Concept explainers
Refer back to Problem 16. Suppose that in addition to the usual precedence constraints, there are two zoning constraints within the trim line. First, work elements K and L should be assigned to the same station; both use a common component, and assigning them to the same station conserves storage space. Second, work elements H and J cannot be performed at the same station.
- Using trial and error, balance the line as best you can.
- What is the efficiency of your solution?
Want to see the full answer?
Check out a sample textbook solutionChapter 5 Solutions
OPERATIONS MANAGEMENT LL PACKAGE
Additional Business Textbook Solutions
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
Business in Action (8th Edition)
Operations and Supply Chain Management 9th edition
OPERATIONS MANAGEMENT IN THE SUPPLY CHAIN: DECISIONS & CASES (Mcgraw-hill Series Operations and Decision Sciences)
Operations Management, Binder Ready Version: An Integrated Approach
- Is the capacity of the bottleneck larger than, equal to, or smaller than the capacity of the process?a. Larger thanb. Equal toc. Smaller thand. The answer depends on the specific process under consideration.arrow_forwardA furniture factory makes two types of wooden tables,large and small. See the flowchart below .Small tables are made in batches of 100, and large tables are made in batches of 50. A batch includes a fixed setup time for the entire batch at each process step and a run time for each piece in the batch. Both large and small tables have the same processing times. The capacities of each process step are given, and apply to production of either type of table, as shown in the flowchart. a. What is the capacity of the system, and what is thebottleneck? b. What are the throughput times for batches of large and small tables? c. When producing at a rate of six small tables per hour on average, how many tables will be in the system?arrow_forwardA product is completed when 18 tasks are done. These tasks are assigned to 6 workstations (each workstation handling several tasks) in an assembly line set up. All workstations work the same amount of time (= cycle time), and move the (partial) product to the next workstation, and repeat this process. The last workstation generates the finished product. We need 1200 units made every day (= 8 hours). If we run this line with a cycle time of 0.3 minutes, what is the most amount of work (in minutes) that can be done on this product? (Give the answer with one decimal place)arrow_forward
- A taxi charges P1.50 for the first 300 meters and P1 for every 200 meters thereafter. Any distance covering the next 200-meter zone is still charged P1. Make a flowchart and a C program that would input the DISTANCE a trip took and output the FEE.arrow_forwardA furniture factory makes two types of wooden tables,large and small. See the flowchart below.SetupTime,MinutesRun Timeper Piece,MinutesCapacity,Piecesper HourWood cutting 30 5 15Make four legs 60 10 10Make tops 60 12 8Finish the wood 20 8 12Assemble and ship 20 17 14 Small tables are made in batches of 100, and large tables are made in batches of 50. A batch includes a fixed setup time for the entire batch at each process step and a run time for each piece in the batch. Both large and small tables have the same processing times. The capacities of each process step are given, and apply to production of either type of table, as shown in the flowchart.a. What is the capacity of the system, and what is the bottleneck?b. What are the throughput times for batches of large and small tables?c. When producing at a rate of six small tables per hour on average, how many tables will be in the system?arrow_forwardA young mechanical engineer devised two different approaches to completing aproduction task. Both methods entail the purchase of the same working space as well asother capital equipment that will only be employed for this operation.A crew of three guys costing P30.00 per hour is required for Method A. This approachwill produce 10 units per hour, two of which will be rejects. Method B requires aworkforce of two workers, each of whom costs P35.00 per hour, to produce eight unitsper hour, one of which will be rejected. Each reject costs P20.00 because direct materialis lost. If a certain total number of units is to be produced, find which method iseconomical. DO NOT USE EXCEL, SOLVE USING FORMULAarrow_forward
- (Please do not give solution in image format thanku) Develope a 3 level work breakdwon structure (including level 1,2 and 3) the work break down structure is based on the following project. Improving Customer Service Response Time for a clothing company. additional informationa can be added to the work break down struture to create the different levels The motivation behind this project is to improve customer satisfaction by reducing response time for customer service inquiries. Currently, customers are waiting an average of 48 hours to receive a response to their inquiries, resulting in frustration and dissatisfaction. By implementing a new customer service ticketing system and training customer service agents on effective communication and problem-solving techniques, response time can be reduced to 24 hours or less.arrow_forwardWhich is most likely true about theory of constraints? a. The theory of constraints does not apply to companies with multiple products because of capacity measurement difficulties. b. In any profit-seeking company, there must be at least one constraint. c. Constraints or bottlenecks stop organizations from selling an infinite number of units or services. d. b & c e. All of the above f. None of the abovearrow_forwardThe following diagram describes a service system where customers go through either of the two parallel three-step processes (A1-A2-A3 or B1-B2-B3) and then merge into a single line for the final step (F4). Each step has one worker assigned to it (total of 7 workers). The numbers in parentheses are the times in minutes for each step of the process. ( see attached image) What is the capacity of the entire system in terms of customers per hour? Hint: Start with calculating hourly capacity of A1-A2-A3 and B1-B2-B3. How much will the system capacity change if a second worker is assigned to step F4?arrow_forward
- bama pie company's assembly line operations (the assembly line operates for six hundred minutes per day) comprise of eleven tasks, with the longest task time being 2.4 minutes and the shortest task time being 0.4 minutes; the sum of the task times is eighteen minutes. the firm is working on balancing its assembly line operations. the firm needs to produce 200 pies per day; to achieve this, the firm calculates the required cycle time as ---- minutes?arrow_forwardA machine cycle, also known as a process loop, comprises four components. Which aspects of machine cycles are most valued? Is it necessary to be concerned about replacing individual components of machine cycles? Does the addition of another module assist in resolving the problem of switching between modules?arrow_forwardConsider the following two production processes making an electronic component for a navigation system. Both processes consist of 20 stations and operate at a cycletime of 1 minute/unit. Their most error-prone operation is step 9:• Process 1 has a final inspection at the end of the process and has about 300 units of inventory between step 9 and the inspection.• Process 2 has each worker check the work of the previous steps and about 50 units ofinventory between step 9 and the end of the process, roughly equally distributed across theremainder of the process.What would be the information turnaround time for a defect made at station 9?arrow_forward