish's hotel switchboard at a rate of 2.0 per minute. The average time to handle each is 15 seconds. There is only one switchboard operator at the current time. The Poisson and negative exponential distributions appear to be relevant in this situation. The probability that the operator is busy = 0.500.50 (round your response to two decimal places).The average time that a caller must wait before reaching the operator = 0.250.25 minutes (round your response to two decimal places). c) The average number of calls waiting to be answered = calls (round your response to two decimal places).arrow_forwardIn the PMT function, what is not true about the Num_periods argument? Group of answer choices It reflects a count of how many times payments will be made. It can contain references to fields. You must use constants for this argument. It is required.arrow_forward
- Solve the question below using the attached excel templates with formulas for renting both slow and fast copies (labeled in the excel tabs). Question: The Decision Sciences Department is trying to determine whether to rent a slow or a fast copier. The department believes that an employee’s time is worth $15 per hour. The slow copier rents for $4 per hour, and it takes an employee an average of 10 minutes to complete copying. The fast copier rents for $15 per hour, and it takes an employee an average of six minutes to complete copying. On average, four employees per hour need to use the copying machine. (Assume the copying times and interarrival times to the copying machine are exponentially distributed.) Which machine should the department rent to minimize expected total cost per hour?arrow_forwardRead and answer the following questionarrow_forwardBased on Jacobs (1954). The Carter Caterer Company must have the following number of clean napkins available at the beginning of each of the next four days: day 1, 1500; day 2, 1200; day 3, 1800; day 4, 600. After being used, a napkin can be cleaned by one of two methods: fast service or slow service. Fast service costs 50 cents per napkin, and a napkin cleaned via fast service is available for use the day after it is last used. Slow service costs 30 cents per napkin, and these napkins can be reused two days after they are last used. New napkins can be purchased for a cost of 95 cents per napkin. Determine how to minimize the cost of meeting the demand for napkins during the next four days. (Note: There are at least two possible modeling approaches, one network and one nonnetwork. See if you can model it each way.)arrow_forward
- Use duality to answer the following application.The Enormous State University's Business School is buying computers. The school has two models to choose from, the Pomegranate and the iZac. Each Pomegranate comes with 400 GB of memory and 80 TB of disk space, while each iZac has 300 GB of memory and 100 TB of disk space. For reasons related to its accreditation, the school would like to be able to say that it has a total of at least 48,000 GB of memory and at least 12,000 TB of disk space. What are the shadow costs of memory and disk space? memory $ per GB disk space $ per TBarrow_forwardA server operates with 70% utilization. The coefficient of variation for the service process is 0.6 and the coefficient of variation of the arrival process is 1. The average processing time is 3 minutes. What is the average time a customer spends in the system according to the single-server queue model? A. 9 minutes B. 6 minutes C. 3 minutes D. 7.5 minutes Consider an Erlang loss system. The average processing time is 6 minutes. The average interarrival time is 3 minutes. The number of servers is 9. What is the capacity of the system? A. 0.8 customers per minute B. 1.5 customers per minute C. 1.1 customers per minute D. 2.4 customers per minutearrow_forwardA toy manufacturer uses 51,920 rubber wheels per year for its popular dump truck series. The firm makes its own wheels, which it can produce at a rate of 800 per day. The toy trucks are assembled uniformly over the entire year. Carrying cost is $1.30 per wheel per year. Setup cost for a production run is $44. The firm operates 236 days per year. Determine the following: a. Optimal run size (Round your answer to a whole number, following normal rules of rounding.) b. Use your final answer from part a to determine minimum total annual cost for carrying and setup. (Round your answer to a whole number.) c. Cycle time for the optimal run size (Round your answer to two decimal points.) d. Run time (Round your answer to two decimal points.)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,