OPERATIONS MANAGEMENT LL W/CONNECT CODE
2nd Edition
ISBN: 9781266520037
Author: CACHON
Publisher: MCG CUSTOM
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 4, Problem 11CQ
Which of the following actions does not relate to off-loading the bottleneck?
- a. Reassigning activities to other, nonbottleneck resources
- b. Automating some of the activities at the bottleneck
- c. Increasing wages for production workers
- d. Outsourcing some of the bottleneck activities
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
O the analyst should repeat the analysis process to look for other bottlenecks.
the analyst should identify bottlenecks, idle times and non value added steps
O the analyst should consider making investments to improve either how the bottleneck process works or to increase its
O
the analyst should consider increasing the output of the bottleneck and removing any non-value adding work or inter
bottleneck
Question 9
Which one of the following is NOT a reason to focus on sustainability?
O Investors demand it
Reduce net-zero emissions by 2030 or 2050
O Gen Z demand it
O Profit and productivity targets
O Process control targets
Question 10
Which of the following process type has the highest level of volume?
Draw a Functional Decomposition Diagram that would represent key processes of the system.
Draw a Diagram 0 Data Flow Diagram of the system.
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which
are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel).
Q
2.1 units/hr
Sawing
5 units/hr
Sanding
Drilling
5 units/hr
Welding
2.5 units/hr
a) Sawing is the bottleneck.
b) The bottleneck time is 28.57 minutes per unit (round your response to two decimal places).
c) The throughput time of the overall system is minutes (round your response to two decimal places).
Assembly
0.8 units/hr
Assembly
0.8 units/hr
Assembly
0.8 units/hr
Chapter 4 Solutions
OPERATIONS MANAGEMENT LL W/CONNECT CODE
Ch. 4 - Prob. 1CQCh. 4 - Prob. 2CQCh. 4 - Prob. 3CQCh. 4 - Prob. 4CQCh. 4 - Prob. 5CQCh. 4 - Which of the following statements about takt time...Ch. 4 - Prob. 7CQCh. 4 - Prob. 8CQCh. 4 - How does the target manpower change as the demand...Ch. 4 - What happens to the target manpower if the labor...
Ch. 4 - Which of the following actions does not relate to...Ch. 4 - Prob. 12CQCh. 4 - Prob. 13CQCh. 4 - Prob. 14CQCh. 4 - Specialization typically leads to a higher average...Ch. 4 - Prob. 16CQCh. 4 - Prob. 17CQCh. 4 - Prob. 18CQCh. 4 - Prob. 1PACh. 4 - Prob. 2PACh. 4 - Prob. 3PACh. 4 - Prob. 4PACh. 4 - Prob. 5PACh. 4 - Prob. 6PACh. 4 - Prob. 7PACh. 4 - Prob. 8PACh. 4 - Prob. 1C
Additional Business Textbook Solutions
Find more solutions based on key concepts
What is precedent, and how does it affect common law?
Business in Action
What are the three major business functions, and how are they related to one another? Give specific examples.
Operations Management, Binder Ready Version: An Integrated Approach
What is precedent, and how does it affect common law?
Business in Action (8th Edition)
Many companies including Company OM tried to implement dynamic pricing in their ticketing system. The dynamic p...
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
Feeding America Each year, the Feeding America network helps provide food to more than 46 million people facing...
Operations and Supply Chain Management 9th edition
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Canine Kernels Company (CKC) manufactures two differenttypes of dog chew toys (A and B, sold in 1,000-count boxes)that are manufactured and assembled on three differentworkstations (W, X, and Y) using a small-batch process (seeFigure 5.12). Batch setup times are negligible. The flowchartdenotes the path each product follows through the manu-facturing process, and each product’s price, demand perweek, and processing times per unit are indicated as well.Purchased parts and raw materials consumed during pro-duction are represented by inverted triangles. CKC can makeand sell up to the limit of its demand per week; no penaltiesare incurred for not being able to meet all the demand. Eachworkstation is staffed by a worker who is dedicated to workon that workstation alone, and is paid $6 per hour. Totallabor costs per week are fixed. Variable overhead costs are$3,500/week. The plant operates one 8-hour shift per day, or40 hours/week. Which of the three workstations, W, X, or Y,has the highest…arrow_forwardA production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). A) is the bottleneck. b) The bottleneck time isminutes per unit (round your response to two decimal places). c) The throughput time of the overall system is enter your response here minutes (round your response to two decimal places). D) If the firm operates 8 hours per day, 20 days per month, the monthly capacity of the manufacturing process isunits (enter your response as a whole number).arrow_forwardA.J.’s Wildlife Emporium manufactures two unique birdfeeders (Deluxe and Super Duper) that are manufactured and assembled in up to three different workstations (X, Y, Z) using a small batch process. Each of the products is produced according to the flowchart in Figure. Additionally, the flowchart indicates each product’s price, weekly demand, and processing times per unit. Batch setup times are negligible.A.J. can make and sell up to the limit of its weekly demand and there are no penalties for not being able to meet all of the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $16 per hour. The plant operates 40 hours per week, with no overtime. Overhead costs are $2,000 per week. Based on the information provided, as well as the information contained in the flowchart, answer the following questions. a. Using the traditional method, which bases decisions solely on a product’s contribution to profits and overhead, what is the…arrow_forward
- The janitorial staff at the local secondary school have reported that they were low on several cleaning products. New supplies would be required in the next couple of weeks. What kind of process will likely be in place for this situation? A) a routine purchase process B) a supplier review C) a modified rebuy routine D) an order and reorder routine E) a new-task purchasearrow_forwardHow is a vertical-coding control unit constructed, and what components does it need to function properly?arrow_forwardWhich of the following actions does not relate to off-loading the bottleneck?a. Reassigning activities to other, nonbottleneck resourcesb. Automating some of the activities at the bottleneckc. Increasing wages for production workersd. Outsourcing some of the bottleneck activitiesarrow_forward
- XYZ is famous for homemade pizzas which are crisp with thin crust and varied toppings giving the pizzas fabulous tastes. XYZ· is revamping its order processing and pizza-making process. In order to deliver fresh pizza fast, six work elements must be completed as shown in the table below :Element Description Precedence Time (in min)A Receive order - 2·0B Shape dough A 1·0C Prepare toppings A 2·0D Assemble pizza B, C 3·0E Bake pizza D 3·0F Deliver pizza E 3·0Construct a precedence diagram for the process.If the demand is 120 pizzas per night (5:00pm to 1:00am), compute the cycle time for the process. Compute the lead time for the process.What is the theoretical minimum number of workstations needed to achieve the required production?How will you balance the production line to produce and deliver 120 pizzas per night? What is the actual minimum number of workstations needed?arrow_forwardWhich operation is the bottleneck of this process? a. Stocking b. Pricing c. Spotting d. Shipping e. Impossible to determinearrow_forwardAn assembly line is to be designed to operate 7.5 hours per day and supply a steady demand of 300 units per day. a)assign tasks to workstations using the longest operating time b)suppose demand increase by 10%.how would you react to this?assume you can operatee only 7.5 hours per day TASK PRECEDING TASKS PERFORMANCE TIME(seconds) a - 70 b - 40 c - 45 d a 10 e b 30 f c 20 g d 60 h e 50 i f 15 j g 25 k h,i 20 l j,k 25arrow_forward
- EX 6-23 (Algo) The CyClon project team has started... The Cyclon project team has started gathering the information necessary to develop a project network-predecessor activities and activity time in days. The results of their meeting are found in the following table: Activity Description A B C D K Y G H I J K L Design Procure prototype parts Fabricate parts Assemble prototype Laboratory test Pield test Adjust design order stock components Order custom components Assemble test production unit Test unit Document results Duration Predecessor 11 6 What is the ES for Activity D? What is the LF for Activity H? What is the slack for Activity C? What is the slack for Activity H? What is the slack for Activity 17 What is the length of the project? What is the critical path? 8 9 10 9 10 11 A A B, C D F G G H, I 3 Part A. Draw the project network. Compute the early, late, and slack times for each activity. time periods Part B. Upon further review the team recognize that they missed three…arrow_forwardI already find a. I need help with b Bill's Barbershop has two barbers available to cut customer's hair. Both barbers provide roughly the same experience and skill, but one is just a little bit slower than the other. The process flow below shows that all customers go through steps B1 and B2 and then can be served at either of the two barbers at step B3. The process ends for all customers at step B4. The numbers in parentheses indicate the minutes it takes that activity to process a customer. b. What single activity is the bottleneck for the entire process? B what?arrow_forwardTask: Draw a BPMN diagram for the financial workflow business process illustrated on pages 133-134 in Chapter 5 (pictures uploaded).arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY