Principles of Highway Engineering and Traffic Analysi (NEW!!)
6th Edition
ISBN: 9781119305026
Author: Fred L. Mannering, Scott S. Washburn
Publisher: WILEY
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 8, Problem 20P
To determine
The equilibrium flow and travel time before and after reconstruction begins.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A large residential area has 1500 households with an average household income of $15,000, an average household size of 5.2, and, on the average, 1.2 working members. Using the model below, predict the change in the number of peak-hour social/recreational trips if employment in the area increased by 20% and household income by 10%.
number of peak-hour vehicle-based social/recreational trips per household = 0.04 + 0.018(household size) + 0.009(annual household income [in thousands of dollars]) + 0.16(number of nonworking household members)
Round off final answers to whole number.
A large residential area has 1500 households with an average household income of $15,000, an average household size of 5.2, and, on the average, 1.2 working members. Using the model below, predict the change in the number of peak hour social/recreational trips If employment in the area increased by 20% and household income by 10%. number of peak-hour vehicle-based social/recreational trips per household 0.04 + 0.018(household size)+ 0.009(annual household income in thousands of dollars)+ 0.16(number of nonworking household members)
4. Two busses start at the same time towards each other from terminals A and B, 8 km apart. The time needed for the bus to travel A to B is 8 minutes, and of the second bus from B to A is 10 minutes. How much is the time needed by each bus to meet each if they travelled at their respective uniform speeds?
Chapter 8 Solutions
Principles of Highway Engineering and Traffic Analysi (NEW!!)
Ch. 8 - Prob. 1PCh. 8 - Prob. 2PCh. 8 - Prob. 3PCh. 8 - Prob. 4PCh. 8 - Prob. 5PCh. 8 - Prob. 6PCh. 8 - Prob. 7PCh. 8 - Prob. 8PCh. 8 - Prob. 9PCh. 8 - Prob. 10P
Ch. 8 - Prob. 11PCh. 8 - Prob. 12PCh. 8 - Prob. 13PCh. 8 - Prob. 14PCh. 8 - Prob. 15PCh. 8 - Prob. 16PCh. 8 - Prob. 17PCh. 8 - Prob. 18PCh. 8 - Prob. 19PCh. 8 - Prob. 20PCh. 8 - Prob. 21PCh. 8 - Prob. 22PCh. 8 - Prob. 23PCh. 8 - Prob. 24PCh. 8 - Prob. 25PCh. 8 - Prob. 26PCh. 8 - Prob. 27PCh. 8 - Prob. 28PCh. 8 - Prob. 29PCh. 8 - Prob. 30PCh. 8 - Prob. 31PCh. 8 - Prob. 32PCh. 8 - Prob. 33PCh. 8 - Prob. 34PCh. 8 - Prob. 35PCh. 8 - Prob. 36PCh. 8 - Prob. 37PCh. 8 - Prob. 38PCh. 8 - Prob. 39P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Two routes connect an origin and a destination and the flow is 15000 veh/h. Route 1 has a performance function t1=4+3*x1, and route 2 has a function of t2=b+6*x2, with the x's expressed in thousands of vehicles per hour and the t's in minutes. (a) If the user equilibrium flow on route 1 is 9780 veh/h, determine the free-flow speed on route 2(i.e. b) and equilibrium travel times. (b) If population declines reduce the number of travelers at the origin and the total origin-destination flow is reduced to 7000 veh/h, determine user equilibrium travel times and flows.arrow_forwardA study showed that during the peak-hour commute on two routes connecting a suburb with a large city, there are a total of 5500 vehicles that make the trip. Route 1 is 7 miles long with a 65-mi/h speed limit and route 2 is 4 miles long with a speed limit of 50 mi/h. The study also found that the travel time on route 2 increases with the square of the number of vehicles, while the route 1 travel time increases two minutes for every 500 additional vehicles added. Determine the user-equilibrium travel time in minutes.arrow_forwardThe distance covered by a tourist bus between Allahabad to varanasi and back on the same day is 150 kms. one way.The bus will make 8 trips in a month with an occupancy of 90%. The seating capacity of the bus is 50. The total passenger kms. in a month are: a.3,00,000 b.1,08,000 c.2,30,000 d.90,000arrow_forward
- A bus line has stops at every intersection, 200 m apart. The speed of traffic and of the buses except for their stopping at bus stops is 30 km/h, but for every stopping, busses lose a total of ts = 20 seconds. Passengers are uniformly distributed along the line and walk to/from its stops at a speed of Vw = 4.8 km/h. How would a passenger’s travel total time , including access to/from stops and travel on buses, change if every other stop was abandoned, i.e., the spacing between stops was increased from 200 m to 400 m, if the average trip length on the line is(a) 4 km; (b) 6 km; (c) 8 km? For what passenger trip length Lp will the total travel time remain the same?arrow_forward(show your formula) Given the figure above, compute for the Annual Average Daily Traffic of the Motorcycle: * a.233 B.181 C.None of the above D.228 E.183arrow_forwardVehicles arrive to a bridge at a rate of 24 vehicles per minute. The capacity of the bridge is typically 3000 veh/hour, but is reduced to 941 veh/hour for 12 minutes. What is the duration of the queue that forms on the bridge in minutes? Answer 15.8 minsarrow_forward
- Two routes are available to carry 1200 vehicles in peak-hour traffic. Route 1 has a posted speed limit of 45 mph and is 5 miles long. The travel time increases by 2x2, where x is vehicles in thousands. Route 2 has a limit of 55 mph and is 6.7 miles long, and the travel time increases by 1.5x. Find the user-equilibrium travel flow and travel time.arrow_forwardFor this exercise, you are to design a roadway that is to carry 100,000 people a day (excluding truck occupants) – 50,000 in design direction. The vehicles that carry these people include; (1) personal vehicles (average occupancy of 1.2 people per car) 2-2 kip single axles, and (2) buses with 2-22 kip single axles (assume they are filled with an average of 40 passengers). There are also trucks on the roadway and all trucks have 1-40 kip triple axle, 1-32 kip tandem axle, and 1-8 kip single axle. You know that the soil CBR is 6, the initial PSI is 4.5 and the TSI is 2.5. Other values to be used: All drainage coefficients = 1.0 Reliability = 90% Overall standard deviation of traffic = 0.50 Concrete Modulus of Elasticity = 5.5 million lb/in2 Concrete Modulus of Rupture = 750 lb/in2 PCC load transfer coefficient = 3.0 Design a rigid and flexible pavement, to last 15 years, for a four-lane road (four lanes in design direction) with 400 trucks per day in the design direction, and…arrow_forwardVehicles are known to arrive according to a Poisson process at a specific spot on a highway. Vehicles are tallied at 20-second intervals, with 150 of these intervals being 20-second intervals. In 20 of the 150 periods, no automobiles have arrived. Estimate the number of these 150 intervals in which four automobiles arrive at the same time. Please do 3 decimal places. Asaaparrow_forward
- 8.21 Three routes connect an origin and destination with performance functions t₁ = 2 +0.5x₁,₂ = 1 + x2 and 13 = 4 + 0.2x, (with f's in minutes and x's in thousands of vehicles per hour). Determine user- equilibrium flows if the total origin-to-destination demand is (a) 5000 veh/h.arrow_forwardVehicles are known to arrive according to a Poisson Equation at a specific spot on a highway. Vehicles are recorded at 25-second intervals, with 250 of these intervals being 25-second intervals. In 25 of the 250 periods, 3 automobiles have arrived. Estimate the number of these 250 intervals in which four automobiles arrive at the same time. solve and show your complete solution please.arrow_forwardPassenger cars arrive at the stop sign at an average rate of 280 per hour. Average departure time at the stop sign is 12 sec. If both arrivals and departure are exponentially distributed, what would be the average waiting time per vehicle in minutes? Answer in one-decimal place.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning