Production and Operations Analysis, Seventh Edition
7th Edition
ISBN: 9781478623069
Author: Steven Nahmias, Tava Lennon Olsen
Publisher: Waveland Press, Inc.
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 12.6, Problem 26P
Summary Introduction
Interpretation:
Con and Pro positions on using optimization models to design control charts.
Concept Introduction:Control charts are used to measure the effectiveness of the process determining the average value and control limits of the process. The Upper Control Limit (UCL) is the larger value and the Lower Control limit (LCL) is the smaller value of the sample
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The Elon Company manufactures parts for an aircraft company using three computerized numerical controlled (CNC) turning centers. The company wants to decide which machines are capable of producing a specific part with design specifications of 0.0960 inches ±0.018 inches. The machines have the following process parameters:
Machine 1: X= 0.1095, σ = 0.0004
Machine 2: X = 0.0912, σ = 0.006
Machine 3: X = 0.0992, σ = 0.003
Determine which machines (if any) are capable of producing the products within the design specifications.
I'm unable to draw a line above the X, show computations.
(c) Based on what we know about Observation B, if the cutoff value is lowered to 0.2, what happens to the values of sensitivity and specificity? Explain. Use the ROC curve to estimate the values of sensitivity and specificity for a cutoff value of 0.2. If required, round your answers to three decimal places. Do not round intermediate calculations.
Answer Part C, there are no other parts here. I have the sensitivity already and is equal to 1. What is the specificity??If you are not 100% sure you are right, do not attempt this is frustrating. The cutoff value has changed from 0.5 to 0.2. The sensitivity is 1 which is correct. I need help with the specificity. Sensitivity does not equal 1/14 and specificity does not equal 1/31 so don't answer that and do not answer any other parts just answer part C.
"The table below is data on telephone usage time by operators to serve customer requests that will be used to explain the use of Xbar and R-chart".
Question: a. Create UCL and LCL with Limit Control Factor A2b. Create UCL and LCL with Limit Control Factor D3 and D4
Chapter 12 Solutions
Production and Operations Analysis, Seventh Edition
Ch. 12.1 - Prob. 2PCh. 12.1 - Prob. 3PCh. 12.1 - Prob. 4PCh. 12.1 - Prob. 5PCh. 12.1 - Prob. 6PCh. 12.2 - Prob. 7PCh. 12.2 - Prob. 8PCh. 12.2 - Prob. 9PCh. 12.2 - Prob. 10PCh. 12.2 - Prob. 11P
Ch. 12.2 - Prob. 12PCh. 12.2 - Prob. 13PCh. 12.3 - Prob. 14PCh. 12.3 - Prob. 15PCh. 12.3 - Prob. 16PCh. 12.3 - Prob. 17PCh. 12.4 - Prob. 18PCh. 12.4 - Prob. 19PCh. 12.4 - Prob. 20PCh. 12.4 - Prob. 21PCh. 12.5 - Prob. 22PCh. 12.6 - Prob. 23PCh. 12.6 - Prob. 24PCh. 12.6 - Prob. 25PCh. 12.6 - Prob. 26PCh. 12.6 - Prob. 27PCh. 12.6 - Prob. 28PCh. 12.9 - Prob. 29PCh. 12.9 - Prob. 30PCh. 12.9 - Prob. 31PCh. 12.9 - Prob. 32PCh. 12.9 - Prob. 33PCh. 12.10 - Prob. 34PCh. 12.10 - Prob. 35PCh. 12.10 - Prob. 37PCh. 12.10 - Prob. 38PCh. 12.10 - Prob. 39PCh. 12.10 - Prob. 40PCh. 12.11 - Prob. 41PCh. 12.11 - Prob. 42PCh. 12.11 - Prob. 43PCh. 12.11 - Prob. 44PCh. 12.12 - Prob. 46PCh. 12.12 - Prob. 47PCh. 12.12 - Prob. 48PCh. 12 - Prob. 49APCh. 12 - Prob. 50APCh. 12 - Prob. 51APCh. 12 - Prob. 52APCh. 12 - Prob. 53APCh. 12 - Prob. 54APCh. 12 - Prob. 55APCh. 12 - Prob. 57APCh. 12 - Prob. 58APCh. 12 - Prob. 59APCh. 12 - Prob. 60APCh. 12 - Prob. 61APCh. 12 - Prob. 62APCh. 12 - Prob. 63APCh. 12 - Prob. 64APCh. 12 - Prob. 65APCh. 12 - Prob. 66APCh. 12 - Prob. 67APCh. 12 - Prob. 68APCh. 12 - Prob. 69APCh. 12 - Prob. 70AP
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Alcohol Dragster On board most alcohol dragsters is a computer that compiles datainto a number of different categories during each race. The table below shows someof the actual data from a past race.Time inseconds The front wheels, at each end of the front axle, are 22.07 inches in diameter. Derive aformula that will convert rpm’s from a 22.07-inch wheel into miles per hour. Test yourformula on all six rows of the table. Explain any discrepancies between the table valuesand the values obtained from your formula.arrow_forwardSTAR Co. provides paper to smaller companies with volumes that are not large enough to warrant dealing directly with the paper mill. STAR receives 100-feet-wide paper rolls from the mill and cuts the rolls into smaller rolls of widths 12, 15, and 30 feet. The demands for these widths vary from week to week. The following cutting patterns have been established. Pattern Number 12‐ft 15‐ft 30‐ft Trim Loss (ft) 1 0 6 0 10 2 0 0 3 10 3 8 0 0 4 4 3 0 2 4 5 7 1 0 1 Trim loss is the leftover paper from a pattern (e.g., for pattern 4, 3(12) + 0(15) + 2(30) = 96 feet used results in 100 − 96 = 4 foot of trim loss). Orders in hand for the coming week are 5,680 12-foot rolls, 1,670 15-foot rolls, and 3,340 30-foot rolls. Any of the three types of rolls produced in excess of the orders in hand will be sold on the open market at the selling price. No inventory is held. (a) Formulate an integer programming model that will determine how many 100-foot rolls to cut into each of the…arrow_forwardJanice Sanders, CEO of Pine Crest Medical Clinic, is concerned over the number of times patients must wait more than 30 minutes beyond their scheduled appointments. She asked her assistant to take random samples of 55 patients to see how many in each sample had to wait more than 30 minutes. Each instance is considered a defect in the clinic process. The table below contains the data for 15 samples. Sample Number of Defects Sample Number of Defects Sample Number of Defects 1 3 6 4 11 1 2 6 7 7 12 3 3 4 8 1 13 7 4 3 9 5 14 7 5 6 10 2 15 3 a. Assuming Janice Sanders is willing to use three-sigma control limits, construct the upper and lower control limits. The UCLp equals to what and the LCLp equals to what (Enter your responses rounded to four decimal places.…arrow_forward
- STAR Co. provides paper to smaller companies whose volumes are not large enough to warrant dealing directly with the paper mill. STAR receives 100-feet-wide paper rolls from the mill and cuts the rolls into smaller rolls of widths 12, 15, and 30 feet. The demands for these widths vary from week to week. The following cutting patterns have been established: Number of: Pattern 12ft. 15ft. 30ft. Trim Loss 1 0 4 1 10 ft. 2 4 3 0 7 ft. 3 8 0 0 4 ft. 4 2 1 2 1 ft. 5 2 3 1 1 ft. Trim loss is the leftover paper from a pattern (e.g., for pattern 4, 2(12) + 1(15) + 2(30) = 99 feet used resulting in foot of trim loss). Orders in hand for the coming week are 5,670 12-foot rolls, 1,680 15-foot rolls, and 3,350 30-foot rolls. Any of the three types of rolls produced in excess of the orders in hand will be sold on the open market at the selling price. No inventory is held. (a) Formulate an integer programming model that will determine how many 100-foot rolls to cut into…arrow_forwardJohn is a newly minted quality engineer at MakeStuff Inc. His boss tells him to increasethe process capability index of their main product. John is somewhat lazy and does notwant to tackle the variation in the process, so he decides to simply increase the upperspecification limit and reduce the lower specification limit. Does this increase the process capability index?a. No, it does not, because the variation in the process stays unchanged.b. Yes, it does, though one might question if the underlying process is really better.c. That depends on many other variables, including the control limits.d. No, the process capability index would only change if the control limits were changed.arrow_forwardDescribe the relationship between symptoms and problems. Also, describe and explain the three general types of error that can occur in problem-solving. Give examples.arrow_forward
- A manufacturer of programmable calculators is attempting to determine a reasonable free-service period for a model it will introduce shortly. The manager of product testing has indicated that the calculators have an expected life of 30 months. Assume product life can be described by an exponential distribution. T / MTBF e-T /MTBF T / MTBF e-T /MTBF T / MTBF e-T /MTBF 0.10 0.9048 2.60 0.0743 5.10 0.0061 0.20 0.8187 2.70 0.0672 5.20 0.0055 0.30 0.7408 2.80 0.0608 5.30 0.0050 0.40 0.6703 2.90 0.0550 5.40 0.0045 0.50 0.6065 3.00 0.0498 5.50 0.0041 0.60 0.5488 3.10 0.0450 5.60 0.0037 0.70 0.4966 3.20 0.0408 5.70 0.0033 0.80 0.4493 3.30 0.0369 5.80 0.0030 0.90 0.4066 3.40 0.0334 5.90 0.0027 1.00 0.3679 3.50 0.0302 6.00 0.0025 1.10 0.3329 3.60 0.0273 6.10 0.0022 1.20 0.3012 3.70 0.0247 6.20 0.0020 1.30 0.2725 3.80 0.0224 6.30 0.0018 1.40 0.2466 3.90 0.0202 6.40 0.0017 1.50 0.2231 4.00 0.0183 6.50 0.0015 1.60 0.2019 4.10 0.0166 6.60 0.0014 1.70 0.1827 4.20…arrow_forwardRajan wanted a radio from Jacky's. It appears that Rajan is particularly interested in purchasing a Radio from the inexpensive retailer's sales manager for consumer electronics. He tells Jacky, the salesperson at the inexpensive store where he thinks he'll get the best deal, that his old radio died and he wants to listen to his favourite tunes. He wants a replacement radio as quickly as possible. In three and a half weeks, Rajan's favourite model will be 10% off.He suspects Rajan won't wait and will find another job. Jacky will earn less on the lowered price. He thinks that telling Rajan of the sale makes little sense.When Jacky tells Rajan that the radio set he wants is no longer available and won't be for another week, Rajan is enraged. Fearing losing the business, Jacky begs his sales manager, Michelle, to speed up delivery. Michelle says it's impossible and suggests Jacky tell Rajan the store can get the set in 24 hours and sell him the demo model. Michelle says the sample is new…arrow_forwardWith which decisions related to FMS design or control can the following methodsassist? Also, briefly describe how each method would be used.c. Mathematical programmingarrow_forward
- The process of packing 3 16-ounce bottles of Hershey chocolate syrup in super-sized packages like those sold at Sam’s and Costco is an example of:arrow_forwardWhen will you use scatter diagram?a. For 2 variables that have relationshipb. For 2 variables that have no relationshipc. For data that are inversely proportionald. For data that are directly proportionale. None of the abovearrow_forwardMr. Ferdinand is a well known entrepreneur who sells fresh organic beef to persons in the localcommunity. Customers love the quality of meet that Mr. Ferdinand sells so they tend torecommend his product to other persons. Recently, Mr. Ferdinand has been running out of beefto sell to his customers. One customer suggests to him that he must use past sales records toforecast demand for his beef so that he can meet his customers demand. 1. Using a numerical example, demonstrate to Mr. Ferdinand how he can use a three-week and a four-week weighted moving average to forecast demand for his beef.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,