![Accounting Information Systems](https://www.bartleby.com/isbn_cover_images/9781133934400/9781133934400_largeCoverImage.gif)
Accounting Information Systems
9th Edition
ISBN: 9781133934400
Author: James A. Hall
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Question
Chapter 7, Problem 4ICC
a.
To determine
Make a data flow diagram of the current system.
b.
To determine
Make a system flowchart of the existing system.
c.
To determine
Describe the risks associated with the current system.
d.
To determine
Explain the changes needed to reduce the risks.
Expert Solution & Answer
![Check Mark](/static/check-mark.png)
Want to see the full answer?
Check out a sample textbook solution![Blurred answer](/static/blurred-answer.jpg)
Students have asked these similar questions
Rick Pines and Joe Lopez are the plant managers for High Mountain Lumber’s particle board division. High Mountain Lumber has adopted a just-in-time management philosophy. Each plant combines wood chips with chemical adhesives to produce particle board to order, and all product is sold as soon as it is completed. Laura Green is High Mountain Lumber’s regional controller. All of High Mountain Lumber’s plants and divisions send Green their production and cost information. While reviewing the numbers of the two particle board plants, she is surprised to find that both plants estimate their ending Work-in-Process Inventories at 75% complete, which is higher than usual. Green calls Lopez, whom she has known for some time. He admits that to ensure their division would meet its profit goal and that both he and Pines would make their bonus (which is based on division profit), they agreed to inflate the percentage completion. Lopez explains, “Determining the percent complete always requires…
Rick Pines and Joe Lopez are the plant managers for High Mountain Lumber’s particleboard division. High Mountain Lumber has adopted a just-in-time management philosophy. Each plant combines wood chips with chemical adhesives to produce particle board to order, and all product is sold as soon as it is completed. Laura Green is High Mountain Lumber’s regional controller. All of High Mountain Lumber’s plants and divisions send Green their production and cost information. While reviewing the numbers of the two particleboard plants, she is surprised to find that both plants estimate their ending Work-in-Process Inventories at 75% complete, which is higher than usual. Green calls Lopez, whom she has known for some time. He admits that to ensure their division would meet its profit goal and that both he and Pines would make their bonus (which is based on division profit), they agreed to inflate the percentage completion. Lopez explains, “Determining the percent complete always requires…
Universal Power Machinery (MUP) designs and manufactures specialized equipment for a wide range of industries. For a number of years the company's maintenance division, which has been organized as a cost centre, has provided services free of charge to the company's user departments (production, distribution, research, marketing, and so forth).
During the last three years, requests for maintenance have increased considerably and as a result of that, quality and timeliness of services provided are becoming a significant issue. In response to that issue, the top management established a task force to review the maintenance division operations. The task force recommended the maintenance division to be converted from a cost center to a profit center and the use of a charge-back system for the maintenance services (i.e. users to be billed for services performed).
Required:
How should the manager of the maintenance division be evaluated (i.e. as a cost centre)?
If the company switches the…
Chapter 7 Solutions
Accounting Information Systems
Ch. 7 - Prob. 1RQCh. 7 - Prob. 2RQCh. 7 - Distinguish between continuous, batch, and...Ch. 7 - Prob. 4RQCh. 7 - What are the primary determinants for both...Ch. 7 - What are the objectives of inventory control in...Ch. 7 - Prob. 7RQCh. 7 - What documents are needed for cost accounting...Ch. 7 - What types of management reports are prepared by...Ch. 7 - What document signals the completion of the...
Ch. 7 - Prob. 11RQCh. 7 - Prob. 12RQCh. 7 - Prob. 13RQCh. 7 - What is meant by the statement Inventories...Ch. 7 - What are the primary goals of lean manufacturing?Ch. 7 - Distinguish between activities and cost objects in...Ch. 7 - Differentiate between essential and nonessential...Ch. 7 - Prob. 18RQCh. 7 - Define computer-integrated manufacturing.Ch. 7 - Prob. 20RQCh. 7 - Discuss the importance of the move ticket to the...Ch. 7 - How realistic are the assumptions of the economic...Ch. 7 - Explain why the economic order quantity is the...Ch. 7 - Supervisors in the work centers oversee the usage...Ch. 7 - Prob. 5DQCh. 7 - Prob. 6DQCh. 7 - Prob. 7DQCh. 7 - How does automation help achieve manufacturing...Ch. 7 - Prob. 9DQCh. 7 - How can poor quality be expensive to the firm,...Ch. 7 - Discuss how an emphasis on financial performance...Ch. 7 - Prob. 12DQCh. 7 - How are cost structures fundamentally different...Ch. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Discuss the advantages of activity-based costing.Ch. 7 - Discuss the disadvantages of activity-based...Ch. 7 - Explain why traditional cost allocation methods...Ch. 7 - Explain the concept of a product family and its...Ch. 7 - Explain the relationship between MRP II and ERP.Ch. 7 - Prob. 1MCQCh. 7 - Which of the following statements regarding...Ch. 7 - Refer to the equation for the EOQ in the text. Car...Ch. 7 - Prob. 4MCQCh. 7 - Prob. 5MCQCh. 7 - Prob. 6MCQCh. 7 - Which of the following is NOT a problem associated...Ch. 7 - Which of the following is NOT a principle of lean...Ch. 7 - Prob. 9MCQCh. 7 - Prob. 10MCQCh. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - ZERO DEFECTS PROCESS Northern Tractor is a...Ch. 7 - ACTIVITY DRIVERS Cut It Up, Inc., is a...Ch. 7 - LEAN MANUFACTURING PRINCIPLES Write an essay...Ch. 7 - Prob. 1ICCCh. 7 - Prob. 2ICCCh. 7 - Prob. 3ICCCh. 7 - Prob. 4ICCCh. 7 - Prob. 5ICC
Knowledge Booster
Similar questions
- Comm Devices (CD) is a division of Worldwide Communications, Inc. CD produces restaurant pagers and other personal communication devices. These devices are sold to other Worldwide divisions, as well as to other communication companies. CD was recently approached by the manager of the Personal Communications Division regarding a request to make a special emergency- response pager designed to receive signals from anywhere in the world. The Personal Communications Division has requested that CD produce 12,000 units of this special pager. The following facts are available regarding the Comm Devices Division. Selling price of standard pager Variable cost of standard pager Additional variable cost of special pager For each of the following independent situations, calculate the minimum transfer price, and determine whether the Personal Communications Division should accept or reject the offer. (a) The Personal Communications Division has offered to pay the CD Division $105 per pager. The CD…arrow_forwardJohn Thomas, vice president of Mallett Company (a producer of a variety of plastic products), has been supervising the implementation of an ABC management system. John wants to improve process efficiency by improving the activities that define the processes. To illustrate the potential of the new system to the president, John has decided to focus on two processes: production and customer service. Within each process, one activity will be selected for improvement: materials usage for production and sustaining engineering for customer service (sustaining engineers are responsible for redesigning products based on customer needs and feedback). Value-added standards are identified for each activity. For materials usage, the value-added standard calls for six pounds per unit of output (the products differ in shape and function, but their weight is uniform). The value-added standard is based on the elimination of all waste due to defective molds. The standard price of materials is 5 per pound. For sustaining engineering, the standard is 58% of current practical activity capacity. This standard is based on the fact that about 42% of the complaints have to do with design features that could have been avoided or anticipated by the company. Current practical capacity (at the end of 20X1) is defined by the following requirements: 6,000 engineering hours for each product group that has been on the market or in development for 5 years or less and 2,400 hours per product group of more than 5 years. Four product groups have less than 5 years experience, and 10 product groups have more. Each of the 24 engineers is paid a salary of 60,000. Each engineer can provide 2,000 hours of service per year. No other significant costs are incurred for the engineering activity. Actual materials usage for 20X1 was 25% above the level called for by the value-added standard; engineering usage was 46,000 hours. A total of 80,000 units of output were produced. John and the operational managers have selected some improvement measures that promise to reduce nonvalue-added activity usage by 40% in 20X2. Selected actual results achieved for 20X2 are as follows: The actual prices paid for materials and engineering hours are identical to the standard or budgeted prices. Required: 1. For 20X1, calculate the nonvalue-added usage and costs for materials usage and sustaining engineering. 2. CONCEPTUAL CONNECTION Using the budgeted improvements, calculate the expected activity usage levels for 20X2. Now, compute the 20X2 usage variances (the difference between the expected and actual values), expressed in both physical and financial measures, for materials and engineering. Comment on the companys ability to achieve its targeted reductions. In particular, discuss what measures the company must take to capture any realized reductions in resource usage.arrow_forwardKarlAuto Corporation manufactures automobiles, vans, and trucks. Among the various KarlAuto plants around the United States is the Bloomington plant, where vinyl covers and upholstery fabric are sewn. These are used to cover interior seating and other surfaces of KarlAuto products. Pam Teegin is the plant manager for the Bloomington cover plantthe first KarlAuto plant in the region. As other area plants were opened, Teegin, in recognition of her management ability, was given the responsibility to manage them. Teegin functions as a regional manager, although the budget for her and her staff is charged to the Bloomington plant. Teegin has just received a report indicating that KarlAuto could purchase the entire annual output of the Bloomington cover plant from outside suppliers for 32 million. Teegin was astonished at the low outside price, because the budget for the Bloomington plants operating costs was set at 56.45 million. Teegin believes that the Bloomington plant will have to close down operations in order to realize the 24.45 million in annual cost savings. The budget (in thousands) for the Bloomington plants operating costs for the coming year follows: Additional facts regarding the plants operations are as follows: Due to the Bloomington plants commitment to use high-quality fabrics in all of its products, the Purchasing Department was instructed to place blanket orders with major suppliers to ensure the receipt of sufficient materials for the coming year. If these orders are canceled as a consequence of the plant closing, termination charges would amount to 18 percent of the cost of direct materials. Approximately 600 plant employees will lose their jobs if the plant is closed. This includes all direct laborers and supervisors as well as the plumbers, electricians, and other skilled workers classified as indirect plant workers. Some would be able to find new jobs, but many others would have difficulty. All employees would have difficulty matching the Bloomington plants base pay of 29.40 per hour, the highest in the area. A clause in the Bloomington plants contract with the union may help some employees; the company must provide employment assistance to its former employees for 12 months after a plant closing. The estimated cost to administer this service would be 1 million for the year. Some employees would probably elect early retirement because the company has an excellent pension plan. In fact, 4.6 million of next years pension expense would continue whether or not the plant is open. Teegin and her staff would not be affected by the closing of the Bloomington plant. They would still be responsible for administering three other area plants. Equipment depreciation for the plant is considered to be a variable cost and the units-of-production method is used to depreciate equipment; the Bloomington plant is the only KarlAuto plant to use this depreciation method. However, it uses the customary straight-line method to depreciate its building. Required: 1. Prepare a quantitative analysis to help in deciding whether or not to close the Bloomington plant. Explain how you treated the nonrecurring relevant costs. 2. Consider the analysis in Requirement 1, and add to it the qualitative factors that you believe are important to the decision. What is your decision? Would you close the plant? Explain. (CMA adapted)arrow_forward
- Quincy Farms is a producer of items made from farm products that are distributed to supermarkets. For many years, Quincys products have had strong regional sales on the basis of brand recognition. However, other companies have been marketing similar products in the area, and price competition has become increasingly important. Doug Gilbert, the companys controller, is planning to implement a standard costing system for Quincy and has gathered considerable information from his coworkers on production and direct materials requirements for Quincys products. Doug believes that the use of standard costing will allow Quincy to improve cost control and make better operating decisions. Quincys most popular product is strawberry jam. The jam is produced in 10-gallon batches, and each batch requires six quarts of good strawberries. The fresh strawberries are sorted by hand before entering the production process. Because of imperfections in the strawberries and spoilage, one quart of strawberries is discarded for every four quarts of acceptable berries. Three minutes is the standard direct labor time required for sorting strawberries in order to obtain one quart of strawberries. The acceptable strawberries are then processed with the other ingredients: processing requires 12 minutes of direct labor time per batch. After processing, the jam is packaged in quart containers. Doug has gathered the following information from Joe Adams, Quincys cost accountant, relative to processing the strawberry jam. a. Quincy purchases strawberries at a cost of 0.80 per quart. All other ingredients cost a total of 0.45 per gallon. b. Direct labor is paid at the rate of 9.00 per hour. c. The total cost of direct material and direct labor required to package the jam is 0.38 per quart. Joe has a friend who owns a strawberry farm that has been losing money in recent years. Because of good crops, there has been an oversupply of strawberries, and prices have dropped to 0.50 per quart. Joe has arranged for Quincy to purchase strawberries from his friends farm in hopes that the 0.80 per quart will put his friends farm in the black. Required: 1. Discuss which coworkers Doug probably consulted to set standards. What factors should Doug consider in establishing the standards for direct materials and direct labor? 2. Develop the standard cost sheet for the prime costs of a 10-gallon batch of strawberry jam. 3. Citing the specific standards of the IMA Statement of Ethical Professional Practice described in Chapter 1, explain why Joes behavior regarding the cost information provided to Doug is unethical. (CMA adapted)arrow_forwardReducir, Inc., produces two different types of hydraulic cylinders. Reducir produces a major subassembly for the cylinders in the Cutting and Welding Department. Other parts and the subassembly are then assembled in the Assembly Department. The activities, expected costs, and drivers associated with these two manufacturing processes are given below. Note: In the assembly process, the materials-handling activity is a function of product characteristics rather than batch activity. Other overhead activities, their costs, and drivers are listed below. Other production information concerning the two hydraulic cylinders is also provided: Required: 1. Using a plantwide rate based on machine hours, calculate the total overhead cost assigned to each product and the unit overhead cost. 2. Using activity rates, calculate the total overhead cost assigned to each product and the unit overhead cost. Comment on the accuracy of the plantwide rate. 3. Calculate the global consumption ratios. 4. Calculate the consumption ratios for welding and materials handling (Assembly) and show that two drivers, welding hours and number of parts, can be used to achieve the same ABC product costs calculated in Requirement 2. Explain the value of this simplification. 5. Calculate the consumption ratios for inspection and engineering, and show that the drivers for these two activities also duplicate the ABC product costs calculated in Requirement 2.arrow_forwardDetermine the total costs that each operating segment would be accountable for if the step method is used to allocate support costs; assume support departments are ranked according to their original cost. (Round intermediate calculations to 4 decimal places, e.g. 15.2516 and final answers to 2 decimal places, e.g. 15.25.) Total costs $ Operating Segments Institutional Taythank and Media. 776887.5 Retail 468712.5arrow_forward
- Shady Fabrication Group (SFG) manufactures components for manufacturing equipment at several facilities. The company produces two, related, parts at its Park River Plant, the models SF-08 and SF-48. The differences in the models are the quality of the materials and the precision to which they are produced. The SF-48 model is used in applications where the precision is critical and thus requires greater oversight in the production process. Although sales remain reasonably strong, managers at SFG have noticed that the company is meeting more resistance to the pricing for SF-08, although there seems to be little need for negotiation on the price of the SF-48 model. As a result, the marketing manager at SFG has asked the financial staff to review the costs of the two products to understand better what might be happening in the market. Manufacturing overhead is currently assigned to products based on their direct labor costs. For the most recent month manufacturing overhead was $201,600.…arrow_forwardShady Fabrication Group (SFG) manufactures components for manufacturing equipment at several facilities. The company produces two, related, parts at its Park River Plant, the models SF-08 and SF-48. The differences in the models are the quality of the materials and the precision to which they are produced. The SF-48 model is used in applications where the precision is critical and thus requires greater oversight in the production process. Although sales remain reasonably strong, managers at SFG have noticed that the company is meeting more resistance to the pricing for SF-08, although there seems to be little need for negotiation on the price of the SF-48 model. As a result, the marketing manager at SFG has asked the financial staff to review the costs of the two products to understand better what might be happening in the market. Manufacturing overhead is currently assigned to products based on their direct labor costs. For the most recent month manufacturing overhead was $183,600.…arrow_forwardShady Fabrication Group (SFG) manufactures components for manufacturing equipment at several facilities. The company produces two, related, parts at its Park River Plant, the models SF-08 and SF-48. The differences in the models are the quality of the materials and the precision to which they are produced. The SF-48 model is used in applications where the precision is critical and thus requires greater oversight in the production process. Although sales remain reasonably strong, managers at SFG have noticed that the company is meeting more resistance to the pricing for SF-08, although there seems to be little need for negotiation on the price of the SF-48 model. As a result, the marketing manager at SFG has asked the financial staff to review the costs of the two products to understand better what might be happening in the market. Manufacturing overhead is currently assigned to products based on their direct labor costs. For the most recent month manufacturing overhead was $208,800.…arrow_forward
- GroFast Company manufactures a high-quality fertilizer, which is used primarily by commercial veg-etable growers. Two departments are involved in the production process. In the Mixing Department, various chemicals are entered into production. After processing, the Mixing Department transfers a chemical called Chemgro to the Finishing Department. There the product is completed, packaged, and shipped under the brand name Vegegro. Various chemicals --> Mixing Dept (Chemgro)-->Finishing Dept (Vegegro) ---> In the Mixing Department, the raw material is added at the beginning of the process. Labor and overhead are applied continuously throughout the process. All direct departmental overhead is traced to the departments, and plant overhead is allocated to the departments on the basis of direct-labor. The plant overhead rate for 20x2 is $.40 per direct-labor dollar. The following information relates to production during November 20x2 in the Mixing Department. a. Work in process,…arrow_forwardShady Fabrication Group (SFG) manufactures components for manufacturing equipment at several facilities. The company produces two, related, parts at its Park River Plant, the models SF-08 and SF-48. The differences in the models are the quality of the materials and the precision to which they are produced. The SF-48 model is used in applications where the precision is critical and thus requires greater oversight in the production process. Although sales remain reasonably strong, managers at SFG have noticed that the company is meeting more resistance to the pricing for SF-08, although there seems to be little need for negotiation on the price of the SF-48 model. As a result, the marketing manager at SFG has asked the financial staff to review the costs of the two products to understand better what might be happening in the market. Manufacturing overhead is currently assigned to products based on their direct labor costs. For the most recent month manufacturing overhead was $212,400.…arrow_forwardLansing Electronics Inc. manufactures a variety of printers, scanners, and fax machines in itstwo divisions: the PSF Division and the Components Division. The Components Division produces electronic components that can be used by the PSF Division. All the components thisdivision produces can be sold to outside customers. However, from the beginning, nearly allof its output has been used internally. The current policy requires that all internal transfers ofcomponents be transferred at full cost.Recently, Cam DeVonn, the chief executive officer of Lansing Electronics, decided to investigate the transfer pricing policy. He was concerned that the current method of pricing internaltransfers might force decisions by divisional managers that would be suboptimal for the firm. Aspart of his inquiry, he gathered some information concerning Component Y34, which is usedby the PSF Division in its production of a basic scanner, Model SC67.The PSF Division sells 40,000 units of Model SC67 each year…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage LearningManagerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage LearningAccounting Information SystemsAccountingISBN:9781337619202Author:Hall, James A.Publisher:Cengage Learning,
![Text book image](https://www.bartleby.com/isbn_cover_images/9781305970663/9781305970663_smallCoverImage.gif)
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
![Text book image](https://www.bartleby.com/isbn_cover_images/9781337115773/9781337115773_smallCoverImage.gif)
Managerial Accounting: The Cornerstone of Busines...
Accounting
ISBN:9781337115773
Author:Maryanne M. Mowen, Don R. Hansen, Dan L. Heitger
Publisher:Cengage Learning
![Text book image](https://www.bartleby.com/isbn_cover_images/9781337619202/9781337619202_smallCoverImage.gif)
Accounting Information Systems
Accounting
ISBN:9781337619202
Author:Hall, James A.
Publisher:Cengage Learning,