PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
7th Edition
ISBN: 9781119610526
Author: Mannering
Publisher: WILEY
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7, Problem 57P
To determine
The displayed green time for the traffic movement.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
TRANSPORTATION ENGINNERING-TRAFFIC SIGNALS
An approach to a predetermined signal has 25 seconds of effective green for a 60 second cycle. The approach volume is 500 vehicles/hour and the saturation flow rate is 1400 vehicles/hour. Calculate the average vehicle delay using D/D/1 queing.
A signalized intersection has a cycle length of 70 seconds. For one traffic movement, the displayed all-red time is set to two seconds
while the displayed yellow time is five seconds. The effective red time is 37 seconds and the total lost time per cycle for the
movement is four seconds. What is the displayed green time for the traffic movement in seconds (whole number). Blank 1
Blank 1
Add your answer
A signalized intersection has four phases. The yci are 0.15, 0.19, 0.21, and 0.17 for the four phases, respectively. If the cycle length is 108 seconds and the total lost time is 16 seconds, what is the effective green time for phase 2?
Group of answer choices
23 sec
25 sec
21 sec
19 sec
Chapter 7 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10P
Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - Prob. 14PCh. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 18PCh. 7 - Prob. 19PCh. 7 - Prob. 20PCh. 7 - Prob. 21PCh. 7 - Prob. 22PCh. 7 - Prob. 23PCh. 7 - Prob. 24PCh. 7 - Prob. 25PCh. 7 - Prob. 26PCh. 7 - Prob. 27PCh. 7 - Prob. 28PCh. 7 - Prob. 29PCh. 7 - Prob. 30PCh. 7 - Prob. 31PCh. 7 - Prob. 32PCh. 7 - Prob. 33PCh. 7 - Prob. 34PCh. 7 - Prob. 35PCh. 7 - Prob. 36PCh. 7 - Prob. 37PCh. 7 - Prob. 38PCh. 7 - Prob. 39PCh. 7 - Prob. 40PCh. 7 - Prob. 41PCh. 7 - Prob. 42PCh. 7 - Prob. 43PCh. 7 - Prob. 44PCh. 7 - Prob. 45PCh. 7 - Prob. 46PCh. 7 - Prob. 47PCh. 7 - Prob. 48PCh. 7 - Prob. 49PCh. 7 - Prob. 50PCh. 7 - Prob. 51PCh. 7 - Prob. 52PCh. 7 - Prob. 53PCh. 7 - Prob. 54PCh. 7 - Prob. 55PCh. 7 - Prob. 56PCh. 7 - Prob. 57PCh. 7 - Prob. 58PCh. 7 - Prob. 59PCh. 7 - Prob. 60PCh. 7 - Prob. 61PCh. 7 - Prob. 62P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- The uniform arrival and uniform service rates observed on an approach road to a signalized intersection are 20 and 50 vehicles/minutes, respectively. For this signal, the red time is 30 s, the effective green time is 30 s, and the cycle length is 60s. Assuming that initially there are no vehicles in the queue, the average delay per vehicle using the approach road during a cycle length (in seconds, round off to 2 decimal places) isarrow_forwardThe cumulative arrival and departure curve of one cycle of an approach lane of a signalized intersection is shown in the adjoining figure. The cycle time is 50 s and the effective red time is 30 s and the effective green time is 20 s. What is the average delay? Cumulative --- Arrival A Cumulative arrival or departure (No. of vehicles) TO 30 #1 Departurearrow_forwardSubject: transportation engineering Read the question carefully and give me right solution according to the question. A signal has four phases, where the critical lane group flow ratios are 0.115, 0.204, 0.099, and 0.248. If the lost time per phase is 6 seconds and the critical intersection v/c ratio is 0.88, calculate the minimum cycle length and the phase effective green times such that the lane group v/c ratios are equal.arrow_forward
- An intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. Phase 3 Allowed movements NB L, SB L NB T/R, SB T/R EB L, WB L EB TR, WB TR Analysis flow rate 330, 365 veh/h 1125, 1075 veh/h 110, 80 veh/h 250, 285 veh/h Saturation flow rate 1700, 1750 veh/h 3400, 3300 vehh 650, 600 veh/h 1750, 1 800 veh/h Using v/c equalization ratio, calculate the effective green time for phase 3 14.825 sec 15.552 sec O 11.462 sec O 16.065 secarrow_forwardAn intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. O 12.105 sec O 15.954 sec O 13.190 sec Phase O 14.127 sec Allowed movements Analysis flow rate Saturation flow rate 1 NB L, SB L 330, 365 veh/h 1700, 1750 veh/h Using v/c equalization ratio, calculate the effective green time for phase 1 2 NB T/R, SB T/R 1125, 1075 veh/h 3400, 3300 veh/h EBL, WBL 110, 80 veh/h 650, 600 veh/h 3 EB T/R, WB T/R 250, 285 veh/h 1750, 1800 veh/harrow_forwardAn intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. Phase 3 Allowed movements NB L, SB L NB T/R, SB T/R EB L, WB L ЕВ TR, WB TR Analy sis flow rate 330, 365 veh/h 1125, 1075 veh/h 110, 80 veb/h 250, 285 veh/h Saturation flow rate 1700, 1750 veh/h 3400, 3300 veh/h 650, 600 veh/h 1750, 1800 veh/h Calculate the sum of the flow ratios for the critical lane groups. 0.787 O 0.857 O 0.709 O 0,829arrow_forward
- An approach to a pretimed signal has 25 seconds of effective green, a saturation flow of 1300 veh/hr, and a volume to capacity ratio less than 1.0. If the cycle length is 60 seconds and Allsop's delay formula estimates a delay of 34 sec/veh higher than the estimated using D/D/1 delay formula, determine the vehicle arrival rate (in veh/hr). Round off answers to 2 decimal places.arrow_forwardAn intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. 155 sec Calculate minimum cycle length O 100 sec 255 sec Phase O 60 sec Allowed movements. Analysis flow rate Saturation flow rate 1 NB L, SB L 330, 365 veh/h 1700, 1750 veh/h 2 NB T/R, SB T/R 1125, 1075 veh/h 3400, 3300 veh/h EBL, WBL 110, 80 veh/h 650, 600 veh.h 3 EB T/R, WB T/R 250, 285 veh/h 1750, 1800 veh/harrow_forwardA given movement at signalized intersection receives 28-seconds green time, 3.5 seconds of yellow time out of 60 seconds cycle. If saturation flow rate is 3750 vph/lane and the startup lost time is 1.5 seconds, what is the capacity of the movement? 8036 4083 1680 1750arrow_forward
- A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all phases). The lost time is known to be 4 seconds for each phase. Assuming Xi = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth phase?arrow_forwardA pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/In for all phases). The lost time is known to be 4 seconds for each phase. Assuming X₁ = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth phase? 6.93 sec O 21.89 sec Ⓒ 7.78 sec Q 7.41 secarrow_forwardAn observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) (in seconds)? Round off the final answer to whole number. Blank 1 Blank 1 Add your answerarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning