Principles of Highway Engineering and Traffic Analysi (NEW!!)
6th Edition
ISBN: 9781119305026
Author: Fred L. Mannering, Scott S. Washburn
Publisher: WILEY
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 8, Problem 28P
To determine
Whether user-equilibrium and system-optimal solution can be equal at some feasible value.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Three routes connect an origin to a destination with the following link performance functions: t_1 = 8 + 0.5 x_2 t_2 = 1 + 2x_2 t_3 = 3 + 0.75x_3 where t's in minutes and x's in thousands of vehicle per hour. If the peak-hour traffic demand is 4000 vehicles, determine the user equilibrium (UE) flows.
Three routes connect an origin-destination pair with performance functions:t₁ = 20 +0.5x1t2 = 4+ 2x2t3=3+0.2x3with t in minutes and x in thousand vehicles per hour.(a) Determine the User Equilibrium flow on each route if q = 4000veh/h. (b) What is the minimum q (origin-destination demand) to ensure that all the three routes are used under user equilibrium? (c) Suppose that Route 1 is closed for repair. Find the system optimal flow on routes 2 and 3 and compute the total travel times.
Determine the trip distribution matrix using "Gravity Model" of transport system with
given the data:
Trip Production of Zones 1, 2 and 3, correspondingly are 500, 600, and 800 tpd
Trip Attraction of Zones 1, 2 and 3, correspondingly are 600, 700 and 600 tpd
Chapter 8 Solutions
Principles of Highway Engineering and Traffic Analysi (NEW!!)
Ch. 8 - Prob. 1PCh. 8 - Prob. 2PCh. 8 - Prob. 3PCh. 8 - Prob. 4PCh. 8 - Prob. 5PCh. 8 - Prob. 6PCh. 8 - Prob. 7PCh. 8 - Prob. 8PCh. 8 - Prob. 9PCh. 8 - Prob. 10P
Ch. 8 - Prob. 11PCh. 8 - Prob. 12PCh. 8 - Prob. 13PCh. 8 - Prob. 14PCh. 8 - Prob. 15PCh. 8 - Prob. 16PCh. 8 - Prob. 17PCh. 8 - Prob. 18PCh. 8 - Prob. 19PCh. 8 - Prob. 20PCh. 8 - Prob. 21PCh. 8 - Prob. 22PCh. 8 - Prob. 23PCh. 8 - Prob. 24PCh. 8 - Prob. 25PCh. 8 - Prob. 26PCh. 8 - Prob. 27PCh. 8 - Prob. 28PCh. 8 - Prob. 29PCh. 8 - Prob. 30PCh. 8 - Prob. 31PCh. 8 - Prob. 32PCh. 8 - Prob. 33PCh. 8 - Prob. 34PCh. 8 - Prob. 35PCh. 8 - Prob. 36PCh. 8 - Prob. 37PCh. 8 - Prob. 38PCh. 8 - Prob. 39P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- [T] The following table provides hypothetical data regarding the level of service for a certain highway. Plot vehicles per hour per lane on the x-axis and highway speed on the y-axis. Compute the average decrease in speed (in miles per hour) per unit increase in congestion (vehicles per hour per lane) as the latter increases from 600 to 1000, from 1000 to 1500, and from 1500 to 2100. Does the decrease in miles per hour depend linearly on the increase in vehicles per hour per lane? Plot minutes per mile (60 times the reciprocal of miles per hour) as a function of vehicles per hour per lane. Is this function linear? Highway Speed Vehicles per Hour per Lane Density Range (vehicles / mi) > 60 < 600 < 10 60 - 57 600 - 1000 10 - 20 57 - 54 1000 - 1500 20 - 30 54 - 46 1500 - 1900 30 - 45 46 - 30 1900 - 2100 45 - 70 < 30 Unstable 70 - 200arrow_forwardThe Jeffersonville Transportation Study Area has been divided into four large districts (traffic zones). The following data have been collected for those districts. Provide a trip distribution calculation using the gravity model for two Assume Kij = 1.arrow_forwardTwo routes connect a city and suburb. During the peak-hour morning commute, a total of 5000 vehicles travel from the suburb to the city. Route 1 has a 50km/hr speed limit and 5km in length, Route 2 has a 55km/hr speed limit and 4 km in length. Studies show that the total travel time on route 1 increases 2 mins for every extra 500 vehicles added. Mins of travel time on route 2 increase with the square of the no. of vehicles expressed in 000’s. Determine user equilibrium travel times.arrow_forward
- A large residential area has 1500 households with an average household income of $15,000, an average household size of 5.2, and, on the average, 1.2 working members. Using the model below, predict the change in the number of peak-hour social/recreational trips if employment in the area increased by 20% and household income by 10%. number of peak-hour vehicle-based social/recreational trips per household = 0.04 + 0.018(household size) + 0.009(annual household income [in thousands of dollars]) + 0.16(number of nonworking household members) Round off final answers to whole number.arrow_forwardAfter 10 years, the public transportation remain unimproved. The modal split will also remain unchanged with 70% of person-trips utilize Public Transportation during peak period. After 10 years, the person-trip demand will increase from 450 to 675. If the overall capacity of the Public Transportation during peak period can carry up to 450 person-trips, the demand / PT supply capacity ratio is _______ (answer shall be in 2 demical places)arrow_forwardA large residential area has 1500 households with an average household income of $15,000, an average household size of 5.2, and, on the average, 1.2 working members. Using the model below, predict the change in the number of peak hour social/recreational trips If employment in the area increased by 20% and household income by 10%. number of peak-hour vehicle-based social/recreational trips per household 0.04 + 0.018(household size)+ 0.009(annual household income in thousands of dollars)+ 0.16(number of nonworking household members)arrow_forward
- After 10 years, the public transportation remain unimproved. The modal split will also remain unchanged with 70% of person-trips utilize Public Transportation during peak period. After 10 years, the person-trip demand will increase from 450 to 675. If the overall capacity of the Public Transportation during peak period can carry up to 450 person-trips, the demand / PT supply capacity ratio is _______ (answer shall be in 2 demical places) Please correct answerarrow_forwardGrab taxis arrive at the Manila International Airport , according to a Poisson process, at the rate of 10 per hour. a. What is the probability that exactly 5 taxis arrive during a 1-hour period? b. If we define a working day as 12 hours, what is the probability that at least 50 taxis arrive during a working day? c. What is the probability that at least 5 arrive during a 1-hour period? Kindly provide a complete solution in 3 decimal points.arrow_forward12) List and define the 4 steps of the "4-step travel demand model" used in transportation planning.arrow_forward
- Question:- Traffic counts in the year 2000 at a counting point on a national highway gave ADT as follows: 4000cars,1750 taxis,250 trucks,100 buses.National traffic growth in the area is expected to be 5% for private cars and taxis, 3% for trucks and buses.After improvements, generated traffic for the highway will be 20 % of the 2000 ADT.It is required to design the cross-section of the highway to satisfy the traffic needs by the year 2015 show all visible dimensions on a drawing sketch. Take:-K= 0.15PLC = 800 p.c.e'/hour.directional distribution (D) is 0.6arrow_forwardDuring morning peak hour, the passenger demand is 600. Assume that passenger demand is evenly distributed within that period and the average load/occupancy is 50 passengers per bus. Calculate the average headway of a city buses? If the passenger demand increases to be 750, calculate the number of bus units need to be added and the headway shorten?arrow_forwardA toll bridge carries 10,000 veh/day. The current toll is $3.00/vehicle. Studies have shown that for each increase in toll of 50 cents, the traffic volume will decrease by 1000 veh/day. It is desired to increase the toll to a point where revenue will be maximized. Let V be the Volume X be the increase in toll charge (a) Write the expression for travel demand on the bridge related to toll increase and current volume. (b) Determine the increase in toll charge (c) Determine the new toll charge to maximize revenues. (d) Determine traffic in veh/day after toll increase. (e) Determine total revenue increase with new toll.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning