Refer back to Problem 16. Suppose that in addition to the usual precedence constraints, there are two zoning constraints within the trim line. First, work elements K and L should be assigned to the same station; both use a common component, and assigning them to the same station conserves storage space. Second, work elements H and J cannot be performed at the same station.

  1. Using trial and error, balance the line as best you can.
  2. What is the efficiency of your solution?

Blurred answer
Students have asked these similar questions
A final assembly plant for a certain automobile model is to have a capacity of 240,000 units annually. The plant will operate 50 weeks/yr, two shifts/day, 5 days/week, and 8.0 hours/shift. It will be divided into three departments: (1) Body shop, (2) paint shop, (3) trim-chassis-final department. The body shop welds the car bodies using robots, and the paint shop coats the bodies. Both of these departments are highly automated. Trim-chassis-final has no automation. There are 15.5 hours of direct labor content on each car in this department, where cars are moved by a continuous conveyor. Determine: (a) Hourly production rate of the plant, (b) number of workers and workstations required in trim-chassis-final if no automated stations are used, the average manning level is 2.5, balancing efficiency = 93%, proportion uptime = 95%, and a repositioning time of 0.15 min is allowed for each worker.
A bank recently finished construction of a new building in the downtown business district. You have been asked to help them arrange the various departments of its check processing division to minimize the workflow (Summation LxD) in its operations. The movement of checks between departments is shown in the table below. Department 4 (the check distribution department) must be in the room with the elevator. Only lateral movement is allowed (no diagonal movement allowed) from the center of one department to the center of the destination department. Each department is 50 feet x 50 feet. What is the Summation LxD of the recommended layout? 10,640 feet 15,960 feet 26,600 feet 38,800 feet None of the above   Which of the potential layouts shown above should be recommended to the bank management? (Below is the potential layouts)   Layout A Layout B Layout C Layout D None of the above
Consider a production line with five stations in serial. The stations have the following process times in minutes (or minutes/unit). Station 1's process time is 9 minutes/unit. Station 2's process time is 10 minutes/unit. Station three has two identical machines, each of which process a unit in 12 minutes (each unit only needs to be processed on one of the two machines). Station 4's process time is 5 minutes/unit. Station 5's process time is 8 minutes/unit. Which station is the bottleneck station?   a)  Station 3   b)  None of the other options   c)  Station 2   d)  Station 5

Additional Business Textbook Solutions

Find more solutions based on key concepts
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY