Concept explainers
A
Interpretation: The cycle time required for output rate needs to be determined.
Concept Introduction: Constraint management is a process helpful to the personnel on focusing the task. As a result, the productivity and the profits also increased.
B
Interpretation: The minimum number of workstations required needs to be determined.
Concept Introduction: Constraint management is a process helpful to the personnel on focusing the task. As a result, the productivity and the profits also increased.
C
Interpretation: The efficiency and the balance delay need to be determined.
Concept Introduction: Constraint management is a process helpful to the personnel on focusing the task. As a result, the productivity and the profit also increased.
D
Interpretation: Increasing cycle time would increase theoretical minimum
Concept Introduction: Constraint management is a process helpful to the personnel on focusing the task. As a result, the productivity and the profits also increased.
Want to see the full answer?
Check out a sample textbook solutionChapter 5 Solutions
OPERATIONS MANAGEMENT LL PACKAGE
- What is the average number of extension lines that will be busy if your recommendation in part (a) is used? Round your answer to four decimal places. L = ?arrow_forwardA manager wants to assign tasks to workstations as efficiently as possible and achieve an hourly output of 331/3 units. Assume the shop works a 60-minute hour. Assign the tasks shown in the accompanying precedence diagram (times are in minutes) to workstations using the following rules: A. In order of most following tasks. Tiebreaker: greatest positional weight. Work Station Task I II III IV b. In order of greatest positional weight. Tiebreaker: most following tasks. Work Station Tasks I II III IV c. What is the efficiency? (Round your answer to 2 decimal places.) Efficiency _________%arrow_forwardAssign the 4 departments in Table X to locations A, B, C, and D, which are separated by the distances shown in Table y, in such a way that transportation cost is minimized. Use this heuristic: assign departments with the greatest interdepartmental workflow first. See attached table. a.Fill up the table attached. b. Compute the total transportation cost if the cost to move one workload 1 meter apart is P5.00.arrow_forward
- Describe three strategies for expanding capacity. What are the advantages and disadvantages of incremental versus one-step expansion? Complete the problem and calculate the number of nonadjacent loads for the current layout and design an alternative layout to minimize the number of nonadjacent loads.arrow_forwardAnswers should have a minimum of 300 words per item. Briefly describe at least three (3) Facility Layouts, and indicate the kinds of situations in which each would be used.arrow_forwardDraw the diagram and diagram of rectangles with all network calculations for the project shown in the table below, then answer the questions below.arrow_forward
- The three-station work cell at Pullman Mfg., Inc.is illustrated in Figure S7.8. It has two machines a t station I inparallel (i.e., the product needs to go through only one of the twomachines before proceeding to station 2). a) What is the throughput time of this work cell?b) What is the bottleneck time of this work cell?c) What is the bottleneck station?d) If the firm operates 8 hours per day, 6 days per week, what isthe weekly capacity of this work cell?arrow_forwardA: Which station is the bottleneck? The bottleneck is _______, with a total load of _____ minutes for the next month. B: Using the traditional method, which bases decisions solely on a product's contribution to profits and overhead, what is the optimal product mix and what is the overall profitability? Next, order the products from highest contribution margin to the lowest. The obtained sequence is asfollows: C: Using the bottleneck-based method, what is the optimal product mix and what is the overall profitability?arrow_forwardCollege chums Hannah Baltzan and Tyler Phillips are working on opening a third espressodrive-through stand in Highlands Ranch, Colorado, called Brewed Awakening. Their originaldrive-through stand, Jitters, and their second espresso stand, Bean Scene, have done wellin their current locations in Englewood, Colorado, five miles away. Since Hannah and Tylerwant to start with low overhead, they need assistance analyzing the data from the past yearon the different types of coffee and the amounts that they sold from both stands. Hannah andTyler would like a recommendation of the four top sellers to start offering when BrewedAwakening opens. They have provided you with the data file T3_JittersCoffee_Data.xls foryou to perform the analysis that will support your recommendation. Key Jitters = North Bean Scene = South Product Month Store Revenue Regular January North 4320 Regular February North 4500 Regular March North 3528 Regular April North 3960…arrow_forward
- The Sun River beverage company is a regional producer of teas, exotic juices, and energy drinks. With an interest in healthier lifestyles, there has been an increase in demand for its sugar-free formulation. The final packing operation requires 13 tasks. Sun River bottles its sugar-free product 5 hours a day, 5 days a week. Each week, there is a demand for 3,000 bottles of this product. TASK TIME (MINUTES) PRECEDING TASK 1 0.1 — 2 0.1 1 3 0.1 2 4 0.2 2 5 0.1 2 6 0.2 3, 4, 5 7 0.1 1 8 0.1 7 9 0.2 8 10 0.1 9 11 0.2 6 12 0.2 10, 11 13 0.1 12 Using the following data, solve the assembly-line balancing problem and calculate the efficiency of your solution. Use the longest task time for your decision criteria. Note: Round your answer to the nearest whole percent.arrow_forwardplease solve D only (a) What is the cycle time necessary to achieve the desired rate of production? =12min(b) Using the longest element rule, create workstations to balance the line,attempting to get as close as possible to the theoretical minimum numberof workstations.(c) What is the efficiency and idle time of the line balance? =72.22%(d) The company considers that if the lamps are successful with the publicit may need to increase production to 30,000 units. The company thinksthe simplest solution is to obtain two more production lines, thus havingtriple capacity. Another option is to re-balance the line. Considering thata single worker is assigned to a work station, determine which option(more production lines or re-balancing) yields the smallest labour size.arrow_forwardAs part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 250 units per 8-hour day. Task times and precedence relationships are as follows: Task Duration(minutes) ImmediatePredecessor a 0.5 - b 0.4 a c 0.5 b d 0.3 - e 1.8 d f 1.9 c g 2 e, f Do each of the following: a. Determine the number of followers for each task. (Please answer number of tasks following task for A-G)arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.