Summary Introduction
To explain:
Develop a Pareto chart to analyze the type of management failure to be eliminated first.
Introduction:
Company P is a pioneer in the manufacture of plastic-grade films, which are used to wrap eatable materials. Goods of the company P facing the rejection due to the various reasons. A Pareto chart refers to the chart that has bar and line graphs. In the Pareto chart, individual value is represented by bars and the total value is represented by the line.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Plastomer, Inc. specializes in the manufacture of high-grade plastic film used to wrap food products. Film is rejected and scrapped for a variety of reasons (e.g., opacity, high carbon content, incorrect thickness or gauge, scratches, and so on). During the past month, management collected data on the types of rejects and the amount of scrap generated by each type. The results are given in the following table. Compute percent of total amount for each type of failure to complete the table. (Enter your responses as percents rounded to one decimal place.)
LOADING...
Type of Failure
Amount of Scrap (lbs.)
Percent of Total Amount
1
Air bubbles
500
enter your response here%
2
Bubble breaks
25,500
enter your response here%
3
Carbon content
250
enter your response here%
4
Unevenness
3,680
enter your response here%
5
Thickness or…
Plastomer, Inc., specializes in the manufacture of high-grade plastic film used to wrap food products. Film is rejected and scrapped for a variety of reasons (e.g., opacity, high carbon content, incorrect thickness or gauge, scratches, etc.). During the past month, management collected data on the types of rejects and the amount of scrap generated by each type. The following table presents the results:Draw a Pareto chart to identify which type of failure management should attempt to eliminate first.
Plastomer, Inc., specializes in the manufacture of high-grade plastic film used to wrap food products. Film is rejected and scrapped for a variety of reasons (e.g., opacity, high carbon content, incorrect thickness or gauge, scratches, etc.). During the past month, management collected data on the types of rejects and the amount of scrap generated by each type. The following table presents the results:
Type of Failure
Amount of Scrap (lbs.)
Air bubbles Bubble breaks Carbon content Unevenness Thickness or gaugeOpacity ScratchesTrim Wrinkles
50019,6501503,81027,6004503,84050010,650
Draw a Pareto chart to identify which type of failure management should attempt to eliminate first.
Chapter 2 Solutions
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Ch. 2 - Prob. 3DQCh. 2 - Prob. 4DQCh. 2 - Consider the range of processes in the financial...Ch. 2 - Prob. 6DQCh. 2 - Continuous improvement recognizes that many small...Ch. 2 - Prob. 8DQCh. 2 - Paul O’Neill, former U.S. Treasury Secretary,...Ch. 2 - Dr. Gulakowicz is an orthodontist. She estimates...Ch. 2 - Two different manufacturing processes are being...Ch. 2 - The operations manager at Sebago Manufacturing is...
Ch. 2 - Consider the Custom Molds, Inc., case at the end...Ch. 2 - Founded in 1970, ABC is one of the world’s...Ch. 2 - Prepare a flowchart of the field service division...Ch. 2 - Big Bob’s Burger Barn would like to graphically...Ch. 2 - Prob. 10PCh. 2 - Suppose you are in charge of a large mailing to...Ch. 2 - Diagrams of two self-service gasoline stations,...Ch. 2 - Prob. 13PCh. 2 - Prob. 14PCh. 2 - A time study of an employee assembling peanut...Ch. 2 - Prob. 18PCh. 2 - Prob. 19PCh. 2 - Prob. 20PCh. 2 - Prob. 21PCh. 2 - Prob. 22PCh. 2 - Prob. 23PCh. 2 - Smith, Schroeder, and Torn (SST) is a short-haul...Ch. 2 - Prob. 25PCh. 2 - Prob. 26PCh. 2 - Prob. 27PCh. 2 - Prob. 28PCh. 2 - Prob. 29PCh. 2 - Prob. 30PCh. 2 - Prob. 31PCh. 2 - Prob. 32PCh. 2 - Prob. 33PCh. 2 - Prob. 1AMECh. 2 - What percentage of overall complaints do the three...Ch. 2 - Prob. 3AMECh. 2 - Prob. 1VCCh. 2 - What are the benefits that the POI program can...Ch. 2 - Prob. 3VCCh. 2 - What are the major issues facing Tom and Mason...Ch. 2 - Prob. 1.2CCh. 2 - Prob. 1.3CCh. 2 - Prob. 2.1CCh. 2 - Prob. 2.2CCh. 2 - Prob. 2.3C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months: Month 1 2 3 4 Quality control measures: Number of defects 201 179 140 98 Number of warranty claims 62 55 46 43 Number of customer complaints 118 112 95 74 Material control measures: Purchase order lead time 10 days 9 days 7 days 5 days Scrap as a percent of total cost 1% 1% 2% 3% Machine performance measures: Machine downtime as a percentage of availability 5% 6% 6% 10% Use as a percentage of…arrow_forward1. The leader in the quality movement who recommended that organizations "eliminate numerical quotas for the work force and numerical goals for management.": A. Juran B. Ishikaw C. Crosby D. Feigenbaum E. Taguchi F. none of the above 2. The quality leader responsible for the term Total Quality Management (TQM): A. Juran B. Ishikawa C. Crosby D. Feigenbaum E. Taguchi F. none of the above 3. The quality leader most associated with the concept of robustness: A. Juran B. Ishikawa C. Crosby D. Feigenbaum TOTAL QUALITY MANAGEMENT-MBA EXAMINER:GATarrow_forward2.49. County school buses are inspected every month for “defects.” In a recent monthly inspection, 27 worn or torn seats were found, 22 buses had dirty floors, there were 14 cases of exterior scratches and chipped paint, there were 8 cracked or broken windows, the engines on 4 buses had trouble starting or were not running smoothly, and 2 buses had faulty brakes. Develop a Pareto chart for the bus inspections and indicate the most significant quality-problem categories. What does this tell you about the limitations of applying Pareto chart analysis? How might these limitations be overcome in Pareto chart analysis?arrow_forward
- Django Industries conducted an appraisal of all costs associated with production and found the following data. Scheduled maintenance $35,000 Machine downtime $160,000 Annual equipment calibration $39,000 Warranty exchange $125,000 Supplier quality audits $75,000 Equipment repair $56,000 Customer field repairs $97,000 Incoming material audits $80,000 Categorize these costs into the traditional four types of quality costs. What is the cumulative percentage of the two highest categories? a. 70.2% b. 65.6% c. 68.4% d. 71.8%arrow_forwardselect any company and do the following Quality Improvement Process for it :———————————————————————————————————————–You have requested by your manager to establish a team and to start a quality improvement process that will improve either product, service or an activity.Using the FOCUS PDCA Quality Improvement Mythology and the famous Quality Tools:Identify a Problem Statement and Mission StatementIdentify a problem (using a brainstorming and NGT)Identify a team (using a Flow Chart)Identify a priority area to improve ( using Decision Matrix)Identify a cause and effect (root cause analysis) between this area and its causes (using Fishbone Diagram)Make sure the problem or the opportunity of concern is in place and need improvement (using a Check…arrow_forwardQuality assurance is an important aspect of any business. This case study is based on Lyman Limited, a company that manufactures and sells office furniture. They obtain their parts (hinges, chair wheels, etc.) from three different suppliers, A, B and C. Past experience has shown that 20% of the parts are supplied by A, 50% are supplied by B and the rest are supplied by C. It is also known that 10% of the parts supplied by A are defect, 8% of the parts from B are defect and 6% of the parts from C are defect. A part is randomly selected during a quality assurance test and is found to be defective. Calculate the probability that it was supplied by supplier B.arrow_forward
- Explain the measures that should be taken to institute successful quality improvement ?arrow_forwardTombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months: Month 1 2 3 4 Quality control measures: Number of defects 185 163 124 91 Number of warranty claims 46 39 30 27 Number of customer complaints 102 96 79 58 Material control measures: Purchase order lead time 8 days 7 days 5 days 4 days Scrap as a percent of total cost 1% 1% 2% 3% Machine performance measures: Machine downtime as a percentage of availability 3% 4% 4% 6% Use as a percentage of availability…arrow_forwardIn the design of their controls in year 1, Trinity relied on a practice-based, bottom up approach. What were the strengths and weaknesses of this approach? How effective was it? What would you recommend they should have done differently?arrow_forward
- Explain and understand tools that can be used to detect and correct quality problems?arrow_forwardDescribe what is the reduction of variability in quality management and discuss what are the positive aspects of it?arrow_forwardScenario: Quality assurance is an important aspect of any business. This case study is based on Lyman Limited, a company that manufactures and sells office furniture. They obtain their parts (hinges, chair wheels, etc.) from three different suppliers, A, B and C. Past experience has shown that 20% of the parts are supplied by A, 50% are supplied by B and the rest are supplied by C. It is also known that 10% of the parts supplied by A are defect, 8% of the parts from B are defect and 6% of the parts from C are defect. Question: Workers at Lyman Limited arrive at work at an average rate of 8 workers per hour. Assuming the arrival times follow a Poisson distribution, calculate the probability that a manager will observe the following:a) exactly 6 workers arriving in a given hour.b) at least 2 workers arriving in a 15-minute period.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.