Chapter 4, Problem 4PA
a)
Summary Introduction
To determine: The labor content.
b)
Summary Introduction
To determine: The average labor utilization.
c)
Summary Introduction
To determine: The cost of direct labor per customer.
d)
Summary Introduction
To determine: The cost of direct labor per customer.
e)
Summary Introduction
To determine: The cost of direct labor per customer with new reassignment.
f)
Summary Introduction
To determine: The capacity of the process in customers per hour.
g)
Summary Introduction
To determine: The capacity of the process in customers per hour.
h)
Summary Introduction
To determine: The capacity of the process in customers per hour.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Mr. K’s is a very popular hair salon. It offers high quality hairstyling andphysical relaxation services at a reasonable price, so it always has unlimiteddemand. The service process includes five activities that are conducted inthe sequence described below ( the time required for each activity is shownin parenthesis):Activity 1: Welcome a guest and offer homemade herb tea (10 minutes)Activity 2: Wash and condition har (10 minutes)Activity 3: Neck, shoulder, and back stress release massage (10 minutes)Activity 4: Design and hair style and do the hair (25 minutes)Activity 5: Ring up the guest bill (5 minutes)Each activity has one employee dedicated to it. For the following questions,assume unlimited demand. Also assume that the employee at activity 1 onlyadmits new guests at the rate of the bottleneck.(a) Which resource is the bottleneck?(b) What is the capacity of the process?(c) What is the flow rate?(d) What is the utilization of the employee at activity 3(e) What is the cycle time?
[The following information applies to the questions displayed below.]
The following are the car repair shop data:
TETE
Ticket No.
Work
Ticket No.
Work
Ticket No.
Work
1
Lube & oil
11
Battery
21
Battery
Tires
2
Lube & oil
12
Tires
22
3
Brakes
13
Brakes
23
Brakes
4
Lube & oil
14
Transmission
24
Transmission
Lube & oil
15
Brakes
25
Brakes
Tires
16
Battery
26
Lube & oil
7
Tires
17
Brakes
27
Lube & oil
8.
Brakes
18
Tires
28
Lube & oil
9.
Brakes
19
Tires
29
Tires
10
Lube & oil
20
Lube & oil
30
Lube & oil
Posh Nails
Katie Posh runs an upscale nail salon. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parentheses):
Activity 1: Welcome a guest. (1 minute)Activity 2: Clip and file nails. (3 minutes)Activity 3: Paint. (5 minutes)Activity 4: Dry. (10 minutes)Activity 5: Check out the customer. (4 minutes)Three servers (S1, S2, and S3) offer the services in a worker-paced line. The assignment of tasks to servers is the following: S1 does Activity 1. S2 does Activities 2 and 3. S3 does Activities 4 and 5. The drying process does not require server 3’s constant attention; she/he needs to only escort the customer to the salon’s drying chair (equipped with fans for drying). The time to do this is negligible. There exists only one drying chair in the salon.
What is the average labor utilization of the servers (in decimal form)? Assume that there is unlimited demand and that the process only admits…
Chapter 4 Solutions
OPERATIONS MANAGEMENT LL W/CONNECT CODE
Ch. 4 - Prob. 1CQCh. 4 - Prob. 2CQCh. 4 - Prob. 3CQCh. 4 - Prob. 4CQCh. 4 - Prob. 5CQCh. 4 - Which of the following statements about takt time...Ch. 4 - Prob. 7CQCh. 4 - Prob. 8CQCh. 4 - How does the target manpower change as the demand...Ch. 4 - What happens to the target manpower if the labor...
Ch. 4 - Which of the following actions does not relate to...Ch. 4 - Prob. 12CQCh. 4 - Prob. 13CQCh. 4 - Prob. 14CQCh. 4 - Specialization typically leads to a higher average...Ch. 4 - Prob. 16CQCh. 4 - Prob. 17CQCh. 4 - Prob. 18CQCh. 4 - Prob. 1PACh. 4 - Prob. 2PACh. 4 - Prob. 3PACh. 4 - Prob. 4PACh. 4 - Prob. 5PACh. 4 - Prob. 6PACh. 4 - Prob. 7PACh. 4 - Prob. 8PACh. 4 - Prob. 1C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Posh Nails Katie Posh runs an upscale nail salon. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parentheses): Activity 1: Welcome a guest. (1 minute)Activity 2: Clip and file nails. (3 minutes)Activity 3: Paint. (5 minutes)Activity 4: Dry. (10 minutes)Activity 5: Check out the customer. (4 minutes)Three servers (S1, S2, and S3) offer the services in a worker-paced line. The assignment of tasks to servers is the following: S1 does Activity 1. S2 does Activities 2 and 3. S3 does Activities 4 and 5. The drying process does not require server 3’s constant attention; she/he needs to only escort the customer to the salon’s drying chair (equipped with fans for drying). The time to do this is negligible. There exists only one drying chair in the salon. Assume a wage rate of $12 per hour. What are the direct labor costs for one customer (in dollars)?arrow_forwardFour employees at a fast-food restaurant each perform one of the four activities in serving a customer: greet customer, take order, process order, and deliver order. The processing time for each activity is given as follows: Greet customer Take order Process order Deliver order A) 50% Assume demand is unlimited. What is the average labor utilization? B) 68% C) 40% Activity D) 162% Processing time per customer 2 seconds 30 seconds 60 seconds 5 secondsarrow_forwardA lab provides ultrasound service to patients. The service process consists of two steps: 1. Registration. Performed by a receptionist (Salary rate = $25/hr; Process time = 6 minutes/patient) 2. Ultrasound scan. Performed by a technician (Salary rate = $30/hr; Process time = 20 minutes/patient) Note that the ultrasound images need to be read by radiologists, but we assume that they have an ample capacity and thus will not model the role in the service process. Currently, the lab has 2 receptionists and 3 technicians. The manager anticipates demand to grow to 14 patients/hr in the near future. Thus, he plans to hire more receptionists and/or technicians to increase the service capacity to at least 14 patients/hr. What would be the extra payroll cost (in dollars per hr)?arrow_forward
- Mr. K’s is a very popular hair salon. It offers high-quality hair styling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parenthesis): Activity 1: Welcome a guest and offer homemade herb tea. (10 minutes) Activity 2: Wash and condition hair. (10 minutes) Activity 3: Neck, shoulder, and back stress release massage. (10 minutes) Activity 4: Design the hairstyle and do the hair. (25 minutes) Activity 5: Check out the guest. (5 minutes) Three servers (S1, S2, and S3) offer the services in a worker-paced line. The assignment of tasks to servers is the following: S1 does Activity 1. S2 does Activities 2 and Activity 3. S3 does Activities 4 and Activity 5. a) Which server is the bottleneck of the process ? b) What is the utilization of server 2 ? c) What is the…arrow_forwardAn automobile service is having difficulty providing oil changes in the 29 minutes or less mentioned in its advertising. You are to analyze the process of changing automobile engine oil. The subject of the study is the service mechanic. The process begins when the mechanic directs the customer’s arrival and ends when the customer pays for the services.arrow_forwardNavern Corporation manufactures and sells custom home elevators. From the time an order is placed until the time the elevator is installed in the customer's home averages 141 days. The 141 days are spent as follows: Wait time Inspection time Process time Move time Queue time What is Navern's manufacturing cycle efficiency (MCE) for its elevators? Multiple Choice O O 41.1% 30.4% 58.9% 29 days 24 days 34 days 31 days 23 days 57.4%arrow_forward
- A company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 6 workers, who together produced an average of 70 carts per hour. Workers receive $18 per hour, and machine cost was $30 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $11 per hour, while output increased by 5 carts per hour. a. Compute labor productivity under each system. Use carts per worker per hour as the measure of labor productivity. (Round your answers to 3 decimal places.) b. Compute the multifactor productivity under each system. Use carts per dollar cost (labor plus equipment) as the measure. (Round your answers to 3 decimal places.) c. Comment on the changes in productivity according to the two measures. (Round your intermediate calculations…arrow_forwardCubway, the sandwich shop, is run by Jim, Tim and Kim. When a customer arrives, Jim spends 5 minutes taking order from the customer. After this, Tim prepares bread and Kim prepares filling for the order. These activities are performed in parallel, and take 6 and 12 minutes respectively. Jim then assembles the bread and filling, which takes 4 minutes of his time. Finally, Tim spends 1 minutes in delivering the order and taking payment. What is maximum number of sandwiches Cubway can make per hour? (In other words, what is the capacity of the process in sandwiches per hour?)arrow_forwardA company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 5 workers, who together produced an average of 90 carts per hour. Workers receive $13 per hour, and machine cost was $50 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $11 per hour while output increased by 5 carts per hour. a. Compute labor productivity under each system. Use carts per worker per hour as the measure of labor productivity. (Round your answers to 3 decimal places.) Before carts per worker per hour After carts per worker per hour b. Compute the multifactor productivity under each system. Use carts per dollar cost (labor plus equipment) as the measure. (Round your answers to 3 decimal places.) Before carts/dollar cost…arrow_forward
- A company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 6 workers, who together produced an average of 80 carts per hour. Workers receive $18 per hour, and machine cost was $40 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $10 per hour, while output increased by 5 carts per hour. Comment on the changes in productivity according to the two measures. (Round your intermediate calculations to 3 decimal places and final answers to 2 decimal places.) Labor Productivity increased by ____% Multifactor productivity increased by ___%arrow_forwardThe ClickClock corporation produces clocks with six stations. Each station is manned by a human worker, who do the following tasks: These workers get paid $ 10 an hour. Ignore any Station Task Sequence Processing Time (secs) Task Heat-stake lens to bezel Inspect bezel Clean switch holes Install set switch in bezel Total time for A Check switch travel Clean inside bezel Install module in bezel Total time for B Install battery clip in module Heat-stake battery clip in module Install two batteries in module Check switch 14 2 26 A 3 10 Preparation 1 4 18 68 23 B 6 12 Preparation 2 7 25 60 8 20 9 20 Battery 10 22 Installation 11 8. Total time for C 70 Install band Inspect band Total time for D Cosmetic inspection Final test D 12 45 Band 13 13 Installation 58 E 14 4 Packaging 15 71 Preparation Total time for E 75 Place watch and cuff in display box Place cover in display box base 16 20 17 14 Watch 18 Place owner's manual and box into tub 30 packaging Total time for F 64arrow_forwardA company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 5 workers, who together produced an average of 80 carts per hour. Workers receive $10 per hour, and machine cost was $40 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $10 per hour while output increased by 4 carts per hour. Compute labor productivity under each system. Use carts per worker per hour as the measure of labor productivity.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY