(a)

Summary Introduction

Interpretation: A from-to Chart from the given information is to be designed.

Concept Introduction:

The from-to chart is a routing chart, usually made up of the matrix. The from-to chart is generally used to present the relationship between a set of points.

(b)

Summary Introduction

Interpretation: A From-to-chart by providing material handling cost per week between different departments is to be designed assuming that the cost of transporting goods 1 food is estimated to be $2.

Concept Introduction:

The from-to chart is a routing chart, usually made up of the matrix. The from-to chart is generally used to present the relationship between a set of points.

(c)

Summary Introduction

Interpretation: Designing a relationship activity chart for a given facility on the basis material handling cost obtained from the from-to chart from part (b) along with the ranking A,E,I,O, and U, where A is being allocated as the highest cost and U is the least.

Concept Introduction:

A relationship chart generally represents the relationship between different departments in an organization which is very important to consider while preparing a facility layout plan.

(d)

Summary Introduction

Interpretation: Whether a different layout is necessaryfor the given facility based on the result obtained from (b) and (c).

Concept Introduction:

Observation of a from-to chart and relationship chart is required to determine whether a different layout is necessary or not.

Blurred answer
Students have asked these similar questions
How do we identify the predecessor node column since it is not given by the customer? How do we figure the predecessor node? Plz solve it accurately and completely.
A business has 4 production hubs, A, B, C & D, in series with respective capacities in units/day- (i) Determine the bottleneck hub.(ii) Determine the system capacity(iii) Determine the system efficiency
By Monday April 16th the following towns will need the numbers of coal cars listed: coal valley 30 Coaltown 45 Coal Junction 25 Coalsburg 20 Using a railway city to city distance chart, the dispatcher constructs a mileage table on this page. Minimizing total miles over which cars are moved to new locations, compute the best shipment of coal cars.
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY