Concept explainers
Case Summary: A rare book library at the University of Audubon in England keeps books that are worth thousands of dollars. This library is the foremost choice for many book readers. The library wants to design a structured process to make ensure the safety of books. The library has a designated process for which the throughput rate is 40 customers per hour. On average, 10 people wait in the visitor’s area, 12 people in the second waiting area, 5 people in the first edition waiting area, 3 people in the original manuscript area and 1 in the author’s journal waiting area. Activity durations are provided by the library and they want to analyze their process flow chart to ensure maximum customer satisfaction.
Interpretation: Bottleneck needs to be determined with the help of information given in the case.
Want to see the full answer?
Check out a sample textbook solution- In a job shop, how are work packages, hot checklists, and exception reports used?arrow_forwardThe work cycle in a worker–machine system consists of (1) external manual work elements with a total normal time of 0.42 min, (2) a machine cycle with a machine time of 1.12 min, and (3) internal manual elements with a total normal time of 1.04 min. (a) Determine the standard time for the cycle, using a PFD allowance factor of 15% and a machine allowance factor of 30%. (b) How many work units are produced daily (8-hour shift) at standardperformance?arrow_forwardDescribe what is meant by “loading” work centers. What are the two ways work centers can be loaded? What are two tech-niques used in loading?arrow_forward
- Explain what are the techniques available to operation manager to deal with a bottleneck operation and which of these does not decrease thorough out time ?arrow_forwardThe normal time for a work cycle in a worker-machine system is 6.0 min. For setting the standard time, the PFD allowance factor is 15%, and the machine allowance factor is 20%. The work cycle includes manual elements totaling a normal time of 5.5 min, all but 0.75 min of which are performed as internal elements. Determine (a) the daily output at standard performance. (b) During an 8-hour shift, the worker lost 20 min due to personal time, rest breaks, and delays, and she produced 80 pieces. What was the worker’s pace on the operator-controlled portion of the shift?arrow_forwardMelissa’s Photo Studio offers both individual and group portrait options. The process flow diagram in Figure shows that all customers must first register and then pay at one of two cashiers. Then, depending on whether they want a single or group portrait they go to different rooms. Finally, everyone picks up their own finished portrait. a. How long does it take to complete the entire process for a group portrait?b. What single activity is the bottleneck for the entire process, assuming the process receives equal amounts of both groups and individuals? c. What is the capacity of the bottleneck for both groups and individuals?arrow_forward
- refer to the figure. What is the bottleneck time of this process? a 4 min b 15 min c 3 min d 18 min e 3.75 minarrow_forwardDesk thumping—why? Can it be mitigated?arrow_forwardHow long do floor- hands, and roughnecks work in the oilfield? How much time do they have off? (Talking about an oilfield in texas)arrow_forward
- Monique Food Processing Company produces light snacks that can be heated in a microwave. The following steps are included in the process: Steps Description Capacity (Units/Hour) 1 Prepare food 200 2 Measure and place in plastic pouch 175 3 Prepare cardboard box 200 4 Insert pouch into box 300 5 Shrink-wrap box 200 What is the system capacity, and which is the bottleneck department? How much slack (unused capacity) is available in other departments? How much system capacity can be gained by adding capacity to the bottleneck? What are the key factors that determine when to add capacity? Why would an organization want to reduce its capacity?arrow_forwarda. what is the bottleneck of this process? b. what is the hourly capacity of the process?arrow_forward1. work flow diagram on personal accomplishments/career advancement.Please no copy paste.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.