Production and Operations Analysis, Seventh Edition
7th Edition
ISBN: 9781478623069
Author: Steven Nahmias, Tava Lennon Olsen
Publisher: Waveland Press, Inc.
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 12.12, Problem 48P
Summary Introduction
Interpretation:
Graphical representation of AOQ curve and value if AOQL.
Concept Introduction:
Average Outgoing Quality curve is the curve that represents the quality of both the incoming as well as the outgoing material, assuming the hundred percnt inspections of rejected lots and also the inspected defective materials are either removed, revised or exchanged.
N = lot size
n = sample size
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
For the double sampling plan for Spire CDs presented in this section, what is theprobability that a lot is rejected on the first sample? Perform the computation forboth p = p0 and p = p1.
Consider the following double sampling plan. First select a sample of 5 from a lotof 100. If there are four or more defectives in the sample, reject the lot. If there isone or fewer defective, accept the lot. If there are two or three defectives, samplean additional five items and reject the lot if the combined number of defectives inboth samples is five or more. If the lot has 10 defectives, what is the probabilitythat a lot passes the inspection?
For the double sampling plan described in Problem 39, determine the following:b. The probability that the lot is rejected based on the second sample.
When a robot welder is functioning properly the cylinders it produces burst (on average) at 3400 psi, with known standard deviation 100 psi. Determine the 3-Sigma mean control chart limits. Test lot sample sizes are n=4 cylinders randomly selected from the production line.
a. Centerline = ____
b. Upper Limit = ____
c. Lower Limit = ____
d. What is the probability that random variation will exceed the ± 3-sigma limits ____. (four decimal places with zero before the decimal)
Chapter 12 Solutions
Production and Operations Analysis, Seventh Edition
Ch. 12.1 - Prob. 2PCh. 12.1 - Prob. 3PCh. 12.1 - Prob. 4PCh. 12.1 - Prob. 5PCh. 12.1 - Prob. 6PCh. 12.2 - Prob. 7PCh. 12.2 - Prob. 8PCh. 12.2 - Prob. 9PCh. 12.2 - Prob. 10PCh. 12.2 - Prob. 11P
Ch. 12.2 - Prob. 12PCh. 12.2 - Prob. 13PCh. 12.3 - Prob. 14PCh. 12.3 - Prob. 15PCh. 12.3 - Prob. 16PCh. 12.3 - Prob. 17PCh. 12.4 - Prob. 18PCh. 12.4 - Prob. 19PCh. 12.4 - Prob. 20PCh. 12.4 - Prob. 21PCh. 12.5 - Prob. 22PCh. 12.6 - Prob. 23PCh. 12.6 - Prob. 24PCh. 12.6 - Prob. 25PCh. 12.6 - Prob. 26PCh. 12.6 - Prob. 27PCh. 12.6 - Prob. 28PCh. 12.9 - Prob. 29PCh. 12.9 - Prob. 30PCh. 12.9 - Prob. 31PCh. 12.9 - Prob. 32PCh. 12.9 - Prob. 33PCh. 12.10 - Prob. 34PCh. 12.10 - Prob. 35PCh. 12.10 - Prob. 37PCh. 12.10 - Prob. 38PCh. 12.10 - Prob. 39PCh. 12.10 - Prob. 40PCh. 12.11 - Prob. 41PCh. 12.11 - Prob. 42PCh. 12.11 - Prob. 43PCh. 12.11 - Prob. 44PCh. 12.12 - Prob. 46PCh. 12.12 - Prob. 47PCh. 12.12 - Prob. 48PCh. 12 - Prob. 49APCh. 12 - Prob. 50APCh. 12 - Prob. 51APCh. 12 - Prob. 52APCh. 12 - Prob. 53APCh. 12 - Prob. 54APCh. 12 - Prob. 55APCh. 12 - Prob. 57APCh. 12 - Prob. 58APCh. 12 - Prob. 59APCh. 12 - Prob. 60APCh. 12 - Prob. 61APCh. 12 - Prob. 62APCh. 12 - Prob. 63APCh. 12 - Prob. 64APCh. 12 - Prob. 65APCh. 12 - Prob. 66APCh. 12 - Prob. 67APCh. 12 - Prob. 68APCh. 12 - Prob. 69APCh. 12 - Prob. 70AP
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- In an acceptance sampling plan developed for lotscontaining 1,000 units, the sample size n is 85. The percentdefective of the incoming lots is 2%, and the probability ofacceptance is 0.64. What is the average outgoing qualityarrow_forwardWhat is the meaning of x ~ N (50, 20)? 1. Sampling distribution of x is distributed with a mean of 20 and a standard deviation of 50 2. x-bar is normally distributed with a mean of 20 and a standard deviation of 50 3. x is normally distributed with a mean of 50 and a standard deviation of 20 4. Sampling distribution of x is distributed with a mean of 50 and a standard deviation of 20arrow_forward20) Consider a production process that produces tires. A quality engineer has taken 15 samples, each containing 100 tires. The total number of defective tires over the 15 samples is 340. The sample standard deviation is Group of answer choices a) 0.011 b) 0.042 c) 0.005 d) 0.022 e) 0.028arrow_forward
- A production manager at a Contour Manufacturing planthas inspected the number of defective plastic molds in 5 randomsamples of 20 observations each. Following are the number ofdefective molds found in each sample:SampleNumber ofDefectsNumber ofObservationsin Sample11202220322041205020Total 6 100Construct a 3-sigma control chart (z 3) with this informationarrow_forwardWhat is the meaning of x ̅ ~ N (50, 2)? 1. The Sampling distribution is distributed normally with a mean of 50 and a standard deviation of 2 2. Sampling distribution of x is distributed normally with a mean of 2 and a standard deviation of 50 3. x is normally distributed with a mean of 50 and a standard deviation of 2 4. x-bar is normally distributed with a mean of 2 and a standard deviation of 50arrow_forwardThe 3-sigma limits for a process whose distribution conforms to the normal distribution includes _______ of the observed values, in the long run. Part 2 A. 99.74% B. 95.44% C. 68.26% D. 50%arrow_forward
- A company employs the following sampling plan: It draws a sample of 10 percentof the lot being inspected. If 1 percent or less of the sample is defective, the lot isaccepted. Otherwise the lot is rejected.b. If a lot contains 1,000 items of which 20 are defective, what is the probabilitythat the lot is accepted?arrow_forwardIf all other factors specified in a sampling plan remain constant, changing the AROfrom 5% to 10% will cause the required sample size to(1) increase.(2) remain the same.(3) decrease.(4) become indeterminate.arrow_forwardA component part for a motorcycle is manufactured by an investment casting process. The air vent opening on this casting is an important functional parameter of the part. The results for five samples are given in the table. The values given have been coded using the last two digits of the dimension Sample Air vent opening diameter (in mm 1 58 61 54 60 2 61 55 58 62 3 66 60 59 55 4 53 57 58 64 5 65 63 79 61 The sample data for a subsequent week had the values: 64, 69, 62, and 78. What conclusion can be reached about the state of the process?arrow_forward
- Since each process capability index relies on the estimate of process standard deviation, which in turns relies on sampling, therefore which following statement is INCORRECT? a. Confidence interval of each capability index should be found, instead of computing only a point estimate. b. Each process capability index follows some distribution. c. Each process capability index is a random variable. d. The distribution of Cpk is approximately normal. e. none of the abovearrow_forwardA single sampling inspection scheme for large lot of mass-produced flanges states:From each lot take and inspect a random sample of 50. If 3 or more defectives, inspect the whole lot and remove all defectives, if less than 3 are found accept the lot without further inspection.a. Obtain the equation for Pa the probability that a lot containing a fraction p of defectives will be accepted, in terms of p.b. Evaluate Pa for p=0.01, 0.02, 0.03, 0.05, 0.07, 0.10, 0.15, 0.20, 0.30. Plotthe operating characteristics and average outgoing quality curve.c. Estimate: (a) the producer’s Risk at p of 2% (b) the consumer’s Risk for pof 5%.arrow_forwardConsider the double sampling plan for Spire CDs described in this section. Over aperiod of one year, 3,860 boxes of records are subject to inspection using this plan.If 60 percent of these batches are “good” (that is, in 60 percent of the batches theproportion of defectives is exactly 10 percent) and 40 percent are “bad” (that is, in40 percent of the batches the proportion of defectives is exactly 30 percent), thenwhat is the expected number of batchesa. Accepted?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.