Question
Chapter 7, Problem 27P
To determine
The approach’s total vehicle delay after
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
An observer notes that an approach to a pretimed signal, the time it will take the queue to clear after the start of
the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) is 60 s. If the
saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, what is the maximum number of
vehicles in a queue in a given cycle?
The saturation flow for an intersection approach is 3600 veh/h. At the beginning of cycle no vehicles are queued. The signal is timed so that what the queue is 13 vehicles the effective green begins. If the queue dissipates 8 seconds before the end of the cycle and the cycle length is 60 seconds. What is the arrival rate assuming D/D/1 queuing?
An observer notes that an approach to a pretimed signal, the time it will take the queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) is 60 s. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, what is the maximum number of vehicles in a queue in a given cycle? Round off the final answer to whole number (no units).
Chapter 7 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10P
Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - Prob. 14PCh. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 18PCh. 7 - Prob. 19PCh. 7 - Prob. 20PCh. 7 - Prob. 21PCh. 7 - Prob. 22PCh. 7 - Prob. 23PCh. 7 - Prob. 24PCh. 7 - Prob. 25PCh. 7 - Prob. 26PCh. 7 - Prob. 27PCh. 7 - Prob. 28PCh. 7 - Prob. 29PCh. 7 - Prob. 30PCh. 7 - Prob. 31PCh. 7 - Prob. 32PCh. 7 - Prob. 33PCh. 7 - Prob. 34PCh. 7 - Prob. 35PCh. 7 - Prob. 36PCh. 7 - Prob. 37PCh. 7 - Prob. 38PCh. 7 - Prob. 39PCh. 7 - Prob. 40PCh. 7 - Prob. 41PCh. 7 - Prob. 42PCh. 7 - Prob. 43PCh. 7 - Prob. 44PCh. 7 - Prob. 45PCh. 7 - Prob. 46PCh. 7 - Prob. 47PCh. 7 - Prob. 48PCh. 7 - Prob. 49PCh. 7 - Prob. 50PCh. 7 - Prob. 51PCh. 7 - Prob. 52PCh. 7 - Prob. 53PCh. 7 - Prob. 54PCh. 7 - Prob. 55PCh. 7 - Prob. 56PCh. 7 - Prob. 57PCh. 7 - Prob. 58PCh. 7 - Prob. 59PCh. 7 - Prob. 60PCh. 7 - Prob. 61PCh. 7 - Prob. 62P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- An observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies)?arrow_forwardThe uniform arrival and uniform service rates observed on an approach road to a signalized intersection are 20 and 50 vehicles/minutes, respectively. For this signal, the red time is 30 s, the effective green time is 30 s, and the cycle length is 60s. Assuming that initially there are no vehicles in the queue, the average delay per vehicle using the approach road during a cycle length (in seconds, round off to 2 decimal places) isarrow_forwarddelay? 4. The gate entrance to a park opens at 9:00 A.M. At 9:00 A.M. there are 32 vehicles in the queue waiting to enter. Vehicles continue to arrive (from 9:00 A.M. onward) at a rate of X(t) = 4.2-0.05t (with X(t) in veh/min and t in minutes after 9:00 A.M.). The gate attendant processes vehicles at a rate of u(t) = 3 + 0.3t [with u(t) in veh/min and t in minutes after 9:00 A.M.]. Assuming D/D/1 queuing, what is the maximum queue length and total vehicle delay from 9:00 A.M. onward? A.20 mph nohorarrow_forward
- 7.12 The saturation flow rate of an approach to a pretimed signal is 6000 veh/h. The signal has a 60-second cycle with 20 seconds of effective red allocated to the approach. At the beginning of an effective red (with no vehicles remaining in the queue from a previous cycle), vehicles start arriving at a rate v(t) = 0.4 +0.01t + 0.00057+² (where v(t)) is in vehicles per second and t is the number of seconds from the beginning of the cycle). 30 seconds into the cycle the arrival rate remains constant at its 30-second level and stays at that rate until the end of the cycle. What is the total vehicle delay over the cycle (in vehicle- seconds), assuming D/D/1 queuing?arrow_forward7.24 Vehicles arrive at an approach to a pretimed signalized intersection. The arrival rate over the cycle is given by the function v(t) = 0.22 + 0.012t [v(t) is in veh/s and t is in seconds]. There are no vehicles in the queue when the cycle (effective red) begins. The cycle length is 60 seconds and the saturation flow rate is 3600 veh/h. Determine the effective green and red times that will allow the queue to clear exactly at the end of the cycle (the end of the effective green), and determine the total vehicle delay for this approach over the cycle (assuming D/D/1 queuing).arrow_forwardVehicles begin to arrive at a park entrance at 7:45 A.M. at a constant rate of six per minute and at a constant rate of four vehicles per minute from 8:00 A.M. on. The park opens at 8:00 A.M. and the manager wants to set the departure rate so that the average delay per vehicle is no greater than 9 minutes (measured from the time of the first arrival until the total queue clears). Assuming D/D/1 queuing, what is the minimum departure rate needed to achieve thisarrow_forward
- The cumulative arrival and departure curve of one cycle of an approach lane of a signalized intersection is shown in the adjoining figure. The cycle time is 50 s and the effective red time is 30 s and the effective green time is 20 s. What is the average delay? Cumulative --- Arrival A Cumulative arrival or departure (No. of vehicles) TO 30 #1 Departurearrow_forwardAn approach at a signalized intersection with a 60-second cycle gets 30 seconds of displayed green time. Yellow time is 4 seconds and all-red is 2 seconds (lost time is to be determined from standard assumptions). At the beginning of an effective red there are 4 vehicles in the queue and the saturation flow is 876 veh/h. The arrival rate is given by v(t) = 0.20 - 0.002t [with v(t) in veh/s and t in seconds after the beginning of the effective red]. What is the average vehicle delay for this approach in seconds at the end of the cycle (until the next effective red) that started with the 4 vehicles queued at the beginning of the effective red? (Assume D/D/1 queueing. Please provide you answer in decimal form without units)arrow_forwardAn approach to a signalized intersection has a saturation flow rate of 1800 veh/h. At the beginning of an effective red, there are six vehicles in the queue and vehicles arrive at 900 veh/h. The signal has a 60- second cycle with 25 seconds of effective red. What is the total vehicle delay after one cycle (assume D/D/1 queuing)?arrow_forward
- 11. If cars pass a certain point on a highway at a mean headway of 10 seconds, the vehicle flow rate at the point is: а. 360 vph b. 480 vph с. 750 vph d. 1200 vph 12. The overall capacity of a signalized street network is predominantly limited by the capacity of its a. Links b. Intersections c. Drivers d. Trucks 13. If the peak 15 minutes of the peak hour carry 32% of the peak hour traffic, what is the corresponding peak hour factor? а. 0.84 b. 0.89 с. 0.78 d. 0.72arrow_forwardA 14-km streetcar line travels eastbound and westbound in shared ROW, and in each direction, it has stops every 250 m. Because the line is heavily used, it has a headway of 2.5 min and streetcars stop at each service stop. The running speed of streetcars between stops is 25 km/h (not accounting for stopping at stops). At each stop, streetcars spend 30 sec in acceleration, deceleration and dwell time. The terminal time is 10 min/terminal. The line is being redesigned into a high-quality streetcar line. The new streetcars have double the capacity of existing cars, and the headway of the new line will be increased to 5 min (although some passenger trips might be lost due to the increased stop spacing and increased headway, the travel demand is expected to be at least the same because of the overall performance improvement of the line). Two options are being considered: Option 1: The new stop spacing is 300m. The new line is expected to have a running speed of 40 km/h and the stop time…arrow_forwardTRANSPORTATION ENGINNERING-TRAFFIC SIGNALS An approach to a predetermined signal has 25 seconds of effective green for a 60 second cycle. The approach volume is 500 vehicles/hour and the saturation flow rate is 1400 vehicles/hour. Calculate the average vehicle delay using D/D/1 queing.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning