EBK BASICS OF ENGINEERING ECONOMY
2nd Edition
ISBN: 8220100255052
Author: Blank
Publisher: MCG
expand_more
expand_more
format_list_bulleted
Question
Chapter 4, Problem 11P
To determine
Calculate the present worth.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The initial cost of a packed-bed degassing reactor for removing trihalomethanes from potable water is $84,000. The annual operating cost for power, site maintenance, etc. is $13,000. If the salvage value of the pumps, blowers, and control systems is expected to be $9000 at the end of 10 years, the AW of the packed-bed reactor, at an interest rate of 8% per year, is closest to: (a) $−26,140 (b) $−25,518 (c) $−24,900 (d) $−13,140
A company that manufactures high-speed submersible rotary-indexing spindles is considering an upgrade of production equipment to reduce costs over the next 5 years. The company can invest $80,000 now, 1 year from now, or 2 years from now. Depending on when the investment is made, the savings will vary. The saving estimates are $26,000, $31,000, or $37,000 per year if the investment is made now, 1 year from now, or 2 years from now, respectively. The company will only invest if the ROR is at least 20% per year. Using a future worth analysis, determine if the timing of the investment will affect the return requirement and, if so, when the investment should be made. Solve by (a) hand, and (b) spreadsheet.
Adams Manufacturing spent $30,000 on a new sterilization conveyor belt, which resulted in a cost savings of $4202 per year. The length of time it should take to recover the investment at 8% per year is closest to: (a) Less than 6 years (b) 7 years (c) 9 years (d) 11 years
Chapter 4 Solutions
EBK BASICS OF ENGINEERING ECONOMY
Ch. 4 - State two conditions under which the do-nothing...Ch. 4 - Prob. 2PCh. 4 - Prob. 3PCh. 4 - Prob. 4PCh. 4 - Prob. 5PCh. 4 - Prob. 6PCh. 4 - Prob. 7PCh. 4 - Prob. 8PCh. 4 - Prob. 9PCh. 4 - The costs associated with manufacturing a...
Ch. 4 - Prob. 11PCh. 4 - Prob. 12PCh. 4 - Prob. 13PCh. 4 - Prob. 14PCh. 4 - Prob. 15PCh. 4 - Prob. 16PCh. 4 - Prob. 17PCh. 4 - Prob. 18PCh. 4 - Prob. 19PCh. 4 - Prob. 20PCh. 4 - Prob. 21PCh. 4 - Prob. 22PCh. 4 - Prob. 23PCh. 4 - Prob. 24PCh. 4 - Prob. 25PCh. 4 - Prob. 26PCh. 4 - Prob. 27PCh. 4 - Prob. 28PCh. 4 - Prob. 29PCh. 4 - Prob. 30PCh. 4 - Prob. 31PCh. 4 - Two mutually exclusive projects have the estimated...Ch. 4 - Prob. 33PCh. 4 - Prob. 34PCh. 4 - Prob. 35PCh. 4 - Prob. 36PCh. 4 - Prob. 37PCh. 4 - The manager of engineering at the 900-megawatt...Ch. 4 - Prob. 39PCh. 4 - Prob. 40PCh. 4 - Prob. 41PCh. 4 - Three different plans were presented to the GAO by...Ch. 4 - The U.S. Army received two proposals for a turnkey...Ch. 4 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63APQCh. 4 - Prob. 64APQCh. 4 - Prob. 65APQCh. 4 - Prob. 66APQCh. 4 - Prob. 67APQCh. 4 - Prob. 68APQCh. 4 - Prob. 69APQCh. 4 - Prob. 70APQCh. 4 - Prob. 71APQ
Knowledge Booster
Similar questions
- An oil refinery finds that it is necessary to treat the waste liquids from a new process before discharging them into a stream. In-house treatment will have an annual cost of $50,000 the first year, but process improvements will allow the annual cost to decline by $5,000 each subsequent year. As an alternative, an outside company will process the wastes for an initial cost of $32,400 and an annual fixed price of $30,400/year throughout the 13 year period. Either way, there is no need to treat the wastes after 13 years. Using the AW method, calculate the equivalent uniform annual cost (EUAC) of each alternative and determine how the waste should be processed. The company's MARR is 8%. LOADING... Click the icon to view the interest and annuity table for discrete compounding when the MARR is 8% per year.arrow_forwardA land development company is considering the purchase of earth-moving equipment. The equipment will have a first cost of $190,000 and a salvagevalue of $70,000 when the company sells it in 10 years. A service contract for maintenance on the equipment will cost $40,000 per year. The operatingcost is expected to be $260 per day. Alternatively, the company can rent the necessary equipment for $1100 per day and hire a driver at $180 per day. If the company’s MARR is 10% per year, how many days per year must the company need the equipment in order to justify its purchase?arrow_forwardBecause of international competition, a company that manufactures high-speed submersible rotary indexing spindles must upgrade its production equipment to reduce costs over a 6-year planning horizon. The company can invest $80,000 one year from now, 2 years from now, or 3 years from now. Depending on when the investment is made, the savings will vary. That is, the savings will be $29,000, 34,000, or $38,000 per year if the investment is made 1, 2, or 3 years from now, respectively. Will the timing of the investment affect the request to make at least 20% per year return? Use future worth analysis and solve using factors. (Click to select) No Yes , the timing of the investment (Click to select) will not will affect the request to make at least 20% per year return. The investment must be made in (Click to select) 3 2 1 years.arrow_forward
- EP Electric has identified two new methods to treat its cooling water. Alternative I (for inflow) would treat the raw water with a conventional reverse osmosis system so that the cycles of concentration could be increased from 5 to 20. This will result in water cost savings of $360,000 per year and chemical cost savings of $56,000 per year. The initial cost of the equipment will be $2.3 million with an operating cost of $125,000 per year. Alternative B (for blowdown) will treat the cooling tower blowdown water using a highpressure seawater reverse osmosis system to recover most of the water that is sent to an evaporation pond. This option will result in water savings of $270,000 per year. The cost of the system will be $1.2 million with an operating cost of $105,000 per year. Assuming one of the two methods must be installed, determine which is preferred on the basis of the incremental ROR value using MARR of 5% per year, which is a typically low return expected of government projects.…arrow_forwardWhat is the present worth difference between an investment of $30,000 per year for 40 years and aninvestment of $30,000 per year forever at an interest rate of 15% per year?arrow_forwardThe president of Biomed Products is considering a long-term contract to outsource maintenance and operations that will significantly improve the energy efficiency of their imaging systems. The payment schedule has two large payments in the first years with continuing payments thereafter. The proposed schedule is $200,000 now, $300,000 four years from now, $50,000 every 5 years, and an annual amount of $8000 beginning 15 years from now and continuing indefinitely. Determine the capitalized cost at 8% per year.arrow_forward
- Accusoft Systems is offering small business owners a software package that keeps track of many accounting functions from bank transactions to sales invoices. The site license will cost $55,000 to install and will require a fee of $2500 every 3 months. If your company can save $13,500 every quarter and have the security of managing its books in-house, how long will it take for you to recover the investment at an interest rate of 8% per quarter? The time taken to recover the investment is determined to be _______ quarters.arrow_forwardBecause of international competition, a company that manufactures high-speed submersible rotary indexing spindles must upgrade its production equipment to reduce costs over a 6-year planning horizon. The company can invest $80,000 one year from now, 2 years from now, or 3 years from now. Depending on when the investment is made, the savings will vary. That is, the savings will be $20,000, 25,000, or $38,000 per year if the investment is made 1, 2, or 3 years from now, respectively. Will the timing of the investment affect the request to make at least 20% per year return? Use future worth analysis and solve using factors. Please provide excel formula.arrow_forwardAn engineer has been offered an investment opportunity that will require a cash outlay of $40,000 now for a cash inflow of $3500 for each year of investment. However, she must state now the number of years she plans to retain the investment. Additionally, if the investment is retained for 6 years, a lump-sum amount of $36,000 will be returned to her; after 10 years, the lump-sum return is anticipated to be $49,000, and after 15 years, it is estimated to be $55,000. Money is currently worth 10% per year. (a) Is the decision sensitive to the retention period? If so, what investment period is best? (b) Write the format of the spreadsheet function that will display the correct PW values.arrow_forward
- A Company purchased equipment that has two year warranty and AOC = $1500 per year, beginning in year 3 and continuing through the equipment's 10-year life. What is the approximate PW of the operating cost if the interest rate is 9%?arrow_forwardAn engineer is trying to decide which process to use to reduce sludge volume prior to disposal. Belt filter presses (BFP) will cost $203,000 to buy and $85,000 per year to operate. Belts will be replaced one time per year at a cost of $5500. Centrifuges (Cent) will cost $396,000 to buy and $119,000 per year to operate, but because the centrifuge will produce a thicker “cake”, the sludge hauling cost to the monofill will be $37,000 per year less than for the belt presses. The useful lives are 5 and 10 years for alternatives BFP and Cent, respectively, and the salvage values are assumed to be 10% of the first cost of each process whenever they are closed down or replaced. Use PW evaluation to select the more economical process at an interest rate of 6% per year over (a) the LCM of lives, and (b) a study period of 8 years. Are the decisions the same?arrow_forwardAn engineer has been offered an investment opportunity that will require an immediate cash outlay of $40,000 for a cash inflow of $3500 for each year of investment. However, she must state now the number of years she plans to retain the investment. Additionally, if the investment is retained for 6 years, a lump-sum amount of $36,000 will be returned to her; after 10 years, the lump sum return is anticipated to be $50,500, and after 15 years, it is estimated to be $52.000. Money is currently worth 9% per year. Determine the present worth values for 6 years, 10 years, and 15 years, and decide if the decision is sensitive to the retention period? The present worth when the investment is retained for 6 years is $___________ The present worth when the investment is retained for 10 years is $____________ The present worth when the Investment is retained for 15 years is $_____________arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education