Chapter 7, Problem 21P
To determine
The total vehicle delay on the approach after one cycle.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
An observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies)?
An intersection approach has a saturation flow rate of 1500 veh/h, and vehicles arrive at the approach at the rate of 800 veh/h. The approach is controlled by a pretimed signal with a cycle length of 60 seconds and D/D/1 queuing holds. Local standards dictate that signals should be set such that all approach queues dissipate 10 seconds before the end of the effective green portion of the cycle. Assuming that approach capacity exceeds arrivals, determine the maximum length of effective red that will satisfy the local standards.
The saturation flow for an intersection approach is 3600 veh/h. At the beginning of cycle no vehicles are queued. The signal is timed so that what the queue is 13 vehicles the effective green begins. If the queue dissipates 8 seconds before the end of the cycle and the cycle length is 60 seconds. What is the arrival rate assuming D/D/1 queuing?
Chapter 7 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10P
Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - Prob. 14PCh. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 18PCh. 7 - Prob. 19PCh. 7 - Prob. 20PCh. 7 - Prob. 21PCh. 7 - Prob. 22PCh. 7 - Prob. 23PCh. 7 - Prob. 24PCh. 7 - Prob. 25PCh. 7 - Prob. 26PCh. 7 - Prob. 27PCh. 7 - Prob. 28PCh. 7 - Prob. 29PCh. 7 - Prob. 30PCh. 7 - Prob. 31PCh. 7 - Prob. 32PCh. 7 - Prob. 33PCh. 7 - Prob. 34PCh. 7 - Prob. 35PCh. 7 - Prob. 36PCh. 7 - Prob. 37PCh. 7 - Prob. 38PCh. 7 - Prob. 39PCh. 7 - Prob. 40PCh. 7 - Prob. 41PCh. 7 - Prob. 42PCh. 7 - Prob. 43PCh. 7 - Prob. 44PCh. 7 - Prob. 45PCh. 7 - Prob. 46PCh. 7 - Prob. 47PCh. 7 - Prob. 48PCh. 7 - Prob. 49PCh. 7 - Prob. 50PCh. 7 - Prob. 51PCh. 7 - Prob. 52PCh. 7 - Prob. 53PCh. 7 - Prob. 54PCh. 7 - Prob. 55PCh. 7 - Prob. 56PCh. 7 - Prob. 57PCh. 7 - Prob. 58PCh. 7 - Prob. 59PCh. 7 - Prob. 60PCh. 7 - Prob. 61PCh. 7 - Prob. 62P
Knowledge Booster
Similar questions
- An approach to a pretimed signal has 30 seconds of effective red, and D/D/1 queuing holds. The total delay at the approach is 83.33 veh-s/cycle and the saturation flow rate is 1000 veh/h. If the capacity of the approach equals the number of arrivals per cycle, determine the approach flow rate and cycle length.arrow_forwardAn approach to a pre-timed signal has 40 sec of effective green in a 75-second cycle.The approach volume is 700 veh/h and the saturation flow rate is 1600 veh/h.Calculate the time to queue clearance after the start of the effective green, themaximum number of vehicles in the queue, the total vehicle delay per cycle andthe average delay per vehicle assuming D/D/1 queuing.arrow_forwardAn observer notes that an approach to a pretimed signal, the time it will take the queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) is 60 s. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, what is the maximum number of vehicles in a queue in a given cycle?arrow_forward
- 5. Green terminates at a signalized intersection with 6 vehicles queued for service. The arrival rate for the approach is 1 veh/sec. The departure rate is 2 veh/sec. The cycle length is 100s, 50s of which are effective green. Answer the following: a. What is the total delay (in veh-sec) experienced by all vehicles in this system during the next cycle? (arrow_forward7. An approach at a pretimed signalized intersection is allocated 30 seconds of effective green in an 80-second signal cycle. The flow at the approach is 500 veh/h and the saturation flow of the approach is 2500 veh/h. Assuming D/D/1 queuing, calculate: 1) the time needed to clear the queue, 2) the average delay per vehicle, and 3) the maximum delay of any vehicle.arrow_forwardTraffic demand shown in the figure below uniformly arrives at an intersection. Determine the optimal cycle length and split for the 2- phase signal control. The saturation flow rate of each approach is 2000 [veh/hr of effec-tive green] during the first 40 [sec] after the start of green, but it drops to 1900 [veh/hr of effective green] thereafter. Also, the lost time is assumed to be 5 [sec/phase]. 1000[veh/h] 300[veh/h] 500[veh/h] 1300[veh/h]arrow_forward
- Compute the average approach delay per cycle, given the saturation flow rate of 2400 veh/h and is allocated 24 seconds of effective green in an 80-second signal cycle. Flow at the approach is 500 veh/h. Assume the traffic flow accounts for the peak 15-min period and that there is no initial queue at the start of the analysis period.arrow_forwardVehicles arrive at an intersection approach at 550 veh/h at the beginning of an effective red and 15 vehicles are left in the queue from the previous cycle (end of the effective green). Due to peak hour congestion, the arrival rate increases 50 veh/h/min. Therefore after 1 minute, the arrival rate will be 600 veh/h, after 2 minutes it is 650 veh/h. The saturation flow rate of the approach is 1800 veh/h, the cycle length is 65 seconds, and the effective green time is 30 seconds. Determine the total vehicle delay until complete queue clearance. (Assume D/D/1 queuing).arrow_forwardAn observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) (in seconds)? Round off the final answer to whole numberarrow_forward
- The uniform arrival and uniform service rates observed on an approach road to a signalized intersection are 20 and 50 vehicles/minute, respectively. For this signal, the red time is 30 s, the effective green time is 30 s, and the cycle length is 60 s. Assuming that initially there are no vehicles in the queue, the average delay per vehicle using the approach road during a cycle length (in s, round off to 2 decimal places) isarrow_forward(b) An approach to a pretimed signal has 25 seconds of effective green in a 60-second cycle. The approach volume is 500 vph and the saturation flow rate is 1400 vph. Calculate the average vehicle delay assuming D/D/1 queuing.arrow_forwardAn approach to a pretimed signal has 25 seconds of effective green. The approach volume is 500 veh/h and the saturation flow rate is 1400 veh/h. If the average vehicle delay is 20 seconds assuming D/D/1 queuing, determine the cycle length (in seconds). Round off the final answer to whole number (no units).arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning