OPERATIONS MANAGEMENT LL W/CONNECT CODE
2nd Edition
ISBN: 9781266520037
Author: CACHON
Publisher: MCG CUSTOM
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 4, Problem 12CQ
Summary Introduction
To identify: If the given statement is true or false.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
25. Two parallel activities in a process can have different capacities.
True
False
It is possible to increase process capacity by balancing a process. True or false?a. Trueb. False
Rework can increase the costs of an operation but has no impact on the capacity of theprocess. True or false?a. Trueb. False
Chapter 4 Solutions
OPERATIONS MANAGEMENT LL W/CONNECT CODE
Ch. 4 - Prob. 1CQCh. 4 - Prob. 2CQCh. 4 - Prob. 3CQCh. 4 - Prob. 4CQCh. 4 - Prob. 5CQCh. 4 - Which of the following statements about takt time...Ch. 4 - Prob. 7CQCh. 4 - Prob. 8CQCh. 4 - How does the target manpower change as the demand...Ch. 4 - What happens to the target manpower if the labor...
Ch. 4 - Which of the following actions does not relate to...Ch. 4 - Prob. 12CQCh. 4 - Prob. 13CQCh. 4 - Prob. 14CQCh. 4 - Specialization typically leads to a higher average...Ch. 4 - Prob. 16CQCh. 4 - Prob. 17CQCh. 4 - Prob. 18CQCh. 4 - Prob. 1PACh. 4 - Prob. 2PACh. 4 - Prob. 3PACh. 4 - Prob. 4PACh. 4 - Prob. 5PACh. 4 - Prob. 6PACh. 4 - Prob. 7PACh. 4 - Prob. 8PACh. 4 - Prob. 1C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Students have to change buildings between classes, which often involves walks of5 minutes or more. Walking from one building to another is:a. waste.b. non-value-added time.c. value-added time.d. Cannot determine from the given infomationarrow_forwardFunctions individually performing "best in class" combine to achieve the lowest total cost or (facilitate) highly effective processes: True Falsearrow_forwardA department works one 8-hour shift, 250 days a year, and has these figures for usage of amachine that is currently being considered:ProductAnnualDemandStandard ProcessingTime per Unit (hr)Processing TimeNeeded (hr)1 400 5.0 2,0002 300 8.0 2,4003 700 2.0 1,4005,800Units of capacity needed = Processing time needed ___________________________ Processing time capacity per unit (5–3)Working one 8-hour shift 250 days a year provides an annual capacity of 8 × 250 =2,000 hours per year. Consequently, three of these machines would be needed to handle therequired volume:5,800 hours __________________ 2,000arrow_forward
- Suppose a resource has setup times and a setup time must be incurred each time theresource switches production to a different product. Requiring the resource to make anew product (that requires its own setup) is likely to have what effect on the process?a. Inventory for existing products remains the same, but the process must now carryinventory of the new product.b. Inventory of all products is likely to increase.c. Inventory of existing products decreases even though the process must now carryinventory of the new product.d. Inventory of products with short setup times will decrease, while inventory of products with long setup times will increase.arrow_forwardBalancing a process with a fixed sequence of activities will achieve a higher averagelabor utilization than balancing a process with no fixed sequence of activities. True orfalse?a. Trueb. Falsearrow_forward(a) T. Smunt Manufacturing Corp. has the process displayed below. The drilling operation occurs separately from and simultaneously with the sawing and sanding operations. The product only needs to go through one of the three assembly operations (the assembly operations are "parallel"). ASSEMBLY SAWING SANDING 78 min/unit 15 min/unit 15 min/unit WELDING ASSEMBLY DRILLING 25 min/unit 78 min/unit 27 min/unit ASSEMBLY 78 min/unit 1. Which operation is the bottleneck? 2. What is the throughput time for the overall system? 3. If the firm operates 8 hours per day, 22 days per month, what is the monthly capacity of the manufacturing process? 4. Suppose that a second drilling machine is added, and it takes the same time as the original frilling machine. What is the new bottleneck time of the system? 5. Suppose that a second drilling machine is added, and it takes the same time as the original drilling machine. What is the new throughput time?arrow_forward
- Does the process optimise the desired demand of the customer?arrow_forwardBreak-even point is: adding processes to meet the point of changing product demands improving processes to increase throughput the point in dollars or units at which cost equals revenue adding or removing capacity to meet demand the total cost of a process alternativearrow_forwardAmy Xia's p lant was designed to produce 7,000 hammers per day but is limited to making 6,000 hammers per day because of the time needed to change equipment betweenstyles of hammers. What is the utilization?arrow_forward
- 1. In a worker paced assembly line, consider a situation where the daily requirement has suddenly increased. Which of the following statements will be true? a) The required cycle time will also increase proportionally b) The minimum number of workstations required will come down c) The idle times at many workstations will increase d) It will be possible to handle the new requirement by increasing the available time. 2. Which of the following statements will hold good in the case of a system with uncertainty in demand for service and in service times? a) When the utilization of resources fall it is an indication of greater efficiency of the service b) It is a good practice to plan for resource utilization levels more than 85% c) Cost of waiting to get serviced is directly proportional to the cost of providing the service d) None of the above 3. Which of the following pertains to an efficient supply chain? a) It deals with innovative products b) The product life cycle will be…arrow_forward. Aquatica makes underwater camera housings for divers. The process begins with a solid rectangular block of aluminum that is used to make a single housing. A computer numerically controlled (CNC) machine drills into the block to make the metal “frame” of the housing. Each block requires 15 minutes of drilling. The frame is then chemically treated in a series of baths. There is ample capacity in the treating stage. Finally, a worker must manually attach the various buttons and components to the metal housing. This assembly takes 120 minutes per housing per worker and Aquatica has 6 workers trained to do this task. The CNC machine requires a 30-minute setup time before the production of a batch can begin. a. If the CNC machine produces 14 housings between setups, what would be its capacity (in housings per hour)? b. Assuming the process is supply-constrained, what is the utilization (as a number between 0 and 1) of the CNC machine if it operates in batches of 14 housings? c. Assuming…arrow_forwardWhat is OEE and also calculate the OEE from the given data in below table Items Data Shift Length 8 Hours Breaks (2) 15 minute and (1) 30 minute Downtime 47 minutes ideal Cycle Time 1.0 seconds Total Count 19,271 widgets Reject Count 423 widgetsarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.