Traffic and Highway Engineering
5th Edition
ISBN: 9781305156241
Author: Garber, Nicholas J.
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Question
Chapter 6, Problem 14P
To determine
(a)
The length of the queue at the end of the red phase.
To determine
(b)
The maximum queue length.
To determine
(c)
The time it takes for the queue to dissipate after the end of the red indication.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
The southbound approach of a signalized intersection carries a flow of 1000 veh/h/ln at a velocity of 50 mi/h. The duration of the red signal indication for this approach is 15 sec. If the saturation flow is 2000 veh/h/ln with a density of 75 veh/ln, the jam density is 150 veh/mi, determine the following: a. The length of the queue at the end of the red phase b. The maximum queue length c. The time it takes for the queue to dissipate after the end of the red indication.
The southbound approach of a signalized intersection carries a flow of 1000 veh/h/ln at a velocity of 50 mi/h. The duration of the red signal indication for this approach is 15 sec. If the saturation flow is 2000 veh/h/ln with a density of 75 veh/ln, the jam density is 150 veh/mi, determine the following:a. The length of the queue at the end of the red phaseb. The maximum queue lengthc. The time it takes for the queue to dissipate after the end of the red indication. What do you understand by traffic engineering? Explain.
An approach to a signalized intersection has a saturation flow rate of 1800 veh/h. At the beginning of an effective red, there are six vehicles in the queue and vehicles arrive at 900 veh/h. The signal has a 60- second cycle with 25 seconds of effective red. What is the total vehicle delay after one cycle (assume D/D/1 queuing)?
Chapter 6 Solutions
Traffic and Highway Engineering
Ch. 6 - Prob. 1PCh. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Prob. 5PCh. 6 - Prob. 6PCh. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10P
Ch. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 18PCh. 6 - Prob. 19PCh. 6 - Prob. 20PCh. 6 - Prob. 21PCh. 6 - Prob. 22PCh. 6 - Prob. 23PCh. 6 - Prob. 24PCh. 6 - Prob. 25PCh. 6 - The arrival times of vehicles at the ticket gate...Ch. 6 - Prob. 27P
Knowledge Booster
Similar questions
- An approach to a pretimed signal has 32 seconds of effective green, a saturation flow rate of 1800 veh/h, and a volume-to-capacity ratio less than 1. If the cycle length is 115 seconds and the overall delay formula (Eq. 7.27) estimates an average delay that is 38 seconds greater than that estimated by using just the uniform delay formula, determine the vehicle arrival rate in veh/h. (Assume the signal is isolated and d_3 = 0.arrow_forwardVehicles are approaching east of a stop signal traveling at 56 km/h, with a density of 46 vehicles/km/lane. The duration of the red signal indication for this approach is 30 seconds. If the saturation flow is 1900 vehicles/hr/lane with a density of 52 vehicles/km/lane and the congestion density is 125 vehicles/km/lane, determine the length of the queue at the end of the red phase. Assume the ShockWave model for the respective analysis.arrow_forwardFor a given one-lane approach of a signalized intersection, the base free flow speed is 40 mph, flow rate is 450 vphpl, saturation flow rate is 1,800 vphgpl, cycle length and red interval are 90 seconds and 30 seconds. Compute the following: The total time duration from the first vehicle in queue to the last queued vehicle being discharged per cycle The longest queue length and total number of vehicles in queue per cycle; Total vehicle-hours of delay and average delay per vehicle per cycle.arrow_forward
- TRANSPORTATION ENGINEERING-TRAFFIC SIGNALS" Recent analysis at an approach to pre-time signalized intersection indicate that the volume-to-capacity ratio (v/c) is 0.8, htat saturation flow rate (s) is 1600 vehicles/hour, and the effective green time is 50 seconds. If the average delay, assuming D/D/1 is 11.25 seconds per vehicle, determine the arrival flow rate (vehicles/hour) and the cycle length.arrow_forwardTraffic arrives at an approach of a signalized intersection at a flow rate of 360 veh/h. The approach receives 30 seconds effective green time in a 60 second cycle. The departure rate during effective green is 900 veh/h. Assume D/D/1 queuing at this approach, analyze traffic operation at this approach and provide statistics to quantify traffic operationarrow_forwardObservation post reveals that 8 vehicles passed through at intervals of 4.6 s, 6.23 s, 5.9 s, 7.1 s, 4.9 s, 3.8 s, 12.6 s, and 13.0 s, respectively. If the total distance travelled by the vehicles is 200 meters, i. If the density of traffic is 20 vpk, compute the rate of flow of traffic in vph. ii. If the speed limit imposed along the roadway is 100 kph, determine the percentage of speed limit violators.arrow_forward
- Assume that traffic on a single-lane approach to a signalized intersection observes the Greenshield’s speed-density relationship. The jam density on the approach is 180 veh/mile and free flow speed is 60mph. Suppose the current signal is green and the traffic is moving at 40mph and passing through the intersection. After the green time ends, the signal turns red and vehicle queue starts to build up. The signal keeps red for 60 seconds and turns green again. Answer the following questions: 1. How fast does the vehicle queue build up after the signal turns red? 2. How far the vehicles are queued in upstream, i.e. the maximum queue length?arrow_forwardStudies have shown that the traffic flow on a single-lane approach to a signalized intersection can be described by the Greenshields model. If the jam density on the approach is 130 veh/mi, determine the velocity of the stopping wave when the approach signal changes to red if the density on the approach is 45 veh/mi and the space mean speed is 40 mi/h. At the end of the red interval, what length of the approach upstream from the stop line will vehicles be affected if the red interval is 35 sec?arrow_forwardStudies have shown that the traffic flow on a single-lane approach to a signalized intersection can be described by the Greenshields model. If the jam density on the approach is 130 veh/mi, determine the velocity of the stopping wave when the approach signal changes to red if the density on the approach is 45 veh/mi and the space mean speed is 40 mi/h. At the end of the red interval, what length of the approach upstream from the stop line will vehicles be affected if the red interval is 35 sec?Draw a figure.arrow_forward
- A) Calculated (not rounded) clearance interval for an intersection approach of 50 mph that needs to cross 45 ft of intersection width. B) If a roadway has an AADT of 25000 vehicles, of which 2000 occur during the peak hour, what is the k factor? C) The stopped time delay for an intersection approach is 34.5 seconds. The control delay is most likely D)An intersection approach has a capacity of 1600 vph. What is the likely queue at the end of an hour if the 15 minute vehicle arrivals are 350, 500, 300, and 500? E)A roadway has a measured flow of 2400 vphpl and SMS of 60 mph, what is the density and LOS?arrow_forwardCars have a long queue at a stop sign. If the total time delay queueing is one min., compute the traffic intensity if the service rate of the road is only 360 veh/ hr. Assume both arrival and departure rates are exponentially distributed.arrow_forwardAn intersection has a three-phase signal with the movement allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired Phase 1 2 3 Allowed Movement NB L, SB L NB T/R, SB T/R EB L, WB L EB /T/R, WB T/R Analysis Flow Rate 330, 365 veh/h 1125, 1075 veh/h 110, 80 veh/h 250, 285 veh/h Saturation Flow Rate 1700, 1750 veh/h 3400, 300 veh/h 650, 600 veh/h 1750, 1800 veh/h Calculate the Following: 1.)Sum of flow ratios for critical lane groups 2.)minimum cycle length 3.)using v/c equation ratio, calculate the effective green time for phase 1 4.)using v/c equation ratio, calculate the effective green time for phase 2 5.)using v/c equation ratio, calculate the effective green time for phase 3arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning