To explain: How Gemba walks are different than value stream mapping.
Case summary: In the given case, lean practitioners applied the Gemba technique of country J to stay in touch by getting the knowledge of all happenings in the factory building. This technique involves learning about work practices, coaching, training employees, and following up on issues that were discovered in past. To conduct a Gemba walk, there was no particular set of rules but it was regulated with the help of several general guidelines. An expert R warned that there was a mistake with technology which is wandering about the plant on a meet basis which can only bring empty praise to employees rather than taking time to understand the actual happening. Therefore, the correct use of this technology makes the managers and leaders able to stay in touch with various activities on the firm’s floor, which help them to make appropriate decisions.
Want to see the full answer?
Check out a sample textbook solutionChapter 14 Solutions
EBK OPERATIONS MANAGEMENT
- Continuous Flow vs. Departmental Manufacturing Mabbut Company has the following departmental manufacturing layout for one of its plants: A consulting firm recommended a value stream with the following manufacturing cell: Required: 1. Calculate the total time it takes to produce a batch of 10 units using the traditional departmental manufacturing layout. ________________________ fill in the blank 1 minutes 2. Using cellular manufacturing, how much time is saved producing the same batch of 10 units?_________________________fill in the blank 2 minutes Assuming the cell operates continuously, what is the production rate?_________________________fill in the blank 3 units per hour Which process controls this production rate? fullscreenExpand Transcribed Image Text Continuous Flow vs. Departmental Manufacturing Mabbut Company has the following departmental manufacturing layout for one of its plants: 5 minutes 10 minutes Wait time - 12 minutes Move and wait time - 20 minutes Cutting…arrow_forwardThe process of balancing an assembly line determines the ____ of the line. 1. Actual output 2. Efficiency 3. Utilizationarrow_forwardA regional bookstore chain is about to build a distributioncenter that is centrally located for its eight retail outlets.It will most likely employ which of the following tools ofanalysis?a) Assembly-line balancingb) Load–distance analysisc) Center-of-gravity modeld) Linear programminge) All of the abovearrow_forward
- Using the attached, please assist to develop warehousing strategies with layouts and designs that support cost saving objectives as well as storage system that will minimise the handling of the goods? The storage system should be focusing on movement and not storage.arrow_forwardWhat type of store layout arranges the counters and shelves in long rows? a. Loop layout b. Free-flow layout c. Grid-layout d. Spine layoutarrow_forwardOPERATION OF MANUFACTURING SYSTEM HOW to use an Algebraic Approach to optimize SCM model with distributor and retailer? Mathematical modelling should be included?arrow_forward
- A machine cycle, also known as a process loop, comprises four components. Which aspects of machine cycles are most valued? Is it necessary to be concerned about replacing individual components of machine cycles? Does the addition of another module assist in resolving the problem of switching between modules?arrow_forwardPrevar Corporation currently purchases components from one of its suppliers. The current purchase price is $1500 per component, with annual purchase volume of 750 units. The ops manager believes that this component could be made inhouse with some minor modifications to the current factory set up. Fixed cost for dedicating a line for this component is estimated at $50,000. Raw materials for the component is estimated at $900, overhead at $200 and it would take 10 hours of labor (at $20 per hour) to produce each component.arrow_forwardDESIGN or DRAW a high level “as-is” process diagram depicting how a trade would be made, under "Manager Investment Strategist in Finance department involved in Broker business". The diagram should be for the model showing the bands, process flows, roles, decisions and/or cross functional interactions required. As a swimlane diagram.arrow_forward
- What is the importance of resource configuration for value creation?arrow_forwardThe factory also implements a Total Productive Maintenance (TPM) program and begins to transfer several maintenance tasks to the operators. What are three maintenance tasks that can be easily transferred to operators?arrow_forwardAssume you are going to manage the lean six sigma project regarding the Algonquin College registration process (both online and in-person). Draw a high-level "Cross-Functional" flowchart of this process.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.