EBK BASICS OF ENGINEERING ECONOMY
2nd Edition
ISBN: 8220100255052
Author: Blank
Publisher: MCG
expand_more
expand_more
format_list_bulleted
Question
Chapter 4, Problem 45P
To determine
Select the project.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A process can be completed using either Alternative X or Y, where Y is an automated version of X. Alternative X has fixed costs of $10,000 per year with a variable cost of $50 per unit. If the process is automated, the fixed cost for Y will be $5,000 per year and its variable cost will be only $30 per unit. The minimum number of units that must be produced each year for alternative Y to be favored is closest to:a. Alternative Y will be favored for any level of productionb. 125c. 375d. Alternative X will be favored for any level of production
Accurate air flow measurement requires straight, unobstructed pipe for a minimum of 10 diameters upstream and 5 diameters downstream of the measuring device. In one particular application, physical constraints compromised the pipe layout, so the engineer was considering installing the air flow probes in an elbow (Plan A), knowing that flow measurement would be less accurate but good enough for process control. This plan would be acceptable for only 2 years, after which a more accurate flow measurement system with the same costs will be available. Plan A has a first cost of $25,000 with annual M&O estimated at $4000. Plan B involves installation of a recently designed submersible air flow probe. The stainless steel probe could be installed in a drop pipe with the transmitter located in a waterproof enclosure on the handrail. The cost of this system will be $88,000, but because it is accurate, it would not have to be replaced for at least 6 years. Its maintenance cost is estimated to…
An engineer is trying to decide which process to use to reduce sludge volume prior to disposal. Belt filter presses (BFP) will cost $203,000 to buy and $85,000 per year to operate. Belts will be replaced one time per year at a cost of $5500. Centrifuges (Cent) will cost $396,000 to buy and $119,000 per year to operate, but because the centrifuge will produce a thicker “cake”, the sludge hauling cost to the monofill will be $37,000 per year less than for the belt presses. The useful lives are 5 and 10 years for alternatives BFP and Cent, respectively, and the salvage values are assumed to be 10% of the first cost of each process whenever they are closed down or replaced. Use PW evaluation to select the more economical process at an interest rate of 6% per year over (a) the LCM of lives, and (b) a study period of 8 years. Are the decisions the same?
Chapter 4 Solutions
EBK BASICS OF ENGINEERING ECONOMY
Ch. 4 - State two conditions under which the do-nothing...Ch. 4 - Prob. 2PCh. 4 - Prob. 3PCh. 4 - Prob. 4PCh. 4 - Prob. 5PCh. 4 - Prob. 6PCh. 4 - Prob. 7PCh. 4 - Prob. 8PCh. 4 - Prob. 9PCh. 4 - The costs associated with manufacturing a...
Ch. 4 - Prob. 11PCh. 4 - Prob. 12PCh. 4 - Prob. 13PCh. 4 - Prob. 14PCh. 4 - Prob. 15PCh. 4 - Prob. 16PCh. 4 - Prob. 17PCh. 4 - Prob. 18PCh. 4 - Prob. 19PCh. 4 - Prob. 20PCh. 4 - Prob. 21PCh. 4 - Prob. 22PCh. 4 - Prob. 23PCh. 4 - Prob. 24PCh. 4 - Prob. 25PCh. 4 - Prob. 26PCh. 4 - Prob. 27PCh. 4 - Prob. 28PCh. 4 - Prob. 29PCh. 4 - Prob. 30PCh. 4 - Prob. 31PCh. 4 - Two mutually exclusive projects have the estimated...Ch. 4 - Prob. 33PCh. 4 - Prob. 34PCh. 4 - Prob. 35PCh. 4 - Prob. 36PCh. 4 - Prob. 37PCh. 4 - The manager of engineering at the 900-megawatt...Ch. 4 - Prob. 39PCh. 4 - Prob. 40PCh. 4 - Prob. 41PCh. 4 - Three different plans were presented to the GAO by...Ch. 4 - The U.S. Army received two proposals for a turnkey...Ch. 4 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63APQCh. 4 - Prob. 64APQCh. 4 - Prob. 65APQCh. 4 - Prob. 66APQCh. 4 - Prob. 67APQCh. 4 - Prob. 68APQCh. 4 - Prob. 69APQCh. 4 - Prob. 70APQCh. 4 - Prob. 71APQ
Knowledge Booster
Similar questions
- Two membrane systems are under consideration for treating cooling tower blowdown to reduce its volume. A low-pressure seawater reverse osmosis(SWRO) system will operate at 500 psi and produce 720,000 gallons of permeate per day. It will have a fixed cost of $465 per day and an operatingcost of $485 per day. A higher pressure SWRO system operating at 800 psi will produce 950,000 gallons per day at an operating cost of $1280 perday. The fixed cost of the high pressure SWRO system will be only $328 per day because fewer membranes will be required. How many gallons of blowdown water must require treatment each day for the two systems to break even?arrow_forwardThe Ecology Group wishes to purchase a piece of equipment for recycling of various metals. Machine 1 costs $123,000, has a life of 10 years, an annual cost of $5000, and requires one operator at a cost of $24 per hour. It can process 10 tons per hour. Machine 2 costs $70,000, has a life of 6 years, an annual cost of $2500, and requires two operators at a cost of $24 per hour each to process 6 tons per hour. Assume i = 7% per year and 2080 hours per work year. Determine the annual breakeven tonnage of scrap metal at i = 7% per year and select the better machine for a processing level of 1500 tons per year.arrow_forwardLeroy purchased an AI-based robotics system with the first cost of $345,000, an AOC of $148,000 per year, a $140,000 salvage value, and an ESL of 3 years. Rather than trading after 3 years, he kept the system for a total of 5 years. Due to the wear factor and expense of repairs, its AOC increased to $240,000 per year starting in year 4, plus the salvage value went to zero. At i= 10% per year, what is the percentage increase in the AW of costs that Leroy experienced? The percentage increase in the AW of costs that Leroy experienced is %.arrow_forward
- An item with a holding cost of $400 per year can be shipped by air in 1 day, costing $250, or by ground in 5 days, costing $150. Assuming the holding costs of $400 per year are based on an operational year of 365 days, which is cheaper and by how much?arrow_forwardA chemical engineer is considering two sizes of pipes for moving distillate from a refinery to the tank farm. A small pipeline will cost less to purchase (including valves and other appurtenances), but will have a high head loss and, therefore, a higher pumping cost. The small pipeline will cost $1.7 million installed and have an operating cost of $12,000 per month. A larger-diameter pipeline will cost $2.1 million installed, but its operating cost will be only $8000 per month. Which pipe size is more economical at an interest rate of 1% per month on the basis of an annual worth analysis? Assume the salvage value is 10% of the first cost for each pipeline at the end of the 10-year project.arrow_forwardBecause of international competition, a company that manufactures high-speed submersible rotary indexing spindles must upgrade its production equipment to reduce costs over a 6-year planning horizon. The company can invest $80,000 one year from now, 2 years from now, or 3 years from now. Depending on when the investment is made, the savings will vary. That is, the savings will be $29,000, 34,000, or $38,000 per year if the investment is made 1, 2, or 3 years from now, respectively. Will the timing of the investment affect the request to make at least 20% per year return? Use future worth analysis and solve using factors. (Click to select) No Yes , the timing of the investment (Click to select) will not will affect the request to make at least 20% per year return. The investment must be made in (Click to select) 3 2 1 years.arrow_forward
- To make an item in-house, equipment costing $250,000 must be purchased. It will have a life of 4 years, annual operating cost of $80,000, and each unit will cost $40 to manufacture. Buying the item externally will cost $100 per unit. At i=15% per year, at what number of units needed per year will it be more economical to produce the item in-house? Using Breakeven Analysis, pls solve the problemarrow_forwardIn a cold storage plant, it is desired to determine whether to use insulation two inches thick or three inches thick in insulating the walls of the cold storage ware house. Heat absorb through the walls without insulation would cost P96.00 per year per square meter. A two-inch insulation will cost P30.40 per square meter and will cut out 89% of the loss. A three-inch insulation will cut out 92% of the loss and will cost P65.00 per square meter. Using a life 15 years for the insulation with no salvage value and a minimum attractive return of 8%, what thickness of insulation should be used?arrow_forwardThe cost of producing a small transistor radio set consists of P23.00 for labor and P37.00 for materials. The fixed charges in operating the plants are P100,000 per month. The variable cost is P1.00 per set. The radio set can be sold for P75.00 each. Determine how many sets must be produced per month to break even.arrow_forward
- Due to the high crime rate in the city center, the state council in partnership with the police has installed CCTV in several “hotspot” areas. The installation of the CCTV cost USD1000000. The cost of CCTV maintenance in the first year is USD500,000, USD700000 in the second year, USD950000 in the third year, USD990000 in the fourth year and costs are realized at the end of each year. On the other hand, the installation of CCTV will help to reduce crime in that area and is predicted to bring about a benefit of USD2000000 for the first and second year and a benefit of USD 3000000 for the third and fourth year. At the end of the fourth year, the CCTV will be replaced by a new one and it can be resold as second hand for USD200000. Assume the discount rate of 3% is used. Calculate the present value of net benefits assuming that the benefits are realized at the beginning of each of the three years. Also, draw the timeline of benefits and costs.arrow_forwardDue to the high crime rate in the city center, the state council in partnership with the police has installed CCTV in several “hotspot” areas. The installation of the CCTV cost USD1000000. The cost of CCTV maintenance in the first year is USD500,000, USD700000 in the second year, USD950000 in the third year, USD990000 in the fourth year and costs are realized at the end of each year. On the other hand, the installation of CCTV will help to reduce crime in that area and is predicted to bring about a benefit of USD2000000 for the first and second year and a benefit of USD 3000000 for the third and fourth year. At the end of the fourth year, the CCTV will be replaced by a new one and it can be resold as second hand for USD200000. Assume the discount rate of 3% is used. Calculate also Year 0 a). Calculate the present value of net benefits assuming the benefits are realized at the end of each of the four years. Also, draw the timeline of benefits and costs. b) Calculate the present value of…arrow_forwardDue to the high crime rate in the city center, the state council in partnership with the police has installed CCTV in several “hotspot” areas. The installation of the CCTV cost USD1000000. The cost of CCTV maintenance in the first year is USD500,000, USD700000 in the second year, USD950000 in the third year, USD990000 in the fourth year and costs are realized at the end of each year. On the other hand, the installation of CCTV will help to reduce crime in that area and is predicted to bring about a benefit of USD2000000 for the first and second year and a benefit of USD 3000000 for the third and fourth year. At the end of the fourth year, the CCTV will be replaced by a new one and it can be resold as second hand for USD200000. Assume the discount rate of 3% is used. a). Calculate the present value of net benefits assuming the benefits are realized at the end of each of the four years. Also, draw the timeline of benefits and costs.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education