Summary Introduction
To determine: Average Outgoing Quality (AOQ).
Introduction: AOQ is the average quality of outgoing lots, which would be considered as the function of fraction defective. Both rejected and accepted lots would be included in outgoing lots.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
In an acceptance sampling plan developed for lots
containing 1,000 units, the sample size n is 85. The percent defec-tive of the incoming lots is 2%, and the probability of acceptance
is 0.64. What is the average outgoing quality?
In an acceptance sampling plan developed for lotscontaining I ,000 units, tbe sample size n is 85. The percent defectiveof the incoming lots is 2%, and the probability of acceptanceis 0.64. What is the average outgoing quality?
In an acceptance sampling plan developed for lotscontaining 1,000 units, the sample size n is 85. The percentdefective of the incoming lots is 2%, and the probability ofacceptance is 0.64. What is the average outgoing quality
Chapter 6 Solutions
Principles of Operations Management: Sustainability and Supply Chain Management, Student Value Edition (10th Edition)
Ch. 6.S - Prob. 1DQCh. 6.S - Define in statistical control.Ch. 6.S - Prob. 3DQCh. 6.S - Prob. 4DQCh. 6.S - Prob. 5DQCh. 6.S - Prob. 6DQCh. 6.S - Prob. 7DQCh. 6.S - Prob. 8DQCh. 6.S - Prob. 9DQCh. 6.S - Prob. 10DQ
Ch. 6.S - Prob. 11DQCh. 6.S - Prob. 12DQCh. 6.S - Prob. 13DQCh. 6.S - Prob. 14DQCh. 6.S - Prob. 15DQCh. 6.S - Prob. 16DQCh. 6.S - Prob. 17DQCh. 6.S - Prob. 18DQCh. 6.S - Prob. 19DQCh. 6.S - Prob. 1PCh. 6.S - Prob. 2PCh. 6.S - Prob. 3PCh. 6.S - Prob. 4PCh. 6.S - Prob. 5PCh. 6.S - Prob. 6PCh. 6.S - Prob. 7PCh. 6.S - Prob. 8PCh. 6.S - Prob. 9PCh. 6.S - Prob. 10PCh. 6.S - Prob. 11PCh. 6.S - Prob. 12PCh. 6.S - Prob. 13PCh. 6.S - Prob. 14PCh. 6.S - Prob. 15PCh. 6.S - Prob. 16PCh. 6.S - Prob. 17PCh. 6.S - Prob. 18PCh. 6.S - Prob. 19PCh. 6.S - Prob. 20PCh. 6.S - Prob. 21PCh. 6.S - Prob. 22PCh. 6.S - Prob. 23PCh. 6.S - Prob. 24PCh. 6.S - Prob. 25PCh. 6.S - Prob. 26PCh. 6.S - Prob. 27PCh. 6.S - Prob. 40PCh. 6.S - Prob. 41PCh. 6.S - Prob. 42PCh. 6.S - Prob. 43PCh. 6.S - Prob. 44PCh. 6.S - Prob. 45PCh. 6.S - Prob. 51PCh. 6.S - Prob. 52PCh. 6.S - Prob. 53PCh. 6.S - Prob. 54PCh. 6.S - Prob. 55PCh. 6.S - Prob. 1CSCh. 6.S - Prob. 2CSCh. 6.S - Prob. 1.1VCCh. 6.S - Prob. 1.2VCCh. 6.S - Prob. 1.3VCCh. 6.S - Prob. 2.1VCCh. 6.S - Select two potential problems-one in the Darden...Ch. 6.S - Prob. 2.3VCCh. 6.S - Prob. 2.4VCCh. 6 - Prob. 1EDCh. 6 - Prob. 1DQCh. 6 - Prob. 2DQCh. 6 - Prob. 3DQCh. 6 - Prob. 4DQCh. 6 - Prob. 5DQCh. 6 - Prob. 6DQCh. 6 - Prob. 7DQCh. 6 - Prob. 8DQCh. 6 - Prob. 9DQCh. 6 - Prob. 10DQCh. 6 - Prob. 11DQCh. 6 - Prob. 12DQCh. 6 - Prob. 13DQCh. 6 - Prob. 14DQCh. 6 - Prob. 15DQCh. 6 - Prob. 16DQCh. 6 - Prob. 17DQCh. 6 - Prob. 18DQCh. 6 - An avant-garde clothing manufacturer runs a series...Ch. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Kathleen McFaddens restaurant in Boston has...Ch. 6 - Prob. 6PCh. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10PCh. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 1CSCh. 6 - Prob. 2CSCh. 6 - Prob. 3CSCh. 6 - Prob. 1.1VCCh. 6 - Prob. 1.2VCCh. 6 - Prob. 1.3VCCh. 6 - Prob. 1.4VCCh. 6 - Prob. 2.1VCCh. 6 - Prob. 2.2VCCh. 6 - Prob. 2.3VCCh. 6 - Prob. 2.4VCCh. 6 - Prob. 3.1VCCh. 6 - Prob. 3.2VCCh. 6 - Prob. 3.3VCCh. 6 - Prob. 3.4VCCh. 6 - Prob. 3.5VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- 6. The defect rate for your product has historically been about 4.50%. For a sample size of 500, the upper and lower 3-sigma control chart limits are: Part 2 UCLp = _______ (enter your response as a number between 0 and 1, rounded to four decimal places). The Standard deviation of defect rate of product is given __________. The Upper and Lower 3-sigma control charts limits are: UCLp ________ LCLp ________arrow_forwardUsing samples of 200 credit card statements, an auditor found the following:Sample 1 2 3 4Number with errors 4 2 5 9a. Determine the fraction defective in each sample.b. If the true fraction defective for this process is unknown, what is your estimate of it?c. What is your estimate of the mean and standard deviation of the sampling distribution of fractions defective for samples of this size?d. What control limits would give an alpha risk of .03 for this process?e. What alpha risk would control limits of .047 and .003 provide?f. Using control limits of .047 and .003, is the process in control?g. Suppose that the long-term fraction defective of the process is known to be 2 percent. What arethe values of the mean and standard deviation of the sampling distribution?h. Construct a control chart for the process, assuming a fraction defective of 2 percent, using twosigma control limits. Is the process in control?arrow_forwardAt Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its lengthis between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49inches and a standard deviation of 0.014 inches. A) Is the process capable of meeting specifications? B) Does the process meet specifications?arrow_forward
- Using samples of 200 credit card statements, an auditor found the following: Sample 1 2 3 4 Number with errors 4 2 5 9 a. Determine the fraction defective in each sample. b. If the true fraction defective for this process is unknown, what is your estimate of it? c. What is your estimate of the mean and standard deviation of the sampling distribution of fractions defective for samples of this size? d. What control limits would give an alpha risk of .03 for this process? Page 457 e. What alpha risk would control limits of .047 and .003 provide? f. Using control limits of .047 and .003, is the process in control? g. Suppose that the long-term fraction defective of the process is known to be 2 percent. What are the values of the mean and standard deviation of the sampling distribution? h. Construct a control chart for the process, assuming a fraction defective of 2 percent, using two-sigma control limits. Is the process in control? Can you show me the steps and formulas using excelarrow_forwardA lot 5% defective is submitted to a single sampling plan with rectifying inspection,N=500, n=120, c=3. What is average outgoing quality?arrow_forwardSuppose that a quality characteristic is normally distributed with specifications at 100 ± 20. The process standard deviation is 6.(a) Suppose that the process mean is 100. What are the natural tolerance limits? Calculate Cp and Cpk and interpret these ratios. What fraction of parts do you expect to be defective?(b) Suppose that the process mean is 106. What are the natural tolerance limits? What is thefraction defective? Calculate Cp and Cpk and interpret these ratios.arrow_forward
- You want to determine the control lines for a "p" chart for quality control purposes. If the total number of defects from all samples is 2,500, the number of samples is 100, and the sample size is 40, which of the following would be the standard deviation used in developing the control lines? Answers: 0.0484 0.2499 0.00687 0.00707 0.00765arrow_forwardAt Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its length is between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49 inches and a standard deviation of 0.014 inches. a) is the process capable of meeting specifications? b) Does the process meet specifications?arrow_forwardA new process is started, and the sum of the sample standard deviations for 25 subgroups of size 4 is 750. If the specifications are 700 +_ 80, what is the process capability index? What action would you recommend?arrow_forward
- An operator wants to determine the standard deviation for a machine she operates. To do this, she wants to create a p-chart. Over a month's time, she collects 30 samples of 75 observations each and records the number of errors. The average proportion defective is found to be 0.024. Which of the following is the standard deviation () of the machine? a. More than 0.5 but less than or equal to 1.0 b. More than 1.0 c. Less than or equal to 0.1 d. More than 0.1 but less than or equal to 0.5arrow_forwardThe specification limits for a product are 9.9 cm and 12.35 cm. A process that produces the product has a mean of 11.18 cm and a standard deviation of 0.52 cm. What is the process capability, Cpk? a. 0.8205 b. 1.571 c. 0.7853 d. 0.75arrow_forwardUsing samples of 197 credit card statements, an auditor found the following: Sample 1 3 errors Sample 2 3 errors Sample 3 5 errors Sample 4 9 errors 1. what alpha risk would control limits of .0470 and .0038 provide? 2. Using control limits of .0470 and .0038, is the process in control? 3. Construct a control chart for the process, assuming a fraction defective of 2 percent, using two-sigma control limits. Is the process in control?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.