Chapter 4, Problem 20P

a:

To determine

Calculate the present worth.

b:

To determine

Calculate the present worth through spreadsheet.

Blurred answer
Students have asked these similar questions
Two methods can be used for producing solar panels for electric power generation. Method 1 will have an initial cost of $550,000, an AOC of $160,000 per year, and $125,000 salvage value after its 3-year life. Method 2 will cost $830,000 with an AOC of $120,000, and a $240,000 salvage value after its 5-year life. Assume your boss asked you to determine which method is better, but she wants the analysis done over a 3-year planning period. You estimate the salvage value of method 2 will be 35% higher after 3 years than it is after 5 years. If the MARR is 10% per year, which method should the company select
In order to provide drinking water as part of its 50-year plan, a west coast city is considering constructing a pipeline for importing water from a nearby community that has a plentiful supply of brackish ground water. A full-sized pipeline can be constructed at a cost of $122 million now. Alternatively, a smaller pipeline can be constructed now for $80 million and enlarged 20 years from now for another $100 million. The pumping cost will be $25,000 per year higher for the smaller pipeline during the first 20 years, but will be approximately the same thereafter. Both pipelines are expected to have the same useful life with no salvage value. (a) At an interest rate of 6% per year, which alternative is more economical? (b) Write the spreadsheet function to display the PW for the smaller pipeline alternative.
Two methods can be used to produce solar panels for electric power generation. Method 1 will have an initial cost of $800,000, an AOC of $150,000 per year, and $125,000 salvage value after its 3-year life. Method 2 will cost $910,000 with an AOC of $125,000 and a $230,000 salvage value after its 5-year life. Assume your boss asked you to determine which method is better, but she wants the analysis done over a three-year planning period. You estimate the salvage value of Method 2 will be 40% higher after three years than it is after five years. If the MARR is 14% per year, which method should the company select?   Which method should the company select?

Chapter 4 Solutions

Basics Of Engineering Economy

Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
ENGR.ECONOMIC ANALYSIS
Economics
ISBN:9780190931919
Author:NEWNAN
Publisher:Oxford University Press
Text book image
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Text book image
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Text book image
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Text book image
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Text book image
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education