Principles of Highway Engineering and Traffic Analysi (NEW!!)
6th Edition
ISBN: 9781119305026
Author: Fred L. Mannering, Scott S. Washburn
Publisher: WILEY
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 8, Problem 7P
To determine
The new distribution of the 4000 Saturday afternoon shopping trips when shopping center 3 goes out of business.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Three routes connect an origin to a destination with the following link performance functions: t_1 = 8 + 0.5 x_2 t_2 = 1 + 2x_2 t_3 = 3 + 0.75x_3 where t's in minutes and x's in thousands of vehicle per hour. If the peak-hour traffic demand is 4000 vehicles, determine the user equilibrium (UE) flows.
The Jeffersonville Transportation Study Area has been divided into four large districts (traffic zones). The following data have been collected for those districts. Provide a trip distribution calculation using the gravity model for two Assume Kij = 1.
Three routes connect an origin-destination pair with performance functions:t₁ = 20 +0.5x1t2 = 4+ 2x2t3=3+0.2x3with t in minutes and x in thousand vehicles per hour.(a) Determine the User Equilibrium flow on each route if q = 4000veh/h. (b) What is the minimum q (origin-destination demand) to ensure that all the three routes are used under user equilibrium? (c) Suppose that Route 1 is closed for repair. Find the system optimal flow on routes 2 and 3 and compute the total travel times.
Chapter 8 Solutions
Principles of Highway Engineering and Traffic Analysi (NEW!!)
Ch. 8 - Prob. 1PCh. 8 - Prob. 2PCh. 8 - Prob. 3PCh. 8 - Prob. 4PCh. 8 - Prob. 5PCh. 8 - Prob. 6PCh. 8 - Prob. 7PCh. 8 - Prob. 8PCh. 8 - Prob. 9PCh. 8 - Prob. 10P
Ch. 8 - Prob. 11PCh. 8 - Prob. 12PCh. 8 - Prob. 13PCh. 8 - Prob. 14PCh. 8 - Prob. 15PCh. 8 - Prob. 16PCh. 8 - Prob. 17PCh. 8 - Prob. 18PCh. 8 - Prob. 19PCh. 8 - Prob. 20PCh. 8 - Prob. 21PCh. 8 - Prob. 22PCh. 8 - Prob. 23PCh. 8 - Prob. 24PCh. 8 - Prob. 25PCh. 8 - Prob. 26PCh. 8 - Prob. 27PCh. 8 - Prob. 28PCh. 8 - Prob. 29PCh. 8 - Prob. 30PCh. 8 - Prob. 31PCh. 8 - Prob. 32PCh. 8 - Prob. 33PCh. 8 - Prob. 34PCh. 8 - Prob. 35PCh. 8 - Prob. 36PCh. 8 - Prob. 37PCh. 8 - Prob. 38PCh. 8 - Prob. 39P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- [T] The following table provides hypothetical data regarding the level of service for a certain highway. Plot vehicles per hour per lane on the x-axis and highway speed on the y-axis. Compute the average decrease in speed (in miles per hour) per unit increase in congestion (vehicles per hour per lane) as the latter increases from 600 to 1000, from 1000 to 1500, and from 1500 to 2100. Does the decrease in miles per hour depend linearly on the increase in vehicles per hour per lane? Plot minutes per mile (60 times the reciprocal of miles per hour) as a function of vehicles per hour per lane. Is this function linear? Highway Speed Vehicles per Hour per Lane Density Range (vehicles / mi) > 60 < 600 < 10 60 - 57 600 - 1000 10 - 20 57 - 54 1000 - 1500 20 - 30 54 - 46 1500 - 1900 30 - 45 46 - 30 1900 - 2100 45 - 70 < 30 Unstable 70 - 200arrow_forwardA large residential area has 1500 households with an average household income of $15,000, an average household size of 5.2, and, on the average, 1.2 working members. Using the model below, predict the change in the number of peak-hour social/recreational trips if employment in the area increased by 20% and household income by 10%. number of peak-hour vehicle-based social/recreational trips per household = 0.04 + 0.018(household size) + 0.009(annual household income [in thousands of dollars]) + 0.16(number of nonworking household members) Round off final answers to whole number.arrow_forwardVehicles arrive to a bridge at a rate of 24 vehicles per minute. The capacity of the bridge is typically 3000 veh/hour, but is reduced to 941 veh/hour for 12 minutes. What is the duration of the queue that forms on the bridge in minutes? Answer 15.8 minsarrow_forward
- During morning peak hour, the passenger demand is 600. Assume that passenger demand is evenly distributed within that period and the average load/occupancy is 50 passengers per bus. Calculate the average headway of a city buses? If the passenger demand increases to be 750, calculate the number of bus units need to be added and the headway shorten?arrow_forwardGrab taxis arrive at the Manila International Airport , according to a Poisson process, at the rate of 10 per hour. a. What is the probability that exactly 5 taxis arrive during a 1-hour period? b. If we define a working day as 12 hours, what is the probability that at least 50 taxis arrive during a working day? c. What is the probability that at least 5 arrive during a 1-hour period? Kindly provide a complete solution in 3 decimal points.arrow_forwardA large residential area has 1500 households with an average household income of $15,000, an average household size of 5.2, and, on the average, 1.2 working members. Using the model below, predict the change in the number of peak hour social/recreational trips If employment in the area increased by 20% and household income by 10%. number of peak-hour vehicle-based social/recreational trips per household 0.04 + 0.018(household size)+ 0.009(annual household income in thousands of dollars)+ 0.16(number of nonworking household members)arrow_forward
- A ferry boat queuing lane holds 30 vehicles. If the service rate is a uniform deterministic 4 vehicles per minute and service begins when the lane reaches capacity, what is the uniform deterministic arrival rate if the queue dissipates 30 min. after vehicles begin to arrive?arrow_forward12) List and define the 4 steps of the "4-step travel demand model" used in transportation planning.arrow_forwardGiven that a zone has 200 households with car and 200 households without car and the average trip generation rates for each groups are respectively 4.0 and 2 trips per day. Assuming that in the future, all household will have a car, find the growth factor and future trips from that zone, assuming that the population and income remains constant.arrow_forward
- Identify and briefly describe the two basic demand forecasting situations in transportation planning.arrow_forwardA town has a population of 350,000 in 2005, if an annual growth of 5% is observed until year 2020. And at year 2016, the number of accidents was 777. Determine the accident rate at 2016.arrow_forwardData collected at a parking lot indicate that a total of 300 cars park between 8 a.m. and 5 p.m. 5% of these cars are parked for an average of 2 hr, 20% for an average of 3 hr, 10% for an average of 4 hr, and the remaining cars are parked for an average of 9 hr. (a) Determine the space-hours of demand at the lot. (b) If 10% of the parking bays are vacant on average (between 8 a.m. and 5 p.m.) at the parking lot, determine the number of parking bays in the parking lot. Assume an efficiency factor of 0.90. (c) The owner of the parking lot is planning an expansion of her lot to provide adequate demand for the following 10 years. If she has estimated that parking demand for all categories will increase by 3% a year, determine the number of additional parking bays that will be required.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning