Principles of Highway Engineering and Traffic Analysi (NEW!!)
Principles of Highway Engineering and Traffic Analysi (NEW!!)
6th Edition
ISBN: 9781119305026
Author: Fred L. Mannering, Scott S. Washburn
Publisher: WILEY
bartleby

Concept explainers

Question
Book Icon
Chapter 4, Problem 10P
To determine

The probability that the pavement will have a PSI greater than 2.5 after 25years .

Blurred answer
Students have asked these similar questions
A rigid pavement is designed with a 10-inch slab,an Ec of 6 million lb/in^2, a concrete modulus of rupture of 432 lb/in^2, a load transfer coefficient of 3.0, an initial PSI of 4.7, and a terminal serviceability index of 2.5.The overall standard deviation is 0.35, the modulus of subgrade reaction is 190 lb/in^3, and a reliability of 90%is used along with a drainage coefficient of 0.8. The pavement is designed assuming traffic is composed entirely of trucks (100 per day). Each truck has one 20-kip single axle and one 42-kip tandem axle (the effect of all other vehicles is ignored). A section of this road is to be replaced (due to different subgrade characteristics)with a flexible pavement having a structural number of 4 and is expected to last the same number of years as the rigid pavement. What is the assumed soil resilient modulus? (Assume all other factors are the same as for the rigid pavement.)
B. A rigid pavement with a 10-inch slab thickness, 90 percent reliability, E. = 4 million lb/in², 600 lb/in² modulus of rupture, 150 lb/in³ modulus of subgrade reaction, a 2.8 load transfer coefficient, initial PSI of 4.8, final PSI of 2.5, overall standard deviation of 0.35, and a drainage coefficient of 0.8 is designed. The pavement's design life is 20 years. The three-lane road is built for vehicles with one 20,000-pound single axle, one 26,000-pound tandem axle, and one 34,000-pound triple axle. Calculate the projected daily truck traffic on the three lanes.
A flexible pavement has a SN of 4 (all drainage coefficients are equal to 1.0). The initial PSI is 4.7 and the terminal serviceability is 2.5. The soil has a CBR of 9. The overall standard deviation is 0.40 and the reliability is 95%. The pavement is currently designed for 1800 equivalent 18-kip single-axle loads per day. If the number of 18-kip single-axle loads were to increase by 30%, by how many years would the pavement's design life be reduced? For SN, please round-off to the nearest whole number if necessary
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning