Chapter 3, Problem 21P
Summary Introduction
To determine: The process control chart and check whether if it in control or not.
Introduction: Control charts may also be termed as Shewhart charts as well as process-behavior charts. It is comes under one of a statistical tools which make an analysis to determine whether the process lies in control or not. Control charts act as a graphically device for making interpretations of statistical process. Upper and lower control limits with respect to data, are set for this purpose.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A machine at the Pacific Fruit Company fills boxes withraisins. The labeled weight of the boxes is 9 ounces. The
company wants to construct an R-chart to monitor the fill-ing process and make sure the box weights are in control.
The quality-control department for the company sampledfive boxes every two hours for three consecutive workingdays. The sample observations are as follows:
Construct an R-chart from these data with 3 control lim-its, plot the sample range values, and comment on process
control.
Samples Box Weights (oz)1 9.06 9.13 8.97 8.85 8.462 8.52 8.61 9.09 9.21 8.953 9.35 8.95 9.20 9.03 8.424 9.17 9.21 9.05 9.01 9.535 9.21 8.87 8.71 9.05 9.356 8.74 8.35 8.50 9.06 8.897 9.00 9.21 9.05 9.23 8.788 9.15 9.20 9.23 9.15 9.069 9.98 8.90 8.81 9.05 9.1310 9.03 9.10 9.26 9.46 8.4711 9.53 9.02 9.11 8.88 8.9212 8.95 9.10 9.00 9.06 8.95
At Quick Car Wash, the wash process is advertised to take less than
8
minutes. Consequently, management has set a target average of
440
seconds for the wash process. Suppose the average range for a sample of
9
cars is
10
seconds. Use the accompanying table to establish control limits for sample means and ranges for the car wash process.
Factors for calculating three-sigma limits for the
x-chart
and R-chart
Size of Sample (n)
Factor for UCL and LCL for
x-chart
(A2)
Factor for LCL for R-Chart
(D3)
Factor for UCL for R-Chart
(D4)
2
1.880
0
3.267
3
1.023
0
2.575
4
0.729
0
2.282
5
0.577
0
2.115
6
0.483
0
2.004
7
0.419
0.076
1.924
8
0.373
0.136
1.864
9
0.337
0.184
1.816
10
0.308
0.223
Part 2
The
UCLR
equals
enter your response here
seconds and the
LCLR
equals
enter your response here
seconds. (Enter your responses rounded to two decimal places.)
The Road King Tire Company in Birmingham wants to moni-tor the quality of the tires it manufactures. Each day the com-pany quality-control manager takes a sample of 100 tires, tests
them, and determines the number of defective tires. The re-sults of 20 samples have been recorded as follows:Construct a p-chart for this process using 2 limits and for each of the last 30 weekdays are shown as follows:describe the variation in the process.
Sample Defectives Sample Defectives1 14 11 182 12 12 103 9 13 194 10 14 205 11 15 176 7 16 187 8 17 188 14 18 229 16 19 2410 17 20 23
Chapter 3 Solutions
OPERATIONS AND SUPPLY CHAIN MANAGEMENT
Ch. 3.S - Prob. 1QCh. 3.S - Prob. 2QCh. 3.S - Prob. 3QCh. 3.S - Prob. 4QCh. 3.S - Prob. 5QCh. 3.S - Prob. 6QCh. 3.S - Prob. 7QCh. 3.S - The Great Lakes Company, a grocery store chain,...Ch. 3.S - Prob. 2PCh. 3.S - Prob. 3P
Ch. 3.S - The Fast Break Computer Company assembles personal...Ch. 3.S - Prob. 5PCh. 3 - Using Sampling and Statistics to Analyze...Ch. 3 - Prob. 2.1ASCCh. 3 - Prob. 3.1ASCCh. 3 - Prob. 4.1ASCCh. 3 - Prob. 5.1ASCCh. 3 - Prob. 1QCh. 3 - Prob. 2QCh. 3 - Prob. 3QCh. 3 - Prob. 4QCh. 3 - Prob. 5QCh. 3 - Prob. 6QCh. 3 - Prob. 7QCh. 3 - Prob. 8QCh. 3 - Prob. 9QCh. 3 - Prob. 10QCh. 3 - Prob. 11QCh. 3 - Prob. 1PCh. 3 - Prob. 2PCh. 3 - Prob. 3PCh. 3 - Prob. 4PCh. 3 - Prob. 5PCh. 3 - Prob. 6PCh. 3 - Prob. 7PCh. 3 - Prob. 8PCh. 3 - Prob. 9PCh. 3 - Prob. 10PCh. 3 - Prob. 11PCh. 3 - Prob. 12PCh. 3 - Prob. 13PCh. 3 - Prob. 14PCh. 3 - Prob. 15PCh. 3 - Prob. 16PCh. 3 - Prob. 17PCh. 3 - Prob. 18PCh. 3 - Prob. 20PCh. 3 - Prob. 21PCh. 3 - Prob. 22PCh. 3 - Prob. 23PCh. 3 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 27PCh. 3 - Prob. 28PCh. 3 - Prob. 29PCh. 3 - Prob. 30PCh. 3 - Prob. 32PCh. 3 - Prob. 33PCh. 3 - Prob. 34PCh. 3 - Prob. 36PCh. 3 - Prob. 37PCh. 3 - Prob. 38PCh. 3 - Prob. 39PCh. 3 - Prob. 40PCh. 3 - Elon Corporation manufactures parts for an...Ch. 3 - Prob. 42PCh. 3 - Prob. 44PCh. 3 - Prob. 45PCh. 3 - Prob. 46PCh. 3 - Prob. 47PCh. 3 - Metropolitan General Hospital is a city-owned...Ch. 3 - Prob. 50PCh. 3 - Prob. 51PCh. 3 - The Shuler Motor Mile is a high-volume discount...Ch. 3 - Prob. 1.1CPCh. 3 - Prob. 2.1CPCh. 3 - Improving Service Time at Daves Burgers Daves...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A process considered to be in control measures an ingredient in ounces. A quality inspector took 10 samples, each with 5 observations as follows: SEE ATTACHED PHOTO Using this information, obtain three-sigma (i.e., z=3) control limits for a mean control chart and control limits for a range chart, respectively. It is known from previous experience that the standard deviation ofthe process is 1.36.arrow_forward4. Cartons of Plaster of Paris are supposed to weigh exactly 32 oz. Inspectors want to develop process control charts. They take 5 samples of 6 boxes per sample and weigh them. Based on the following data, what are the lower and upper control limits for the 3-sigma mean chart and the range chart, respectively? Please keep two decimal places and select the best answers. Select one: a. [33.8, 34.76], [0, 2.00] b. [33.96, 34.60], [0, 1.18] c. [34.01, 34.55], [0, 1.12] d. [34.01, 34.55], [0.52, 2.52] e. [32.6, 35.96], [0, 1.12]arrow_forwardA process considered to be in control measures an ingredient in ounces. A quality inspector took 10 samples, each with 5 observations as follows: Using this information, obtain three-sigma (i.e., z=3) control limits for a mean control chart and control limits for a range chart, respectively. It is known from previous experience that the standard deviation of the process is 1.36. Discuss whether the process is in control or not.arrow_forward
- Rosters Chicken advertises " lite" chicken with 30% fewer calories than standard chicken. When the process for "lite" chicken breast production is in control, the average chicken breast contains 420 calories, and the standard deviation in caloric content of the chicken breast population is 25 calories. Rosters wants to design an x-chart to monitor the caloric content of chicken breasts, where 25 chicken breasts would be chosen at random to form each sample.a) What are the lower and upper control limits for th.is chart if these limits are chosen to be four standard deviations from the target?b) What a re the limits with three standard deviations from the target?arrow_forwardResistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up to produce a large run of resistors of 1,000 ohms each. Use Exhibit 13.7. To set up the machine and to create a control chart to be used throughout the run, 15 samples were taken with four resistors in each sample. The complete list of samples and their measured values are as follows: Use three-sigma control limits. c. Determine the UCL and LCL for a X−X− chart. (Round your answers to 3 decimal places.) d. Determine the UCL and LCL for R-chart. (Leave no cells blank - be certain to enter "0" wherever required. Round your answers to 3 decimal places.)arrow_forwardAt Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its length is between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49 inches and a standard deviation of 0.014 inches. a) is the process capable of meeting specifications? b) Does the process meet specifications?arrow_forward
- At Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its lengthis between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49inches and a standard deviation of 0.014 inches. A) Is the process capable of meeting specifications? B) Does the process meet specifications?arrow_forwardDevelop a p chart with 3 sigma control limits and evaluate whether the process is in statical controlarrow_forward3.1.The Great North Woods Clothing Company sells specialty outdoor clothing through its catalog. A quality problem that generates customer complaints occurs when a warehouse employee fills an order with the wrong items. The company has decided to implement a process control plan by inspecting the ordered items after they have been obtained from the warehouse and before they have been packaged. The company has taken 30 samples (during a 30-day period), each for 100 orders, and recorded the number of defective orders in each sample, as follows Sample Number of Defectives Sample Number of Defectives 1 12 16 6 2 14 17 3 3 10 18 7 4…arrow_forward
- 8 A pizza delivery service wants to track their delivery times. They take eight samples of four deliveries and record the following data. What are the upper and lower control limits of their X-bar chart? (Note: Although it looks similar, the data in the table below is different from the data in the table relating to the UCL and LCL for the R chart.) Sample # 1 2 3 4 5 6 7 8 Item #1 21.1 20.2 24.6 22.6 23.7 20.9 22.4 20.7 Item #2 22.2 20.6 20 20.7 24.1 23.9 24.6 24.4 Item #3 23.0 24.5 23.2 23.0 20.7 22.8 23.0 22.8 Item #4 20.0 23.5 25.5 25.0 20.7 23.2 23.3 24.5 Sum 86.3 88.8 93.3 91.3 89.2 90.8 93.3 92.4 Group of answer choices 25.2, 20.0 25.4, 20.0 23.9, 21.3 24.1, 21.1arrow_forwardStudies on a machine that molds plastic water pipe indicate that when it is injecting1-inch diameter pipe, the process standard deviation is 0.05 inches. The one-inchpipe has a specification of 1-inch plus or minus 0.10 inch. What is the processcapability index (Cp) if the long-run process mean is 1 inch?arrow_forward9. A pizza delivery service wants to track their delivery times. They take eight samples of four deliveries and record the following data. What are the upper and lower control limits of their R-chart? (Note: Although it looks similar, the data in the table below is different from the data in the table relating to the UCL and LCL for the X-bar chart.) Sample # 1 2 3 4 5 6 7 8 Item #1 21.1 20.2 24.1 22.6 21.2 20.0 22.0 20.2 Item #2 21.7 20.6 21.0 22.1 24.1 24.2 24.6 24.9 Item #3 23.5 24.9 23.2 23.0 20.6 22.8 23.4 22.8 Item #4 20.0 23.5 24.8 25.0 20.7 23.2 23.3 24.5 Group of answer choices 7.0, 0.5 9.3, 0.0 8.5 0.0 10.1, 0.0arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.