A suitable depth of the asphalt pavement using the AASHTO method.

Blurred answer
Students have asked these similar questions
A section of a two-lane rural highway is to be realigned and replaced by a four-lane highway with a full-depth asphalt pavement. The AADT (both ways) on the existing section can be represented by 750 ESAL. It is expected that construction will be completed 5 years from now. If the traffic growth rate is 2 percent and the effective CBR of the subgrade on the new alignment is 9.0, determine a suitable depth of the asphalt pavement (in inches) using the AASHTO method. Take the design life of the pavement as 20 years. The resilient modulus of the asphalt (EAC) is 450,000 lb/in.2. Assume mi for the subgrade is 1 and the percent of traffic on the design lane is 45 percent. Use a reliability level of 90 percent, a standard deviation of 0.45, and a design serviceability loss of 2.0.
section of a two-lane rural highway is to be realigned and replaced by a four-lane highway with a full-depth asphalt pavement. Consists of 40% trucks. If classification studies have shown that the truck factor can be taken as 0.45, design a suitable flexible pavement using the 1993 AASHTO procedure if the AADT on the design lane during the first year of operation is 1000. It is expected that construction will be completed five years from now, and pi =4.5 and pt = 2.5. Growth rate = 4%. Design life = 20 years. The pavement structure will be exposed to moisture levels approaching saturation 20% of the time, and it will take about one week for drainage of water. Effective CBR of the subgrade material is 7. CBR of the base and subbase are 70 (Mr=30000 lb/in2 ) and 22 (Mr=13500 lb/in2 ), respectively, and Mr for the asphalt mixture, 400,000 lb/in2 .
In one road project , for rehabilitation existing pavement by overlay technique , the effective structural number of existing pavement ( SNeff may be determined in two ways , NDT and condition survey . If the NDT value is 4.89 and the value of the condition estimation is 5.25 , the SNeff will be *
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning