To determine

The approach’s total delay after two cycle and when will queue be cleared.

Blurred answer
Students have asked these similar questions
7.12 The saturation flow rate of an approach to a pretimed signal is 6000 veh/h. The signal has a 60-second cycle with 20 seconds of effective red allocated to the approach. At the beginning of an effective red (with no vehicles remaining in the queue from a previous cycle), vehicles start arriving at a rate v(t) = 0.4 +0.01t + 0.00057+² (where v(t)) is in vehicles per second and t is the number of seconds from the beginning of the cycle). 30 seconds into the cycle the arrival rate remains constant at its 30-second level and stays at that rate until the end of the cycle. What is the total vehicle delay over the cycle (in vehicle- seconds), assuming D/D/1 queuing?
Traffic demand shown in the figure below uniformly arrives at an intersection. Determine the optimal cycle length and split for the 2- phase signal control. The saturation flow rate of each approach is 2000 [veh/hr of effec-tive green] during the first 40 [sec] after the start of green, but it drops to 1900 [veh/hr of effective green] thereafter. Also, the lost time is assumed to be 5 [sec/phase]. 1000[veh/h] 300[veh/h] 500[veh/h] 1300[veh/h]
(b) An approach to a pretimed signal has 25 seconds of effective green in a 60-second cycle. The approach volume is 500 vph and the saturation flow rate is 1400 vph. Calculate the average vehicle delay assuming D/D/1 queuing.
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning