EBK BASICS OF ENGINEERING ECONOMY
2nd Edition
ISBN: 8220100255052
Author: Blank
Publisher: MCG
expand_more
expand_more
format_list_bulleted
Question
Chapter 4, Problem 18P
a:
To determine
Calculate the present worth.
b:
To determine
Calculate the present worth through spreadsheet.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
In order to provide drinking water as part of its 50-year plan, a west coast city is considering constructing a pipeline for importing water from a nearby community that has a plentiful supply of brackish ground water. A full-sized pipeline can be constructed at a cost of $125 million now. Alternatively, a smaller pipeline can be constructed now for $85 million and enlarged 20 years from now for another $90 million. The pumping cost will be $25,000 per year higher for the smaller pipeline during the first 20 years, but it will be approximately the same thereafter. Both pipelines are expected to have the same useful life with no salvage value
At an interest rate of 11% per year
The present worth of the full-sized pipeline is determined to be what and that of the small-sized pipeline is what
Which pipeline is the most economical pipeline
The State of Chiapas, Mexico, decided to fund a program for literacy. The first cost of $300,000 now and an updated budget of $145,000 every 7 years forever is requested. Determine the perpetual equivalent annual cost at an interest rate of 10% per year.
The perpetual equivalent annual cost is $− .
The Texas Department of Transportation (TxDOT) is considering two designs for crash barriers along a reconstructed portion of I-10. Design 2B will cost $3 million to install and $125,500 per year to maintain. Design 4R will cost $3.7 million to install and $55,000 per year to maintain. Determine which design should be selected based on a rate of return analysis if TxDOT uses a MARR of 6% per year and a 20-year project period. The rate of return is Not attempted ______%.
Chapter 4 Solutions
EBK BASICS OF ENGINEERING ECONOMY
Ch. 4 - State two conditions under which the do-nothing...Ch. 4 - Prob. 2PCh. 4 - Prob. 3PCh. 4 - Prob. 4PCh. 4 - Prob. 5PCh. 4 - Prob. 6PCh. 4 - Prob. 7PCh. 4 - Prob. 8PCh. 4 - Prob. 9PCh. 4 - The costs associated with manufacturing a...
Ch. 4 - Prob. 11PCh. 4 - Prob. 12PCh. 4 - Prob. 13PCh. 4 - Prob. 14PCh. 4 - Prob. 15PCh. 4 - Prob. 16PCh. 4 - Prob. 17PCh. 4 - Prob. 18PCh. 4 - Prob. 19PCh. 4 - Prob. 20PCh. 4 - Prob. 21PCh. 4 - Prob. 22PCh. 4 - Prob. 23PCh. 4 - Prob. 24PCh. 4 - Prob. 25PCh. 4 - Prob. 26PCh. 4 - Prob. 27PCh. 4 - Prob. 28PCh. 4 - Prob. 29PCh. 4 - Prob. 30PCh. 4 - Prob. 31PCh. 4 - Two mutually exclusive projects have the estimated...Ch. 4 - Prob. 33PCh. 4 - Prob. 34PCh. 4 - Prob. 35PCh. 4 - Prob. 36PCh. 4 - Prob. 37PCh. 4 - The manager of engineering at the 900-megawatt...Ch. 4 - Prob. 39PCh. 4 - Prob. 40PCh. 4 - Prob. 41PCh. 4 - Three different plans were presented to the GAO by...Ch. 4 - The U.S. Army received two proposals for a turnkey...Ch. 4 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63APQCh. 4 - Prob. 64APQCh. 4 - Prob. 65APQCh. 4 - Prob. 66APQCh. 4 - Prob. 67APQCh. 4 - Prob. 68APQCh. 4 - Prob. 69APQCh. 4 - Prob. 70APQCh. 4 - Prob. 71APQ
Knowledge Booster
Similar questions
- The Texas Department of Transportation (TxDOT) is considering two designs for crash barriers along a reconstructed portion of I-10. Design 2B will cost $3 million to install and $142,500 per year to maintain. Design 4R will cost $3.7 million to install and $55,000 per year to maintain. Determine which design should be selected based on a rate of return analysis if TxDOT uses a MARR of 6% per year and a 20-year project period. The rate of return is __ % Design __ is selected.arrow_forwardWhat is the present worth difference between an investment of $30,000 per year for 40 years and aninvestment of $30,000 per year forever at an interest rate of 15% per year?arrow_forwardA secondary road in a developing country, 20 km long is to be improved by surface treating the gravel surface without any change in length. The cost of improvement is estimated at $150,000 per km (specifically, $80,000 per km at the beginning of year 1 and $70,000 per km at the beginning of year 2). Present annual transport costs (vehicle operating costs and maintenance costs, etc.) for all traffic on the existing road is estimated at $210,000 per km per annum. During the 2-year treatment, all traffic need to detour. The detour may cause a higher network-wide cost (transport cost and management cost) which is estimated to be $7,500,000 per annum in total. After improvement, this is expected to reduce to $150,000 per km per annum. If Minimum Attractive Rate of Return is 8% and project life is 20 years after reconstruction with zero salvage value. Resurfacing will be required 10 years after reconstruction at a costs of 50,000 per km. Use the B/C ratio method to determine whether the…arrow_forward
- What is meant by the term equal service alternative?arrow_forwardAero Serve, Inc. manufactures cleaning nozzles for reverse pulse jet dust collectors. The company spent $40,000 on a production control system that will increase profits by $11,096 per year for 5 years. The rate of return per year on the investment is closest to: (a) 20% (b) 16% (c) 12% (d) Less than 11%arrow_forwardWhich is the most efficient analysis method we can use for determining project acceptability on an economic basis?arrow_forward
- A window frame manufacturer is searching for ways to improve revenue from its triple-insulated sliding windows, sold primarily in the far northern areas of the United States. Alternative A is an in- crease in TV and radio marketing. A total of $300,000 spent now is expected to increase revenue by $60,000 per year. Alternative B requires the same investment for enhancements to the in-plant manufacturing process that wil improve the temperature retention properties of the seals around each glass pane. New revenues start slowly for this alternative at an estimated $10,000 the first year, with growth of $15,000 per year as the improved product gains reputation among builders. The MARR is 8% per year and the maximum projection period is 10 years for either alternative.arrow_forwardThe sheriff of Los Lunas county along the Arizona- Mexico border asked the county to build a new minimum security detention facility for personscaught while attempting to enter the United States illegally. The construction cost will be $22 million, with annual operating costs of $2.1 million. The new facility will create jobs that produce benefits for many local businesses including realtors, restaurants, etc. The benefits are estimated to be $5 million in years 1 and 2, $2.8 million in year 3, and $1.12 million per year beginning in year 4 and continuing through the 30-year life of the facility. At a discount rate of 8% per year, does the conventional B/C ratio indicate that the project is economically justified?arrow_forwardIn order for a higher-cost alternative to be attractive, the incremental rate of return must be__________________.A. Greater than MARRB. Less than or equal to MARRC. Less than MARRD. Greater than or equal to MARRarrow_forward
- Two methods can be used for producing solar panels for electric power generation. Method 1 will have an initial cost of $550,000, an AOC of $160,000 per year, and $125,000 salvage value after its 3-year life. Method 2 will cost $830,000 with an AOC of $120,000, and a $240,000 salvage value after its 5-year life. Assume your boss asked you to determine which method is better, but she wants the analysis done over a 3-year planning period. You estimate the salvage value of method 2 will be 35% higher after 3 years than it is after 5 years. If the MARR is 10% per year, which method should the company selectarrow_forwardThe president of Biomed Products is considering a long-term contract to outsource maintenance and operations that will significantly improve the energy efficiency of their imaging systems. The payment schedule has two large payments in the first years with continuing payments thereafter. The proposed schedule is $200,000 now, $300,000 four years from now, $50,000 every 5 years, and an annual amount of $8000 beginning 15 years from now and continuing indefinitely. Determine the capitalized cost at 8% per year.arrow_forwardDue to the high crime rate in the city center, the state council in partnership with the police has installed CCTV in several “hotspot” areas. The installation of the CCTV cost USD1000000. The cost of CCTV maintenance in the first year is USD500,000, USD700000 in the second year, USD950000 in the third year, USD990000 in the fourth year and costs are realized at the end of each year. On the other hand, the installation of CCTV will help to reduce crime in that area and is predicted to bring about a benefit of USD2000000 for the first and second year and a benefit of USD 3000000 for the third and fourth year. At the end of the fourth year, the CCTV will be replaced by a new one and it can be resold as second hand for USD200000. Assume the discount rate of 3% is used. Calculate the present value of net benefits assuming that the benefits are realized at the beginning of each of the three years. Also, draw the timeline of benefits and costs.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education