Improvement in process is achievable when any kind of defect or out of control situation is seeming in the process. The perfection of process is measured with the help of process control chart. On basis of process control chart, it is noted if the process shows some sample beyond the control limits, then it is assumed that some improvement is needed in the process.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Designing an x -Chart Using the Process Standard DeviationThe Sunny Dale Bank monitors the time required to serve customers at the drive-through window because it is an important quality factor in competing with other banks in the city. After analyzing the data gathered in an extensive study of the window operation, bank management determined that the mean time to process a customer at the peak demand period is 5 minutes, with a standard deviation of 1.5 minutes. Management wants to monitor the mean time to process a customer by periodically using a sample size of six customers. Assume that the process variability is in statistical control. Design an x-chart that has a type I error of 5 percent. That is, set the control limits so that there is a 2.5 percent chance a sample result will fall below the LCL and a 2.5 percent chance that a sample result will fall above the UCL. After several weeks of sampling, two successive samples came in at 3.70 and 3.68 minutes, respectively. Is the…
com sells books, videos, DVDs, and CDs through its internet Web site. The company ships thousands of orders each day from seven national distribution centers. BooksCDs.com wants to monitor the quality of its distribution process, specifically the number of “problems” orders. A problem order is one that is delivered to a customer late (i.e., after five days), incorrect or incomplete. The company sampled 500 orders every other day for 20 samples and tracked them to final customer delivery. The results of which are as follows:
Sample
Numbers of Problems Orders
Sample
Numbers of Problems Orders
1
2
3
4
5
6
7
8
9
10
9
21
18
12
25
41
18
19
26
28
11
12
13
14
15
16
14
22
36
17
38
24
15
12
10
16
17
18
19
20
Construct an appropriate control chart for this process using 3-sigma limits and indicate if the process was out of control.
Show work, show how to do the computation
A machine at the Pacific Fruit Company fills boxes withraisins. The labeled weight of the boxes is 9 ounces. The
company wants to construct an R-chart to monitor the fill-ing process and make sure the box weights are in control.
The quality-control department for the company sampledfive boxes every two hours for three consecutive workingdays. The sample observations are as follows:
Construct an R-chart from these data with 3 control lim-its, plot the sample range values, and comment on process
control.
Samples Box Weights (oz)1 9.06 9.13 8.97 8.85 8.462 8.52 8.61 9.09 9.21 8.953 9.35 8.95 9.20 9.03 8.424 9.17 9.21 9.05 9.01 9.535 9.21 8.87 8.71 9.05 9.356 8.74 8.35 8.50 9.06 8.897 9.00 9.21 9.05 9.23 8.788 9.15 9.20 9.23 9.15 9.069 9.98 8.90 8.81 9.05 9.1310 9.03 9.10 9.26 9.46 8.4711 9.53 9.02 9.11 8.88 8.9212 8.95 9.10 9.00 9.06 8.95
Chapter 3 Solutions
OPERATIONS AND SUPPLY CHAIN MANAGEMENT
Ch. 3.S - Prob. 1QCh. 3.S - Prob. 2QCh. 3.S - Prob. 3QCh. 3.S - Prob. 4QCh. 3.S - Prob. 5QCh. 3.S - Prob. 6QCh. 3.S - Prob. 7QCh. 3.S - The Great Lakes Company, a grocery store chain,...Ch. 3.S - Prob. 2PCh. 3.S - Prob. 3P
Ch. 3.S - The Fast Break Computer Company assembles personal...Ch. 3.S - Prob. 5PCh. 3 - Using Sampling and Statistics to Analyze...Ch. 3 - Prob. 2.1ASCCh. 3 - Prob. 3.1ASCCh. 3 - Prob. 4.1ASCCh. 3 - Prob. 5.1ASCCh. 3 - Prob. 1QCh. 3 - Prob. 2QCh. 3 - Prob. 3QCh. 3 - Prob. 4QCh. 3 - Prob. 5QCh. 3 - Prob. 6QCh. 3 - Prob. 7QCh. 3 - Prob. 8QCh. 3 - Prob. 9QCh. 3 - Prob. 10QCh. 3 - Prob. 11QCh. 3 - Prob. 1PCh. 3 - Prob. 2PCh. 3 - Prob. 3PCh. 3 - Prob. 4PCh. 3 - Prob. 5PCh. 3 - Prob. 6PCh. 3 - Prob. 7PCh. 3 - Prob. 8PCh. 3 - Prob. 9PCh. 3 - Prob. 10PCh. 3 - Prob. 11PCh. 3 - Prob. 12PCh. 3 - Prob. 13PCh. 3 - Prob. 14PCh. 3 - Prob. 15PCh. 3 - Prob. 16PCh. 3 - Prob. 17PCh. 3 - Prob. 18PCh. 3 - Prob. 20PCh. 3 - Prob. 21PCh. 3 - Prob. 22PCh. 3 - Prob. 23PCh. 3 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 27PCh. 3 - Prob. 28PCh. 3 - Prob. 29PCh. 3 - Prob. 30PCh. 3 - Prob. 32PCh. 3 - Prob. 33PCh. 3 - Prob. 34PCh. 3 - Prob. 36PCh. 3 - Prob. 37PCh. 3 - Prob. 38PCh. 3 - Prob. 39PCh. 3 - Prob. 40PCh. 3 - Elon Corporation manufactures parts for an...Ch. 3 - Prob. 42PCh. 3 - Prob. 44PCh. 3 - Prob. 45PCh. 3 - Prob. 46PCh. 3 - Prob. 47PCh. 3 - Metropolitan General Hospital is a city-owned...Ch. 3 - Prob. 50PCh. 3 - Prob. 51PCh. 3 - The Shuler Motor Mile is a high-volume discount...Ch. 3 - Prob. 1.1CPCh. 3 - Prob. 2.1CPCh. 3 - Improving Service Time at Daves Burgers Daves...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- BlueMoon Bottlers has a bottle-filling process with a mean value of 64 ounces and a standard deviation of 8 ounces. Suppose the upper and lower specification limits are 71 and 57 ounces, respectively. What is the process capability index of this process? (Note: You MUST show every single step and detailed derivation for full credit)arrow_forward3.1.The Great North Woods Clothing Company sells specialty outdoor clothing through its catalog. A quality problem that generates customer complaints occurs when a warehouse employee fills an order with the wrong items. The company has decided to implement a process control plan by inspecting the ordered items after they have been obtained from the warehouse and before they have been packaged. The company has taken 30 samples (during a 30-day period), each for 100 orders, and recorded the number of defective orders in each sample, as follows Sample Number of Defectives Sample Number of Defectives 1 12 16 6 2 14 17 3 3 10 18 7 4…arrow_forwardThe Scottsdale fire department aims to respond to fire calls in 7 minutes or less, on average. Response times are normally distributed with a standard deviation of 1 minute 42 seconds. Would a sample of 18 fire calls with a mean response time of 7 minutes 21 seconds provide sufficient evidence to show that the goal is not being met at α = .01?arrow_forward
- At Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its length is between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49 inches and a standard deviation of 0.014 inches. a) is the process capable of meeting specifications? b) Does the process meet specifications?arrow_forwardA company making tires for bikes is concerned about the exact width of its cyclocrosstires. The company has a lower specification limit of 22.8 mm and an upper specification limit of 23.2 mm. The standard deviation is 0.15 mm and the mean is 23 mm.What is the process capability index for the process?arrow_forwardUsing appropriate examples, distinguish between ‘attributes’ and ‘variables’ with regards to the measures of quality in Statistical Process Control.arrow_forward
- Rosters Chicken advertises " lite" chicken with 30% fewer calories than standard chicken. When the process for "lite" chicken breast production is in control, the average chicken breast contains 420 calories, and the standard deviation in caloric content of the chicken breast population is 25 calories. Rosters wants to design an x-chart to monitor the caloric content of chicken breasts, where 25 chicken breasts would be chosen at random to form each sample.a) What are the lower and upper control limits for th.is chart if these limits are chosen to be four standard deviations from the target?b) What a re the limits with three standard deviations from the target?arrow_forwardThe specifications for a gasket that installs between two engine parts calls for a thickness of 6.0 mm ± .2 mm. The standard deviation of the process is estimated to be 0.05 mm. The process is known to operate at a mean thickness of 6.1 mm What are the upper and lower specification limits for the gasket? What are the Cp and Cpk values for this process? Is this process capable of producing the desired part?arrow_forwardAssume the following: A quality manager at a popular restaurant in a New York has accurately measured the Cp & Cpk values associated with the delivery times of the food delivered by her restaurant. He has measured these values over an acceptable time period. The measured values are such that: Cp > 1, and Cpk < 1. Then: a. The process is both cappable and centered between the specification limits. b. The process is neither cappable nor centered between the specification limits. c. The process is cappable but not centered between the specification limits. d. The process is not cappable but centered between the specification limits.arrow_forward
- C-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 4 ± .003 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 4.001 inches witha standard deviation of .002 inch. (Answer in Appendix D)a. Calculate the Cpk for this machine.b. Should C-Spec use this machine to produce this part? Why?arrow_forwardThirty patients who check out of the Rock Creek County Regional Hospital each week are asked to complete a ques-tionnaire about hospital service. Since patients do not feel well when they are in the hospital, they typically are very critical of the service. The number of patients who indi-cated dissatisfaction of any kind with the service for each 30-patient sample for a 16-week period is as follows:Construct a control chart to monitor customer satisfactionat the hospital using 3 limits and determine if the processis in control.arrow_forwardThe chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are in control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results Instructor Number of Failures Prof. A 13 Prof. B 0 Prof. C 11 Prof. D 16 What is the estimate of the mean proportion of failures for these instructors?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.