To determine

The total vehicle delay on the approach after one cycle.

Blurred answer
Students have asked these similar questions
An observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies)?
An intersection approach has a saturation flow rate of 1500 veh/h, and vehicles arrive at the approach at the rate of 800 veh/h. The approach is controlled by a pretimed signal with a cycle length of 60 seconds and D/D/1 queuing holds. Local standards dictate that signals should be set such that all approach queues dissipate 10 seconds before the end of the effective green portion of the cycle. Assuming that approach capacity exceeds arrivals, determine the maximum length of effective red that will satisfy the local standards.
The saturation flow for an intersection approach is 3600 veh/h. At the beginning of cycle no vehicles are queued. The signal is timed so that what the queue is 13 vehicles the effective green begins. If the queue dissipates 8 seconds before the end of the cycle and the cycle length is 60 seconds. What is the arrival rate assuming D/D/1 queuing?
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning