Practical Operations Management
2nd Edition
ISBN: 9781939297136
Author: Simpson
Publisher: HERCHER PUBLISHING,INCORPORATED
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 5, Problem 17P
Summary Introduction
Interpretation: Design capacity of parking garage.
Concept introduction: Efficiency is the capability to prevent energy, money, effort, wasting materials and time in doing something or in generating a required result
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Each hour, 100 students want to ride a bus from the student union to Fraternity Row. The admiration places a value of $5/student/hour on each hour that a student is forced to wait for a bus. It costs university $ 10 per bus to send a bus from the student union to Fraternity Row. Assuming that demand occurs at a constant rate, how many buses should be sent each hour from the student union to Fraternity Row?
During an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.
CPU-on-Demand (CPUD) offers real-time high-performance computing services. CPUD owns 1 supercomputer that can be accessed through the Internet. Their customers send jobs that arrive, on average, every 4 hours. The standard deviation of the interarrival times is 4 hours. Executing each job takes, on average, 3 hours on the supercomputer and the standard deviation of the processing time is 3.6 hours. On average, how long will it take to complete a job (from the time it is submitted by the customer until the time it is completed)?
Chapter 5 Solutions
Practical Operations Management
Ch. 5 - Prob. 1DQCh. 5 - Prob. 2DQCh. 5 - Prob. 3DQCh. 5 - Prob. 4DQCh. 5 - Prob. 5DQCh. 5 - Prob. 6DQCh. 5 - Prob. 7DQCh. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - Prob. 3P
Ch. 5 - Prob. 4PCh. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prob. 9PCh. 5 - Prob. 10PCh. 5 - Prob. 11PCh. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - Prob. 15PCh. 5 - Prob. 16PCh. 5 - Prob. 17PCh. 5 - Prob. 18PCh. 5 - Prob. 19PCh. 5 - Prob. 20PCh. 5 - Prob. 21PCh. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Prob. 26PCh. 5 - Prob. 27PCh. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - Prob. 32PCh. 5 - Prob. 33PCh. 5 - Prob. 34PCh. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - Prob. 38PCh. 5 - Prob. 1.1QCh. 5 - Prob. 1.2QCh. 5 - Prob. 1.3QCh. 5 - Prob. 1.4QCh. 5 - Prob. 2.1QCh. 5 - Prob. 2.2QCh. 5 - Prob. 2.3QCh. 5 - Prob. 3.1QCh. 5 - Prob. 3.2QCh. 5 - Prob. 3.3QCh. 5 - Prob. 3.4Q
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The small mail-order firm Sea’s Beginning has onephone line. An average of 60 people per hour call inorders, and it takes an average of one minute to handlea call. Time between calls and time to handle calls areexponentially distributed. If the phone line is busy, Sea’sBeginning can put up to c 2 1 people on hold. If c 2 1people are on hold, a caller gets a busy signal and calls acompetitor. Sea’s Beginning wants only 1% of all callersto get a busy signal. How many people should it be ableto put on hold, that is, what is the required value of c?arrow_forwardFood Goblin Supermarkets use both cashiers and baggers to serve customers at check out. During the peak hours, 8 cashiers and 6 baggers serve approximately 75 customers per hour. On average, a cashier spends 6 minutes at checkout and a bagger spends 4 minutes at bagging to serve a customer. Calculate the utilization of cashiers and their capacity cushion during a peak hour?arrow_forwardPodunk University Operations Research Departmenthas two phone lines. An average of 30 people per hour tryto call the OR Department, and the average length of aphone call is 1 minute. If a person attempts to call whenboth lines are busy, he or she hangs up and is lost to thesystem. Assume that the time between people attempting tocall and service times is exponential.a What fraction of the time will both lines be free?What fraction of the time will both lines be busy? Whatfraction of the time will exactly one line be free?b On the average, how many lines will be busy?c On the average, how many callers will hang up eachhour?arrow_forward
- A small bank is trying to determine how many tellers toemploy. The total cost of employing a teller is $100 perday, and a teller can serve an average of 60 customersper day. On average, 50 customers arrive per day at thebank, and both service times and interarrival times areexponentially distributed. If the delay cost per customerday is $100, how many tellers should the bank hire?arrow_forwardSolve the question below using the attached excel templates with formulas for renting both slow and fast copies (labeled in the excel tabs). Question: The Decision Sciences Department is trying to determine whether to rent a slow or a fast copier. The department believes that an employee’s time is worth $15 per hour. The slow copier rents for $4 per hour, and it takes an employee an average of 10 minutes to complete copying. The fast copier rents for $15 per hour, and it takes an employee an average of six minutes to complete copying. On average, four employees per hour need to use the copying machine. (Assume the copying times and interarrival times to the copying machine are exponentially distributed.) Which machine should the department rent to minimize expected total cost per hour?arrow_forwardCPU-on-Demand (CPUD) offers real-time high-performance computing services. CPUD owns 1 supercomputer that can be accessed through the Internet. Their customers send jobs that arrive, on average, every 5 hours. The standard deviation of the interarrival times is 5 hours. Executing each job takes on average 3 hours on the supercomputer and the standard deviation of the processing time is 4.5 hours. How long does a customer have to wait to have a job completed?arrow_forward
- An automobile company assembles cars in a plant and purchases batteries from a vendor in China. The average cost of each battery is $45. The automobile company takes ownership of the batteries when they arrive at the plant. It takes exactly 12 hours to make a car in the plant and the plant assembles 200 cars per 8-hour shift (currently the plant operates one shift per day). Each car uses one battery. The company holds, on average, 8,000 Batteries in raw material inventory at the plant as a buffer. Assignment: Find the total number of batteries in the plant, on average (in work-in-process at the plant and in raw material inventory). How much are these batteries worth? How many days of supply are held in raw material inventory, on average?arrow_forwardSmith Inc. is a retail mail order firm that currently uses a centralized collection system that requires all checks to be sent to its flotation headquarters. An average of 6 days is required for mailed checks to be received, 3 days for Smith Inc. to process them, and 2 days for the checks to clear through its bank. A proposed lockbox system would decrease the mailing and processing time to 2 days and the check clearing time for 1 day. Smith Inc. has an average daily collection of P250,000. If Smith Inc. adopts this proposed lockbox system, its average cash balance will increase by. A. 1.2M B. 450k C. 750k D. 2Marrow_forwardA small shoe manufacturer makes two styles of shoes: oxfords and loafers. Two machines are used in the process: a cutting machine and a sewing machine. Each type of shoe requires 15 min per pair on the cutting machine. Oxfords require 10 min of sewing per pair, and loafers require 20 min of sewing per pair. Because the manufacturer can hire only one operator for each machine, each process is available for just 8 hours a day. Set up a system of linear inequalities that describes the number of pairs of each style of shoes that the manufacturer can produce within required working hours.arrow_forward
- During the course of an 8-hour day, there are, on average, 5 students in an undergraduate advising office, and each student spends, on average, 10 minutes with an advisor.At what rate do students go to the advising office (in students per hour)?arrow_forwardThe Decision Sciences Department is tyring to determine whether to rent a slow or fast copier. The department believes that an employee's time is worth $15/hour. The slow copier rents for $4/hr, and it takes an employee an average of 10 minutes to complete copying. The fast copier rents for $15/hr, and it takes an employee an average of 6 minutes to complete copying. On average, four employees per hour need to use the copying machine. (Assume the copying times and interarrival times to the copying machine are exponentially distributed.) Which machine should the department rent to minimize expected total cost per hour? Please note this class revolves around Microsoft Excel so the answer I need needs to show the formulas in Excel, along with any corresponding graphs, etc. Thank you in advance!arrow_forwardWhat is the drum, buffer and rope concept that comes from the theory of constraint? (Eli goldratt)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,