Practical Operations Management
Practical Operations Management
2nd Edition
ISBN: 9781939297136
Author: Simpson
Publisher: HERCHER PUBLISHING,INCORPORATED
bartleby

Concept explainers

Question
Book Icon
Chapter 5, Problem 27P
Summary Introduction

Interpretation: Number of carpets machine B needs to clean more than machine A to achieve break-even.

Concept introduction: The break-even is the point at which total revenue and cost are the same. There is not any gain or loss.

Blurred answer
Students have asked these similar questions
The Decision Sciences Department is tyring to determine whether to rent a slow or fast copier. The department believes that an employee's time is worth $15/hour. The slow copier rents for $4/hr, and it takes an employee an average of 10 minutes to complete copying. The fast copier rents for $15/hr, and it takes an employee an average of 6 minutes to complete copying. On average, four employees per hour need to use the copying machine. (Assume the copying times and interarrival times to the copying machine are exponentially distributed.) Which machine should the department rent to minimize expected total cost per hour? Please note this class revolves around Microsoft Excel so the answer I need needs to show the formulas in Excel, along with any corresponding graphs, etc. Thank you in advance!
During an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.
Ted​ Glickman, the administrator at D.C. General Hospital emergency room faces the problem of providing treatment for patients who arrive at different rates during the day. There are 4 doctors available to treat patients when needed. If not​ needed, they can be assigned other responsibilities​ (such as doing lab​ tests, reports,​ X-ray diagnoses) or else rescheduled to work at other hours.   It is important to provide quick and responsive​ treatment, and Ted feels​ that, on the​ average, patients should not have to sit in the waiting area for more than 4 minutes before being seen by a doctor. Patients are treated on a​ first-come, first-served basis and see the first available doctor after waiting in the queue. The arrival pattern for a typical day is as​ follows:   Time Arrival Rate 9 A.M.−3 P.M. 8 ​patients/hour 3 P.M.−8 P.M. 3 ​patients/hour 8 P.M.−midnight 13 ​patients/hour   Arrivals follow a Poisson​ distribution, and treatment​ times, 12…
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,